MONTHYEARW3F1-2020-0047, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Reactors2020-12-18018 December 2020 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System, and Components (Sscs) for Nuclear Power Reactors Project stage: Request ML21039A6412021-01-28028 January 2021 NRR E-mail Capture - NRC LIC-109 Acceptance Review Results for Waterford 3 50.69 LAR Project stage: Acceptance Review W3F1-2021-0003, Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B2021-02-0808 February 2021 Application for Technical Specification Change to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B Project stage: Request ML21099A0022021-04-14014 April 2021 Regulatory Audit in Support of Review of Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors EPID L-2020-LLA-0279 Project stage: Approval ML21134A2122021-05-21021 May 2021 Audit Meeting Agenda and Audit Questions for LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System, and Components for Nuclear Power Reactors Project stage: Meeting ML21167A1442021-06-24024 June 2021 Summary of Regulatory Audit in Support of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System and Components for Nuclear Power Reactors, LAR Project stage: Approval ML21218A0402021-07-26026 July 2021 NRR E-mail Capture - Final RAIs to Entergy Operations, Waterford Steam Electric Station, Unit 3 LAR to Adopt 10 CFR 50.69 Project stage: RAI W3F1-2021-0050, Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt2021-10-0101 October 2021 Response to U. S. Nuclear Regulatory Commission Request for Additional Information Regarding License Amendment Request to Adopt Project stage: Request ML21349B3642021-12-15015 December 2021 Supplement - Application to Implement an Alternate Defense-in-Depth Categorization Process, an Alternate Pressure Boundary Categorization Process, and an Alternate Seismic Categorization Process in Accordance Project stage: Supplement ML22209A1062022-01-20020 January 2022 NRR E-mail Capture - (External_Sender) Options Moving Forward Regarding Waterford TSTF-505 and 50.69 Project stage: Other W3F1-2022-0009, Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors2022-04-25025 April 2022 Supplement to Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components (Sscs) for Nuclear Power Reactors Project stage: Supplement W3F1-2022-0015, Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf.2022-05-16016 May 2022 Response to Request for Additional Information to License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - Ritstf. Project stage: Response to RAI ML22215A2062022-08-0303 August 2022 NRR E-mail Capture - Waterford 3 - LAR to Adopt Title 10 of the Code of Federal Regulations, Section 50.69: Loe and Completion Date Update Project stage: Approval W3F1-2022-0049, Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-5052022-08-19019 August 2022 Response to Request for Additional Information Regarding License Amendment Requests to Adopt 10 CFR 50.69 and TSTF-505 Project stage: Response to RAI ML22300A2082022-11-30030 November 2022 Issuance of Amendment No. 269 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Approval 2021-06-24
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML21160A0572021-08-16016 August 2021 Summary of Regulatory Audit in Support of Digital Upgrade License Amendment Request (EPID L-2020-LLA-0164)Non-Proprietary ML21167A1442021-06-24024 June 2021 Summary of Regulatory Audit in Support of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, System and Components for Nuclear Power Reactors, LAR ML16181A2512017-11-0808 November 2017 NRC Report for the Audit of Entergy Nuclear Operations, Inc'S. Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1-Flooding for Waterford Steam Electric Station, Unit 3 ML17054C5292017-05-0909 May 2017 Aging Management Programs Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review ML16299A2822016-11-10010 November 2016 Scoping and Screening Methodology Audit Report Regarding Waterford Steam Electric Station, Unit 3 License Renewal Application Review ML16294A5112016-10-21021 October 2016 Severe Accident Mitigation Analysis Site Audit Regarding Waterford Steam Electric Station, Unit 3 ML15272A3982015-10-0606 October 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15071A3372015-03-18018 March 2015 Regulatory Audit Report in Support of License Amendment Request to Change the Updated Final Safety Analysis Report Clarifying Pressurizer Heaters Function for Natural Circulation ML14344A2122015-02-12012 February 2015 Audit of the Licensee'S Management of Regulatory Commitments - Audit Performed August 13-14, 2014 ML1208704852012-04-0303 April 2012 Regulatory Audit Scheduled to Begin 5/7/2012 in Support of the License Amendment Request to Adopt NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Generating Plants, 2001 Edition ML1115800732011-08-29029 August 2011 Audit of the Licensee'S Management of Regulatory Commitments - Audit Performed May 11-12, 2011 ML0822400882008-08-14014 August 2008 Audit of the Licensee'S Management of Regulatory Commitments ML0801403182008-01-28028 January 2008 Staff Audit Report on Results of Corrective Actions to Address GSI-191 GL 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design-Basis Accidents at PWRs ML0425903572004-09-15015 September 2004 Audit of the Licensee'S Management of Regulatory Commitments 2021-08-16
[Table view] Category:Letter
MONTHYEARIR 05000382/20244022024-10-10010 October 2024 Security Baseline Inspection Report 05000382/2024402 Public IR 05000382/20244032024-10-0909 October 2024 Security Baseline Inspection Report 05000382/2024403 IR 05000382/20240112024-10-0101 October 2024 State Fire Protection Team Inspection Report 05000382/2024011 IR 05000382/20230042024-09-25025 September 2024 Integrated Inspection Report 05000382/2023004, Disputed Non-Cited Violation Revised ML24268A1132024-09-24024 September 2024 Acknowledgment of Response to NRC Inspection Report 05000382/2024013, and Notice of Violation ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000382/20240052024-08-21021 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2024005 IR 05000382/20240132024-08-20020 August 2024 Notice of Violation; NRC Inspection Report 05000382/2024013 ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment 05000382/LER-2024-004, Automatic Reactor Trip Due to Lightning Strike2024-08-15015 August 2024 Automatic Reactor Trip Due to Lightning Strike IR 05000382/20240022024-08-0808 August 2024 Integrated Inspection Report 05000382/2024002 ML24164A2512024-08-0707 August 2024 Issuance of Amendment No. 271 Technical Specification Change to Revise Surveillance Requirements Included in the Surveillance Frequency Control Program ML24213A1632024-08-0101 August 2024 2024 Waterford Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test2024-07-10010 July 2024 Automatic EFAS Actuation During Surveillance Test ML24150A3852024-06-0404 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000382/2024011) and Request for Information ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 ML24141A1012024-05-20020 May 2024 Amended Integrated Inspection Report 05000382/2023004 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure2024-05-16016 May 2024 Automatic Reactor Trip Due to Transformer Failure 05000382/LER-2024-001, Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure2024-05-15015 May 2024 Manual Reactor Trip Due to Engineered Safety Features Actuation System Relay Failure ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000382/20240012024-05-0606 May 2024 Integrated Inspection Report 05000382/2024001 ML24067A1032024-04-25025 April 2024 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams IR 05000382/20244012024-03-18018 March 2024 Material Control and Accounting Program Inspection Report 05000382/2024401 ML24074A3742024-03-15015 March 2024 Acknowledgement of Response to NRC Inspection Report 05000382/2023004 and Disputed Non-Cited Violation ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24032A0032024-03-0606 March 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0053 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000382/20230062024-02-28028 February 2024 Annual Assessment Letter for Waterford Steam Electric Station, Unit 3 Report 05000382/2023006 05000382/LER-2023-004, Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement2024-02-14014 February 2024 Non-Compliance with Technical Specifications Due to Performing Startup Channel 1 Functional Testing During Fuel Movement ML24039A1992024-02-12012 February 2024 – Integrated Inspection Report 05000382/2023004 IR 05000382/20230102024-01-31031 January 2024 Comprehensive Engineering Team Inspection Report 05000382/2023010 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 05000382/LER-2023-003, Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing2023-12-30030 December 2023 Steam Generator Tube Degradation Indicated by Failed In-Situ Pressure Testing ML23340A2292023-12-28028 December 2023 Withdrawal of an Amendment Request to Revise Technical Specification 3/4.3.2 to Remove Exemption from Testing Certain Relays at Power to Support Elimination of Potential Single Point Vulnerability (EPID L-2022-LLA-0169)-LTR ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1442023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000382/20230032023-11-14014 November 2023 Integrated Inspection Report 05000382/2023003 and Notice of Violation ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000382/20234012023-10-0404 October 2023 Cyber Security Inspection Report 05000382/2023401 (Cover Letter Only) IR 05000382/20230052023-08-21021 August 2023 Updated Inspection Plan for Waterford Steam Electric Station, Unit 3 - (Report 05000382/2023005) IR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 IR 05000382/20230022023-08-0808 August 2023 Integrated Inspection Report 05000382/2023002 2024-09-06
[Table view] |
Text
June 24, 2021 Site Vice President Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
SUBJECT:
WATERFORD STEAM ELECTRIC STATION, UNIT 3 -
SUMMARY
OF REGULATORY AUDIT IN SUPPORT OF 10 CFR 50.69, RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS, AND COMPONENTS FOR NUCLEAR POWER REACTORS LICENSE AMENDMENT REQUEST (EPID L-2020-LLA-0279)
Dear Sir or Madam:
By letter dated December 18, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20353A433), Entergy Operations, Inc. (the licensee) submitted a license amendment request for the Waterford Steam Electric Station, Unit 3 (Waterford 3). The proposed amendment would modify the Waterford 3 licensing basis by the addition of a license condition, to allow for the implementation of the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power plants. Implementation of 10 CFR 50.69 will allow the licensee to improve focus on equipment that has safety significance resulting in improved plant safety.
To support the review of the license amendment request, the U.S. Nuclear Regulatory Commission (NRC) staff conducted an audit of the licensees related non-docketed information (e.g., calculations, reports, and vendor oversight plans) from April 14, 2021, to June 11, 2021, including a virtual audit meeting held from June 1, 2021, through June 3, 2021. The NRC staff did not identify any significant issues during the audit; however, the NRC staff did identify the need for additional information. Requests for additional information will be transmitted at a future date. A summary of the regulatory audit is enclosed.
If you have any questions, please contact me, at 301-415-1383 or by e-mail to Perry.Buckberg@nrc.gov.
Sincerely,
/RA/
Perry H. Buckberg, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-382
Enclosure:
Regulatory Audit Summary cc: Listserv
REGULATORY AUDIT
SUMMARY
LICENSE AMENDMENT REQUEST TO ADOPT THE REQUIREMENTS OF 10 CFR 50.69, RISK-INFORMED CATEGORIZATION AND TREATMENT OF STRUCTURES, SYSTEMS AND COMPONENTS FOR NUCLEAR POWER REACTORS ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION, UNIT 3 DOCKET NO. 50-382
1.0 BACKGROUND
A regulatory audit is an activity undertaken by the U.S. Nuclear Regulatory Commission (NRC) staff to examine and evaluate licensee information with the intent to gain an understanding of, verify, or identify information that will require docketing to support the basis of a licensing or regulatory decision.
By letter dated December 18, 2020 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML20353A433), Entergy Operations, Inc. (the licensee) submitted a license amendment request for the Waterford Steam Electric Station, Unit 3 (Waterford 3, WF3). The proposed amendment would modify the Waterford 3 licensing basis, by the addition of a license condition to allow for the implementation of the provisions of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power plants. Implementation of 10 CFR 50.69 will allow the licensee to improve focus on equipment that has safety significance resulting in improved plant safety.
Following a preliminary review of the license amendment request, the NRC staff concluded that a regulatory audit would be needed to review the licensees non-docketed information (e.g.,
calculations, reports, and vendor oversight plans) related to the subject of its application to acquire additional understanding about the amendment request and to determine whether additional information would be needed to be docketed to complete the staffs safety evaluation.
2.0 AUDIT ACTIVITIES AND OBSERVATIONS The NRCs audit plan was issued on April 14, 2021 (ADAMS Accession No. ML21099A002),
and provided a high-level overview of the audits virtual format, the audit scope, and listed NRC staff who would be performing the audit. A more detailed agenda for the June 1-3, 2021, audit and the list of audit questions was issued on May 21, 2021 (ADAMS Accession No. ML21134A212).
On April 14, 2021, the NRC staff began its audit of non-docketed licensee documents using an internet-based portal provided by the licensee. On May 21, 2021, the staff issued a letter containing the topics and questions resulting from the audit of documents in the portal for use during the planned audit meeting. From June 1-3, 2021, the NRC staff held a virtual meeting Enclosure
with the licensee to discuss the documents on the portal and the topics and questions contained in May 21, 2021 letter.
3.0 AUDIT RESULTS On June 3, 2021, the NRC staff held an exit meeting with the licensee to inform the licensee that the formal audit had been completed satisfactorily, that the staff expected the response to APLA Question 5 regarding human factors to be updated in the portal for staff review, and that requests for additional information will be issued by the staff in the near future.
4.0 PARTICIPANTS NRC Staff and Support Entergy Mihaela Biro Remy Devoe Alexander Schwab Mark Thigpen Sunwoo Park Cecil Mahan De Wu Thomas Carr Steve Alferink Alan Harris James Chang Andrew Spotts Perry Buckberg Wesley Johnson B.P. Jain David Passehl Mark Wilk (Support - PNNL) Vince Andersen 5.0 AUDITED DOCUMENTATION Entergy Report, PSA-WF3-07-01, Waterford 3 Re-Examination of External Events Evaluation in the IPEEE [Individual Plant Examination of External Events], dated November 2017.
Entergy Report, PSA-WF3-04-01, Waterford 3 Seismic Risk Bounding Evaluation, dated June 6, 2018.
Entergy Report, PSA-WF3-01-LE, WF3 PSA [Probabilistic Safety Analysis] Large Early Release Frequency (LERF) Model, dated May 2020.
Entergy Report, PSA-WF3-03-ES-01, WF3 Fire PRA [Probabilistic Risk Assessment]
Equipment and Cable Selection Notebook, dated December 2019.
Entergy Report, PSA-WF3-03-ES-02, Circuit Analysis and Failure Probability Development, dated December 2019.
PRA-WF3-05-003, Waterford 3 Fire PRA Quantification Model Preparation and Database Development, dated December 2019.
Entergy Report, PSA-WF3-03-FSS-06, Development of Fire Non-suppression Factors for WF3 Fire PRA Scenarios, dated December 2019.
PSA-WF3-03-UNC-02, WF3 Fire PRA Parametric Uncertainty Analysis (UNCERT),
dated December 2019.
Entergy Report, PSA-WF3-03-FSS-02, Waterford 3 PSA Fixed Ignition Source Zone of Influence Methods, dated December 2019.
Entergy Report, PSA-WF3-03-FSS-03. Waterford 3 Transient Fire Scenario Report, dated December 2019.
PSA-WF3-03-PRM, WF3 Fire PRA Plant Response Model (PRM) Notebook, dated December 2019.
Appendix E of PSA-WF3-03-PRM, WF3 Fire PRA Plant Response Model (PRM)
Notebook, dated December 2019.
ML21167A144 OFFICE NRR/DORL/LPL/PM NRR/DORL/LPL4/PMit NRR/DORL/LPL4/LA NRR/DRA/APLA/BC NAME PBuckberg BJain PBlechman RPascarelli DATE 6/23/2021 6/23/2021 6/22/2021 6/23/2021 OFFICE NRR/DRA/APLC/BC NRR/DORL/LPL4/BC NRR/DORL/LPL4/PM NAME SRosenberg JDixon-Herrity PBuckberg DATE 6/23/2021 6/24/2021 6/24/2021