IR 05000482/2021010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 30: Line 30:
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Vincent G. Digitally signed by Vincent G.
Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Reactor Safety


Gaddy Gaddy Date: 2021.09.09 09:14:19-05'00'
Docket No. 05000482 License No. NPF-42
Vincent G. Gaddy, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 05000482 License No. NPF-42 Enclosure:
 
As stated cc w/ encl: Distribution via LISTSERV
Enclosure:
As stated
 
cc w/ encl: Distribution via LISTSERV


=SUMMARY=
=SUMMARY=
Line 40: Line 43:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 53: Line 55:


==REACTOR SAFETY==
==REACTOR SAFETY==
===71111.21M - Design Bases Assurance Inspection (Teams)
The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:


===71111.21M - Design Bases Assurance Inspection (Teams) The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:
Design Review - Risk-Significant/Low Design Margin Components (IP Section 02.02) (5 Samples 1 Partial)
Design Review - Risk-Significant/Low Design Margin Components (IP Section 02.02) (5 Samples 1 Partial)
: (1) 125 V DC Bus NK01
: (1) 125 V DC Bus NK01
Line 71: Line 75:
* Vendor documents and recommendations
* Vendor documents and recommendations
* Circuit breaker wiring diagrams
* Circuit breaker wiring diagrams
* Degraded voltage relaying setpoint calculations
* Degrtage ring spoicions
* Component maintenance history
* Component maintenance history
* Circuit breaker protective device settings
* Circuit breaker protective device settings
Line 106: Line 110:
* Change packages for modifications to tank to support periodic tank inspections and repairs
* Change packages for modifications to tank to support periodic tank inspections and repairs
: (6) Evaluation of Operator Procedures and Actions Related to Components
: (6) Evaluation of Operator Procedures and Actions Related to Components
* Time sensitive action OPA-RHR, Control room operator action to secure residual heat removal pumps during a high-pressure event
* Time sensitive action OPA-RHR, Control room operator action to secure residual heat removal pumps during a hi gh-pressure event
* Time sensitive action OPA-SGOVERFL, Control room operator action to throttle auxiliary feedwater flow to the steam generators to prevent overfill of the steam generators
* Time sensitive action OPA-SGOVERFL, Control room operator action to throttle auxiliary feedwater flow to the steam generators to prevent overfill of the steam generators
* Time sensitive action OPA-NSAFW-BF, Control room and field operator actions to initiate startup and align the non-safety auxiliary feedwater pump following failure of the safety-related auxiliary feedwater pumps Design Review - Large Early Release Frequency (LERFs) (IP Section 02.02) ===
* Time sensitive action OPA-NSAFW-BF, Control room and field operator actions to initiate startup and align the non-safety auxiliary feedwater pump following failure of the safety-related auxiliary feedwater pumps Design Review - Large Early Release Frequency (LERFs) (IP Section 02.02)===
{{IP sample|IP=IP 71111.21|count=1}}
{{IP sample|IP=IP 71111.21|count=1}}
: (1) 480 V Motor Control Center NG001B
: (1) 480 V Motor Control Center NG001B
Line 119: Line 123:
* Circuit cable sizing
* Circuit cable sizing
* Component maintenance history
* Component maintenance history
* Procedures for preventive maintenance, inspection, and testing
* Prorrtive mcpectioti
 
Modificii - Permt ModsIPti) (6 Sple s)


===Modification Review - Permanent Mods (IP Section 02.03) (6 Samples)===
( Change Pkage 20184,eplent of ITT Bton ndic
: (1) Change Package 20184, Replacement of ITT Barton Flow Indicator
* Critical design attributes
* Critical design attributes
* Environmental qualification of indicator
* Environmental qualification of indicator
Line 151: Line 156:
* Affected electrical cable raceway and interconnection wiring drawings
* Affected electrical cable raceway and interconnection wiring drawings
* Surveillance test procedure
* Surveillance test procedure
* Completed work order
* Ckrder
 
Ri of Operati*pience Issues (IPtion 02.) (4 Sple s)
 
( Wfrk Operati*perienc -,RCormiotice 2017 -06, Btytyhargerhort -Circtrentontritionso Fault C Distributiyst
 
( Wfrk Operati*perienc -,s ofltimate Heati Ienty Thriliyimum Fl Linesisf Stage Tank
 
( Wfrk Operati*perienc -,iscy oftion ttoul have Prtfillmentfetyction, Eironmentualif icion Rrentsortmosictmum


===Review of Operating Experience Issues (IP Section 02.06) (4 Samples)===
( Wfrk Operati*perienc -,RCormiotice 2019 -
: (1) Wolf Creek Operating Experience 2018-0465, NRC Information Notice 2017-06, Battery and Battery Charger Short-Circuit Current Contributions to a Fault on the DC Distribution System
Emyieneror*citatiyst Diode Fail
: (2) Wolf Creek Operating Experience 2018-0503, Loss of Ultimate Heat Sink Inventory Through Auxiliary Feedwater Minimum Flow Lines During a Loss of the Condensate Storage Tank
: (3) Wolf Creek Operating Experience 2018-0847, Discovery of a Condition that Could have Prevented Fulfillment of a Safety Function, Environmental Qualification Requirements for Atmospheric Steam Dumps
: (4) Wolf Creek Operating Experience 2019-0417, NRC Information Notice 2019-002, Emergency Diesel Generator Excitation System Diode Failures


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Line 164: Line 174:
==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
The inspectors verified no proprietary information was retained or documented in this report.
* On August 12, 2021, the inspectors presented the design basis assurance inspection (teams) inspection results to Mr. J. McCoy, Site Vice President, and other members of the licensee staff.
* On August 12, 2021, the inspector s presented the design basis assurance inspection (teams) inspection results to Mr. J. McCoy, Site Vice P resident, and other members of the licensee staff.


=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type       Designation   Description or Title                                     Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                     Date
Procedure Date
71111.21M Calculations 41-14.02-F     RWST Displacements for New Seismic Analysis             0
71111.21M Calculations 41-14.02-F RWST Displacements for New Seismic Analysis 0
69466-M-001   Non-Safety Auxiliary Feedwater Pump Drawdown From the   1
69466-M-001 Non-Safety Auxiliary Feedwater Pump Drawdown From the 1
Condensate Storage Tank
Condensate Storage Tank
69466-M-002   Non-Safety Auxiliary Feedwater Pump Net Positive Suction 1
69466-M-002 Non-Safety Auxiliary Feedwater Pump Net Positive Suction 1
Head
Head
69466-M-003   Non-Safety Auxiliary Feedwater Pump Analysis and System 1
69466-M-003 Non-Safety Auxiliary Feedwater Pump Analysis and System 1
Resistance Curve
Resistance Curve
69466-M-004   Non-Safety Auxiliary Feedwater Pump Piping Vibration     0
69466-M-004 Non-Safety Auxiliary Feedwater Pump Piping Vibration 0
Analysis
Analysis
AN 98-001     Uncertainty for Refueling Water Storage Tank (RWST)     0
AN 98-001 Uncertainty for Refueling Water Storage Tank (RWST) 0
Level-Low, (Lo-Lo-1) Automatic Switchover Setpoint and
Level-Low, (Lo-Lo-1) Automatic Switchover Setpoint and
Technical Specification changes
Technical Specification changes
AN-98-001-000- Uncertainty for Refueling Water Storage Tank (RWST)     0
AN-98-001-000- Uncertainty for Refueling Water Storage Tank (RWST) 0
CN-001         Level-Low, (Lo-Lo-1) Automatic Switchover Setpoint and
CN- 001 Level-Low, (Lo-Lo-1) Automatic Switchover Setpoint and
Technical Specification changes
Technical Specification changes
AN-98-026     Determination of RWST Depletion prior to Completion of   0
AN-98-026 Determination of RWST Depletion prior to Completion of 0
Recirculation Switchover and ECCS Recirculation Flow
Recirculation Switchover and ECCS Recirculation Flow
Requirement
Requirement
BN-20         RWST Volumes and Level Set Points                       3
BN-20 RWST Volumes and Level Set Points 3
BN-20-CN002   RWST Volume and Level Set Points                         3
BN-20-CN002 RWST Volume and Level Set Points 3
BN-J-001       RWST Level Transmitter Density Errors                   01
BN-J-001 RWST Level Transmitter Density Errors 01
BN-J-002       Total Loop Uncertainty Calculation - System BN, Loops   01
BN-J-002 Total Loop Uncertainty Calculation - System BN, Loops 01
0930, 0931, 0932, and 0933
0930, 0931, 0932, and 0933
BN-J-002-001- Total Loop Uncertainty Calculation - System BN, Loops   01
BN-J-002-001-Total Loop Uncertainty Calculation - System BN, Loops 01
CN003         0930, 0931, 0932, and 0933
CN003 0930, 0931, 0932, and 0933
BN-J-002-01-   Total Loop Uncertainty Calculation System BN, Loops 0930 01
BN-J-002-01-Total Loop Uncertainty Calculation System BN, Loops 0930 01
CN001         0931 0932 0933
CN001 0931 0932 0933
ECCS-47       SI Pumps - NPSH from RWST                               0
ECCS-47 SI Pumps - NPSH from RWST 0
EJ-30-003-     RHR Pumps A & B NPSH                                     03
EJ-30-003-RHR Pumps A & B NPSH 03
CN002
CN002
FL-08         Control Building Flooding                               003
FL-08 Control Building Flooding 003
FL-18         Containment Flood Levels for LOCA and MSLB               03
FL-18 Containment Flood Levels for LOCA and MSLB 03
Inspection Type             Designation     Description or Title                                     Revision or
 
Procedure                                                                                             Date
Inspection Type Designation Description or Title Revision or
H-08             NB System Protective Relays                             5
Procedure Date
KJ-M-017         Emergency Diesel Standby Generator (KKJOlB) Runtime     1
H-08 NB System Protective Relays 5
KJ-M-017 Emergency Diesel Standby Generator (KKJOlB) Runtime 1
Without ESW Flow
Without ESW Flow
NK-E-001-004-   125 VDC Class 1E Battery System Sizing, Voltage Drop and 005
NK-E-001-004-125 VDC Class 1E Battery System Sizing, Voltage Drop and 005
005             Short Circuit Studies.
005 Short Circuit Studies.
SA-92-009       Calculation of RWST Depletion Rate and ECCS             0
SA-92-009 Calculation of RWST Depletion Rate and ECCS 0
Recirculation Switchover Time Following a Postulated
Recirculation Switchover Time Following a Postulated
Primary/Secondary Pipe Rupture
Primary/Secondary Pipe Rupture
WES-009-CALC-   Wolf Creek/Callaway Post-LOCA Containment Water Level   1
WES-009-CALC-Wolf Creek/Callaway Post-LOCA Containment Water Level 1
001             Calculation
001 Calculation
XX-E-006         AC System Analysis                                       006
XX-E-006 AC System Analysis 006
XX-E-006         AC System Analysis                                       8
XX-E-006 AC System Analysis 8
XX-E-006         AC System Analysis                                       9
XX-E-006 AC System Analysis 9
XX-E-009         System NB, NG, PG Undervoltage/Degraded Voltage Relay   1
XX-E-009 System NB, NG, PG Undervoltage/Degraded Voltage Relay 1
Setpoints
Setpoints
Corrective Action Condition Report 2007-01786, 47791, 74322, 104253, 104389, 104390,
Corrective Action Condition Report 2007-01786, 47791, 74322, 104253, 104389, 104390,
Documents         (CR-)           128300, 133632, 135223, 66596, 66841, 103323, 104458,
Documents (CR- ) 128300, 133632, 135223, 66596, 66841, 103323, 104458,
104515, 105136, 105564, 105741, 105744, 105969, 106015,
104515, 105136, 105564, 105741, 105744, 105969, 106015,
114883, 118661, 124196, 129263, 130202, 10000916,
114883, 118661, 124196, 129263, 130202, 10000916,
Line 227: Line 238:
10000792
10000792
Corrective Action Condition Report 10007140, 10007142, 10007145, 10007147, 10007163,
Corrective Action Condition Report 10007140, 10007142, 10007145, 10007147, 10007163,
Documents         (CR-)           10007662, 10007666, 10007668, 10007802, 10008018,
Documents (CR- ) 10007662, 10007666, 10007668, 10007802, 10008018,
Resulting from                     10007616, 10008023, 10008009, 10007407, 10007596,
Resulting from 10007616, 10008023, 10008009, 10007407, 10007596,
Inspection                         10007621, 10007625, 10007632, 10007633, 10007667,
Inspection 10007621, 10007625, 10007632, 10007633, 10007667,
10007975, 10008021, 10008065, 10008092, 10008133
10007975, 10008021, 10008065, 10008092, 10008133
Drawings         8809D54         T HAVE Loop 4 (TEST) Protection IV Card Frame 08         5A
Drawings 8809D54 T HAVE Loop 4 (TEST) Protection IV Card Frame 08 5A
Cabinet 04 Interconnecting Wiring Diagram
Cabinet 04 Interconnecting Wiring Diagram
C-0C0212         Refueling & Reactor Makeup Water Storage Tanks,         7
C-0C0212 Refueling & Reactor Makeup Water Storage Tanks, 7
Concrete Neat Line & Reinforcing Plans and Sections
Concrete Neat Line & Reinforcing Plans and Sections
E-11001         Main Single Line Diagram                                 13
E-11001 Main Single Line Diagram 13
E-11NB01         Lower Medium Voltage Sys. Class 1E 4.16 kV Single Line   9
E-11NB01 Lower Medium Voltage Sys. Class 1E 4.16 kV Single Line 9
Meter and Relay Diagram
Meter and Relay Diagram
Inspection Type Designation     Description or Title                                     Revision or
 
Procedure                                                                                 Date
Inspection Type Designation Description or Title Revision or
E-11NG01       Low Voltage System Class 1E 480V Single Line Meter &     16
Procedure Date
E-11NG01 Low Voltage System Class 1E 480V Single Line Meter & 16
Relay Diagram
Relay Diagram
E-11NG01       Low Voltage System Class 1E 480V Single Line Meter &     16
E-11NG01 Low Voltage System Class 1E 480V Single Line Meter & 16
Relay Diagram
Relay Diagram
E-11NK01       Class 1E 125V DC System Meter & Relay Diagram             20
E-11NK01 Class 1E 125V DC System Meter & Relay Diagram 20
E-11NK02       CLASS IE 125V DC System, Meter & Relay Diagram           19
E-11NK02 CLASS IE 125V DC System, Meter & Relay Diagram 19
E-13EP02A       Schematic Diagram Accumulator Isolation Valves           4
E-13EP02A Schematic Diagram Accumulator Isolation Valves 4
E-13GK04       Schematic Diagram Battery Rm. Hydrogen Alarm             00
E-13GK04 Schematic Diagram Battery Rm. Hydrogen Alarm 00
E-13NB01       Lower Medium Class 1E Meter and Voltage System 4.16 kV   5
E-13NB01 Lower Medium Class 1E Meter and Voltage System 4.16 kV 5
Three Line Relay Diagram
Three Line Relay Diagram
E-13NB02       Lower Medium Voltage Sys. Class 1E 4.16 KV Three Line     3
E-13NB02 Lower Medium Voltage Sys. Class 1E 4.16 KV Three Line 3
Meter & Relay Diagram
Meter & Relay Diagram
E-13NB03       Lower Medium Voltage Sys. Class 1E 4.16kv Meter and       8
E-13NB03 Lower Medium Voltage Sys. Class 1E 4.16kv Meter and 8
Relay Three Line Diagram
Relay Three Line Diagram
E-13NB12       Schematic Diagram Class 1E Bus NB01 Feeder Brkr.         7
E-13NB12 Schematic Diagram Class 1E Bus NB01 Feeder Brkr. 7
2NB0112
2NB0112
E-13NB13       Schematic Diagram Class 1E Bus NB01 Feeder Brkr.         7
E-13NB13 Schematic Diagram Class 1E Bus NB01 Feeder Brkr. 7
2NB0109
2NB0109
E-13NE10       Schematic Diagram 4.16KV DG Feeder Breaker 152NB0111     22
E-13NE10 Schematic Diagram 4.16KV DG Feeder Breaker 152NB0111 22
E-13NG10       Schematic Diagram 4.16KV LC XFMR Feeder Breakers         5
E-13NG10 Schematic Diagram 4.16KV LC XFMR Feeder Breakers 5
2NB0110 and 152NB0113
2NB0110 and 152NB0113
E-17000A       Termination List Notes                                   20
E-17000A Termination List Notes 20
J-14001         Control Room Equipment Arrangement.                       12
J-14001 Control Room Equipment Arrangement. 12
KD-74-96, Sh. 1 One Line Diagram                                         73
KD-74-96, Sh. 1 One Line Diagram 73
KD-7496         One Line Diagram                                         73
KD-7496 One Line Diagram 73
KD-7496A       Distribution System Equipment Lineup Limitations         11
KD-7496A Distribution System Equipment Lineup Limitations 11
M-12BN01       Piping & Instrumentation Diagram, Borated Refueling Water 1
M-12BN01 Piping & Instrumentation Diagram, Borated Refueling Water 1
Storage System
Storage System
M-1H3311       HEATING VENTILATING & AIR COND. CONTROL                   07
M-1H3311 HEATING VENTILATING & AIR COND. CONTROL 07
BUILDING EL. 2000'-0" AREA 1
BUILDING EL. 2000'-0" AREA 1
M-1P3411       Drainage System (LE & LF) Control Building, EL. 2O16'- 0 01
M-1P3411 Drainage System (LE & LF) Control Building, EL. 2O16'- 0 01
Area 1
Area 1
M-622.1-00036- Electrical Motor Data Sheet, Bahnson Ref: N-0027 Thru N- 1W
M-622.1-00036-Electrical Motor Data Sheet, Bahnson Ref: N-0027 Thru N-1W
W03             003`
W03 003`
Inspection Type         Designation     Description or Title                                       Revision or
 
Procedure                                                                                           Date
Inspection Type Designation Description or Title Revision or
N1387-637A-B1   SGK05A & SGK05B Air Conditioner, Electrical Schematic     08
Procedure Date
WIP-M-761-       T HAVE Loop 1 (Test) Protection Card Frame 2/4 Cabinet 1   00
N1387-637A-B1 SGK05A & SGK05B Air Conditioner, Electrical Schematic 08
2328-W01-A-1   Interconnecting Wiring Diagram.
WIP-M-761-T HAVE Loop 1 (Test) Protection Card Frame 2/4 Cabinet 1 00
Engineering   20452           BBTY-441A RCS LP4 Narrow THOT Lead Resistance             00
2328-W01-A-1 Interconnecting Wiring Diagram.
Changes                       Imbalance
Engineering 20452 BBTY-441A RCS LP4 Narrow THOT Lead Resistance 00
CP 014426.       Utilization of Spare RTD BBTE0430A1,                       02
Changes Imbalance
CP 20316         NIS C-2 Setpoint Revision                                 0
CP 014426. Utilization of Spare RTD BBTE0430A1, 02
Document         EC Engineering for SGK05A/B Fuse Replacement, Rev. 0       0
CP 20316 NIS C-2 Setpoint Revision 0
Document EC Engineering for SGK05A/B Fuse Replacement, Rev. 0 0
Number: 020350,
Number: 020350,
EC. 020347       RCS NARROW RANGE RTD LEAD RESISTANCE                     0
EC. 020347 RCS NARROW RANGE RTD LEAD RESISTANCE 0
IMBALANCE
IMBALANCE
Engineering   LTR-SCS-19-17   Wolf Creek Nuclear Operating Corporation C-2 Interlock     0
Engineering LTR-SCS-19-17 Wolf Creek Nuclear Operating Corporation C-2 Interlock 0
Evaluations                   Setpoint Revision
Evaluations Setpoint Revision
PQE-J-601B-P01   Atmospheric Relief Valve 8005N I/P Converter w/ Metallic   0
PQE-J-601B-P01 Atmospheric Relief Valve 8005N I/P Converter w/ Metallic 0
Nozzle Cap
Nozzle Cap
WCAP-11528       RCS Flow Anomaly Investigation Report                     04/01/1988
WCAP-11528 RCS Flow Anomaly Investigation Report 04/01/1988
WCAP-9917       Setpoint Study for Kansas Gas and Electric Co./Kansas City 06/01/1981
WCAP-9917 Setpoint Study for Kansas Gas and Electric Co./Kansas City 06/01/1981
Power and Light Co. Wolf Creek Unit and Union Electric Co.
Power and Light Co. Wolf Creek Unit and Union Electric Co.
Callaway Units 1 and 2 (SNUPPS Projects)
Callaway Units 1 and 2 (SNUPPS Projects)
Miscellaneous                 Technical Requirements Manual                             72
Miscellaneous Technical Requirements Manual 72
04-00383         WOLF CREEK GENERATING STATION - ISSUANCE OF               07/12/2004
04-00383 WOLF CREEK GENERATING STATION - ISSUANCE OF 07/12/2004
AMENDMENT
AMENDMENT
RE: TECHNICAL SPECIFICATIONS 3.8.1 AND 3.8.4 - AC
RE: TECHNICAL SPECIFICATIONS 3.8.1 AND 3.8.4 - AC
AND DC SOURCES
AND DC SOURCES
                                          (TAC NO. MB8763)
(TAC NO. MB8763)
50.59 for DECP   50.59 screening for RCS Narrow range RTD Lead             0
50.59 for DECP 50.59 screening for RCS Narrow range RTD Lead 0
Resistance Imbalance engineering design change.
Resistance Imbalance engineering design change.
AD 20347         Applicability Determination for 50-59 for DCP 020347       0
AD 20347 Applicability Determination for 50-59 for DCP 020347 0
ANSI/I EEE       American National Standard - General requirements for dry- 11/30/1979
ANSI/I EEE American National Standard - General requirements for dry-11/30/1979
C57.12.01-1979   type distribution and power transformers
C57.12.01-1979 type distribution and power transformers
Bulletin 6.10-2C ITE Series 5600 Motor Control Centers - design and         02/1976
Bulletin 6.10-2C ITE Series 5600 Motor Control Centers - design and 02/1976
application guide
application guide
CJ16224-l       Dedication Plan for MERSEN Fuse PIN: AJT30                 2, 11/25/19
CJ16224-l Dedication Plan for MERSEN Fuse PIN: AJT30 2, 11/25/19
Inspection Type Designation   Description or Title                                       Revision or
 
Procedure                                                                                 Date
Inspection Type Designation Description or Title Revision or
CP 20350       CP 20350 Attachment 2 for XX-E-006 REV 8 ETAP             10-31-2019
Procedure Date
MODEL\XX-E-006 REV 8.O
CP 20350 CP 20350 Attachment 2 for XX-E-006 REV 8 ETAP 10-31-2019
CR 00145500   Level Of Effort Evaluation for NRC 3Q2020 Integrated       N/A
MODEL\\XX-E-006 REV 8.O
CR 00145500 Level Of Effort Evaluation for NRC 3Q2020 Integrated N/A
Inspection Self-revealing Green NCV
Inspection Self-revealing Green NCV
E-009         Technical Specification for Metal-Clad Switchboard for the 8
E-009 Technical Specification for Metal-Clad Switchboard for the 8
Standardized Nuclear Unit Power Plant System
Standardized Nuclear Unit Power Plant System
E-009-00342   Metal-Clad Switchgear - Types M26 and M36 for Magne-       W09
E-009-00342 Metal-Clad Switchgear - Types M26 and M36 for Magne-W09
                (GEH-1802X)   Blast Air Circuit Breakers
(GEH-1802X) Blast Air Circuit Breakers
E-009B         Design Specification for 4.16 KV and 13.8 KV Vertical Lift 1
E-009B Design Specification for 4.16 KV and 13.8 KV Vertical Lift 1
Vacuum Circuit Breakers
Vacuum Circuit Breakers
E-009B-00009   Instruction Manual for Siemens Type 3AF-GER/GEU Vertical   W06
E-009B-00009 Instruction Manual for Siemens Type 3AF-GER/GEU Vertical W06
Lift Direct Replacement Vacuum Circuit Breakers
Lift Direct Replacement Vacuum Circuit Breakers
E-00NG         System Description Low Voltage System - 480 V (Class 1E   5
E-00NG System Description Low Voltage System - 480 V (Class 1E 5
Power System)
Power System)
E-018         Technical Specification for Motor Control Centers For The 13
E-018 Technical Specification for Motor Control Centers For The 13
Wolf Creek Generation Station
Wolf Creek Generation Station
E-018A-00007   Instruction Manual For Molded Case Circuit Breaker         W15
E-018A-00007 Instruction Manual For Molded Case Circuit Breaker W15
E-10NB         System Description Lower Medium Voltage System - 4.16     00
E-10NB System Description Lower Medium Voltage System - 4.16 00
kV (Class IE Power System)
kV (Class IE Power System)
E-11NG20       Low Voltage System Class 1E Motor Control Center           312
E-11NG20 Low Voltage System Class 1E Motor Control Center 312
Summary
Summary
Frame Book 29- Westinghouse Series C Motor Circuit Protector             05/1986
Frame Book 29-Westinghouse Series C Motor Circuit Protector 05/1986
111
111
GEK-7310C     Maintenance Manual - GE Power Circuit Breakers Types
GEK-7310C Maintenance Manual - GE Power Circuit Breakers Types
AKR-3/3A-50 and AKRU-3/3A-50
AKR-3/3A-50 and AKRU-3/3A-50
LTAM WCNOC-   480 Volt Safety Related MCC Bucket Replacement             1/20/2021
LTAM WCNOC-480 Volt Safety Related MCC Bucket Replacement 1/20/2021
09-0152
09-0152
LTR-SCS-16-59 Westinghouse Evaluation to Support 95% Probability/95%     0
LTR-SCS-16-59 Westinghouse Evaluation to Support 95% Probability/95% 0
Confidence Level Uncertainty Values for Non-Westinghouse
Confidence Level Uncertainty Values for Non-Westinghouse
Supplied Instrumentation for the Wolf Creek Generating
Supplied Instrumentation for the Wolf Creek Generating
Station Revised Thermal Design Procedure Uncertainty
Station Revised Thermal Design Procedure Uncertainty
Calculations in WCAP-18083-P.
Calculations in WCAP-18083-P.
M-10BN         Borated Refueling Water Storage                           1
M-10BN Borated Refueling Water Storage 1
Inspection Type       Designation   Description or Title                                         Revision or
 
Procedure                                                                                         Date
Inspection Type Designation Description or Title Revision or
MGE EOOP-11   Molded Case Circuit Breaker and Ground Fault Sensor         37A
Procedure Date
MGE EOOP-11 Molded Case Circuit Breaker and Ground Fault Sensor 37A
Testing
Testing
N/A           Maintenance Strategy - XNG01                                 8/5/201
N/A Maintenance Strategy - XNG01 8/5/201
NB SHR 2020   System Health Report - System NB (Low-Medium Voltage
NB SHR 2020 System Health Report - System NB (Low-Medium Voltage
Q3Q4           4.16 kV) Third and Fourth Quarter
Q3Q4 4.16 kV) Third and Fourth Quarter
PIR 2007-00368 Supplement to Condition Report 2008-002718 - DG Parallel     06/19/2008
PIR 2007-00368 Supplement to Condition Report 2008-002718 - DG Parallel 06/19/2008
CR Response with Scenario Table
CR Response with Scenario Table
PSA-05-0011   Probabilistic Risk Assessment System Notebook - Electrical   3
PSA-05-0011 Probabilistic Risk Assessment System Notebook - Electrical 3
Power Systems
Power Systems
TS-19-0001     Fuse list Change for Fuses 109FU, 110FU, 111FU               N/A
TS-19-0001 Fuse list Change for Fuses 109FU, 110FU, 111FU N/A
Procedures AI 12-002     FME Consideration and General Guidance for Major             0A
Procedures AI 12-002 FME Consideration and General Guidance for Major 0A
Components
Components
AI 21-016     OPERATOR TIME CRITICAL ACTIONS VALIDATION                   20
AI 21-016 OPERATOR TIME CRITICAL ACTIONS VALIDATION 20
AI 29B-003     Guidance To Prevent Unacceptable Preconditioning Prior To   2
AI 29B-003 Guidance To Prevent Unacceptable Preconditioning Prior To 2
Testing
Testing
ALR 00-47D     RWST Lev LoLo 1 Auto XFR                                     10B
ALR 00-47D RWST Lev LoLo 1 Auto XFR 10B
ALR 00-82A     PR Over PWR Rod Stop                                         11
ALR 00-82A PR Over PWR Rod Stop 11
ALR 301       125 VDC CLASS IE SWITCHBOARD NK01                           10
ALR 301 125 VDC CLASS IE SWITCHBOARD NK01 10
AP 12-003     Foreign Material Exclusion                                   18
AP 12-003 Foreign Material Exclusion 18
AP 14A-003     Scaffolding Construction                                     26
AP 14A-003 Scaffolding Construction 26
CNT-ME-507     Installation & Inspection of Cable Terminations             13
CNT-ME-507 Installation & Inspection of Cable Terminations 13
E-009Q-01     13.8 KV and 4.16 KV Switchgear Inspection and Testing       37A
E-009Q-01 13.8 KV and 4.16 KV Switchgear Inspection and Testing 37A
E-017         Technical Specification for Load Center Unit Substations for 07
E-017 Technical Specification for Load Center Unit Substations for 07
the Standardized Nuclear Unit Power Plant System
the Standardized Nuclear Unit Power Plant System
E-020         DC Distribution Switchboards                                 009
E-020 DC Distribution Switchboards 009
E-050A-00010   Installation Instructions for AT&T Lineage 2000 Round Cell   W01
E-050A-00010 Installation Instructions for AT&T Lineage 2000 Round Cell W01
Batteries Racks and Seismic Bracing at Wolf Creek Nuclear
Batteries Racks and Seismic Bracing at Wolf Creek Nuclear
Power Plant
Power Plant
E-050A-00010   Installation Instructions for AT&T Lineage 2000 Round Cell   W01
E-050A-00010 Installation Instructions for AT&T Lineage 2000 Round Cell W01
Batteries Racks and Seismic Bracing at Wolf Creek Nuclear
Batteries Racks and Seismic Bracing at Wolf Creek Nuclear
Power Plant
Power Plant
E-051B         Electrically Operated Manually Controlled Transfer Switches 01
E-051B Electrically Operated Manually Controlled Transfer Switches 01
E-051B-0031   Instruction Manual for Transfer Switch Panels               W04
E-051B-0031 Instruction Manual for Transfer Switch Panels W04
Inspection Type Designation Description or Title                                           Revision or
 
Procedure                                                                                   Date
Inspection Type Designation Description or Title Revision or
E-075-00016 Instruction Manual for Installation, Operations, &             W06
Procedure Date
E-075-00016 Instruction Manual for Installation, Operations, & W06
Maintenance of ESWS Transformers 225 KVA FOR
Maintenance of ESWS Transformers 225 KVA FOR
SNUPPS 10466
SNUPPS 10466
E-10NK       System Description for 125-Volt DC System (Class 1E           007
E-10NK System Description for 125-Volt DC System (Class 1E 007
Power System)
Power System)
E-11013     Installation, Inspe49ction, and Testing Details for Electrical 49
E-11013 Installation, Inspe49ction, and Testing Details for Electrical 49
Equipment and Cables.
Equipment and Cables.
EMG C-0     Loss of All AC Power                                           45
EMG C-0 Loss of All AC Power 45
EMG ES-12   Transfer to Cold Leg Recirculation                             24
EMG ES-12 Transfer to Cold Leg Recirculation 24
EMG ES-12   Transfer to Cold Leg Recirculation                             24
EMG ES-12 Transfer to Cold Leg Recirculation 24
EMG FR-H1   Response to Loss of Secondary Heat Sink                       37
EMG FR-H1 Response to Loss of Secondary Heat Sink 37
I-ENG-005   Infrared Thermography                                         11
I-ENG-005 Infrared Thermography 11
MGE EOOP-05 Insulation Resistance Testing                                 27
MGE EOOP-05 Insulation Resistance Testing 27
MGE EOOP-11 Molded Case Circuit Breaker and Ground Fault Sensor           37A
MGE EOOP-11 Molded Case Circuit Breaker and Ground Fault Sensor 37A
Testing
Testing
MGE TL-001   Wiring Termination and Lug/Connector Installation             26A
MGE TL-001 Wiring Termination and Lug/Connector Installation 26A
MPE E009Q-03 Inspection and Testing Of Siemens Vacuum Circuit Breakers     11
MPE E009Q-03 Inspection and Testing Of Siemens Vacuum Circuit Breakers 11
MPE E017Q-04 Circuit Breaker Test for AKR 50 and AKR 30 Breakers           31B
MPE E017Q-04 Circuit Breaker Test for AKR 50 and AKR 30 Breakers 31B
MPE E017Q-07 Load Center Transformer Inspection                             17A
MPE E017Q-07 Load Center Transformer Inspection 17A
OE 2018-0465 NRC Information Notice 2017-06                                 06/14/2018
OE 2018-0465 NRC Information Notice 2017-06 06/14/2018
OFN NB-042   Loss Of Offsite Power To NB01 (NB02) With EDG Paralleled       15
OFN NB-042 Loss Of Offsite Power To NB01 (NB02) With EDG Paralleled 15
STC-IC-441   Channel Calibration Nuclear Instrumentation System Power       16A
STC-IC-441 Channel Calibration Nuclear Instrumentation System Power 16A
Range Channel N41
Range Channel N41
STN KU-010   Station Blackout Diesel and Non-Safety AFW Pump Test           13
STN KU-010 Station Blackout Diesel and Non-Safety AFW Pump Test 13
STS CH-029   Refueling Water Storage Tank Boron Concentration               8A
STS CH-029 Refueling Water Storage Tank Boron Concentration 8A
Determination
Determination
STS EN-100A Containment Spray Pump A Inservice Test                       31
STS EN-100A Containment Spray Pump A Inservice Test 31
STS IC-201A TAVG, Delta T and Pressurizer Pressure Channel                 24
STS IC-201A TAVG, Delta T and Pressurizer Pressure Channel 24
Operational Test-Protection Set 1
Operational Test-Protection Set 1
STS IC-442   Channel Calibration Nuclear Instrumentation System Power       16A
STS IC-442 Channel Calibration Nuclear Instrumentation System Power 16A
Range Channel N42
Range Channel N42
STS IC-443   Channel Calibration Nuclear Instrumentation System Power       16A
STS IC-443 Channel Calibration Nuclear Instrumentation System Power 16A
Range Channel N43
Range Channel N43
Inspection Type       Designation     Description or Title                                       Revision or
 
Procedure                                                                                         Date
Inspection Type Designation Description or Title Revision or
STS IC-444     Channel Calibration Nuclear Instrumentation System Power   17A
Procedure Date
STS IC-444 Channel Calibration Nuclear Instrumentation System Power 17A
Range Channel N44
Range Channel N44
STS IC-500G     Delta T/TAVG Instrumentation Loop 4 Channel Calibration   28B
STS IC-500G Delta T/TAVG Instrumentation Loop 4 Channel Calibration 28B
STS IC-508A     Refueling Water Storage Tank Level Transmitter Calibration 8
STS IC-508A Refueling Water Storage Tank Level Transmitter Calibration 8
STS IC-508B     Refueling Water Storage Tank Level Instrumentation         9
STS IC-508B Refueling Water Storage Tank Level Instrumentation 9
Channel Calibration
Channel Calibration
STS IC-803A     4KV Undervoltage - Grid Degraded Voltage Channel           8
STS IC-803A 4KV Undervoltage - Grid Degraded Voltage Channel 8
Calibration of NB01 Bus
Calibration of NB01 Bus
STS KJ-011A     EDG NE01 24 Hour Run                                       38
STS KJ-011A EDG NE01 24 Hour Run 38
STS MT-018     Weekly Inspection of 125 VDC Lead-Calcium Batteries       23B
STS MT-018 Weekly Inspection of 125 VDC Lead-Calcium Batteries 23B
STS MT-020     125 VDC Battery Charger Operational Test                   26B
STS MT-020 125 VDC Battery Charger Operational Test 26B
STS MT-020     125 VDC Battery Charger Operational Test                   26B
STS MT-020 125 VDC Battery Charger Operational Test 26B
STS MT-024A     Functional Test of 480 and 120 Volt Molded Case Circuit   16A
STS MT-024A Functional Test of 480 and 120 Volt Molded Case Circuit 16A
Breakers
Breakers
STS MT-024B     Functional Test of 480 and 120 Volt Molded Case Circuit   17
STS MT-024B Functional Test of 480 and 120 Volt Molded Case Circuit 17
Breakers
Breakers
STS MT-024C     Functional Test of 480 and 120 Volt Molded Case Circuit   16
STS MT-024C Functional Test of 480 and 120 Volt Molded Case Circuit 16
Breakers
Breakers
SYS AP-122     Non-Safety Auxiliary Feed Pump Operation                   13
SYS AP-122 Non-Safety Auxiliary Feed Pump Operation 13
Work Orders Work Order (WO- 12-359863-000, 14-389904-000, 18-442405-001, 18-
Work Orders Work Order (WO-12-359863-000, 14-389904-000, 18-442405-001, 18-
                      )               442406-001, 18-442408-001, 18-442426-001, 19-448418-
) 442406- 001, 18-442408-001, 18-442426- 001, 19-448418-
000, 19-448418-002, 19-448418-004, 20-465688-000, 20-
000, 19-448418- 002, 19-448418- 004, 20- 465688-000, 20-
458894-000, 20-458895-000, 20-458896-000, 20-458898-
458894- 000, 20- 458895-000, 20-458896- 000, 20-458898-
000, 20-458900-000, 20-458901-000, 20-458905-002, 20-
000, 20-458900- 000, 20-458901- 000, 20- 458905-002, 20-
461085-000, 20-461085-001, 20-462400-000, 20-462400-
461085- 000, 20- 461085-001, 20-462400- 000, 20-462400-
001, 20-465688-000, 20-466586-000, 20-461440-000, 20-
001, 20-465688- 000, 20-466586- 000, 20- 461440-000, 20-
466529-000, 20-466528-000, 19-455924-000, 14-383742-
466529- 000, 20- 466528-000, 19-455924- 000, 14-383742-
000, 20-458317-001, 01-224289-000, 10-327766-000, 12-
000, 20-458317- 001, 01-224289- 000, 10- 327766-000, 12-
359819-000, 17-421614-000, 08-303906-000,. 04-259537-
359819- 000, 17-421614-000, 08-303906- 000,. 04-259537-
000, 13-372243-000, 15-405081-000, 18-444596-000, 17-
000, 13-372243- 000, 15-405081- 000, 18-444596 -000, 17-
21067-003, 18-437036 000, 20-467595-000, 20-458103-
21067- 003, 18-437036 000, 20-467595- 000, 20-458103-
001
001
16
16
}}
}}

Latest revision as of 23:13, 19 November 2024

Design Basis Assurance Inspection (Teams) Inspection Report 05000482/2021010
ML21243A099
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/09/2021
From: Vincent Gaddy
Region 4 Engineering Branch 1
To: Reasoner C
Wolf Creek
References
IR 2021010
Download: ML21243A099 (16)


Text

September 09, 2021

SUBJECT:

WOLF CREEK GENERATING STATION - DESIGN BASIS ASSURANCE INSPECTION (TEAMS) INSPECTION REPORT 05000482/2021010

Dear Mr. Reasoner:

On August 12, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station and discussed the results of this inspection with Mr. J. McCoy, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Reactor Safety

Docket No. 05000482 License No. NPF-42

Enclosure:

As stated

cc w/ encl: Distribution via LISTSERV

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (teams) inspection at Wolf Creek Generating Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

===71111.21M - Design Bases Assurance Inspection (Teams)

The inspectors evaluated the following components and listed applicable attributes, permanent modifications, and operating experience:

Design Review - Risk-Significant/Low Design Margin Components (IP Section 02.02) (5 Samples 1 Partial)

(1) 125 V DC Bus NK01
  • Walkdown of 125 V DC system
  • System health reports, component maintenance history, and corrective action program documents
  • Calculations for electrical distribution, system load flow/voltage drop, short-circuit, and electrical protection
  • Protective device settings and feeder circuit breaker ratings
  • Procedures for preventive maintenance, inspection, and testing
  • Results of completed preventative maintenance on the bus, load center, transformer, and feeder breakers
  • Maintenance programs for batteries and battery chargers associated with the bus
  • Calculations for the AC input to the battery chargers
(2) 4.16 KV Class 1E Switchgear NB001
  • Design basis calculations
  • Corrective actions resulting from previous violations
  • Vendor documents and recommendations
  • Circuit breaker wiring diagrams
  • Degrtage ring spoicions
  • Component maintenance history
  • Circuit breaker protective device settings
  • Procedures for preventive maintenance, inspection, and testing
(3) Main Steam Isolation Valve ABHV0011
  • Component maintenance history and system health reports
  • Corrective action documents
  • Preventive maintenance bases
  • Maintenance rule status and basis documents
  • Procedures for inservice testing
  • Acceptance criteria for actuation logic and slave relay surveillance testing
  • Completed surveillance and inservice tests
  • Calculations for valve stoke time adjustment
  • Calculations of setpoints and uncertainty
  • Environmental qualification of solenoid valves and limit switches
(4) Non-Safety Auxiliary Feedwater Pump PAP01
  • Walkdown of pump and applicable portions of the system
  • Design calculations
  • Vortex and air intrusion analysis
  • Required operator actions
  • Emergency operating procedures
  • Maintenance and testing
  • Surveillance acceptance criteria
  • Net positive suction head calculations
  • Pump curves
  • System drawings and isometrics
  • Vendor documents and recommendations
  • Corrective action documents
(5) Refueling Water Storage Tank TBN01
  • Setpoint and total loop uncertainty calculations
  • Calibration procedures and acceptance criteria calculations for level instrumentation
  • Seismic calculations for refueling water storage tank anchor bolts
  • Change packages for modifications to tank to support periodic tank inspections and repairs
(6) Evaluation of Operator Procedures and Actions Related to Components
  • Time sensitive action OPA-RHR, Control room operator action to secure residual heat removal pumps during a hi gh-pressure event
(1) 480 V Motor Control Center NG001B
  • Design basis calculations
  • Corrective actions resulting from previous violations
  • Completed work orders
  • Vendor documents and recommendations
  • Circuit breaker/motor starter wiring diagrams
  • Circuit breaker/circuit protector overload settings
  • Circuit cable sizing
  • Component maintenance history
  • Prorrtive mcpectioti

Modificii - Permt ModsIPti) (6 Sple s)

( Change Pkage 20184,eplent of ITT Bton ndic

  • Critical design attributes
  • Environmental qualification of indicator
(2) Change Package 20297, Removal of CST Level Indicator APLI0008
  • Operator actions related to APLI0008
  • Walkdown of condensate storage tank
  • Piping and instrumentation drawings of tank and level instrumentation
(3) Change Package 20316, NIS C-2 Setpoint Revision
  • Surveillance test procedures and channel calibration acceptance criteria
  • Alarm response procedures
  • Post modification testing results
(4) Change Package 20347, RCS Narrow Range RTD Lead Resistance Imbalance
  • Change package modifications for critical design attributes
  • Implementing work order
  • Safety analysis of the narrow range RTD change
(5) Change Package 20350, SGK05A/B Fuse Replacement
  • Design package including drawings, analysis, and qualification of the fuses
  • Schematic diagrams
  • Calculations supporting fuse sizing
  • Corrective action documents and implementing work orders
  • Motor data information for protective design information
  • Vendor documentation for the replaced AJT20 amp fuse and the new AJT30 amp fuse
(6) Change Package 20452, BBTY-441A RCS Loop 4 Narrow THOT Lead Resistance Imbalance
  • Critical design attributes
  • Affected electrical cable raceway and interconnection wiring drawings
  • Surveillance test procedure
  • Ckrder

Ri of Operati*pience Issues (IPtion 02.) (4 Sple s)

( Wfrk Operati*perienc -,RCormiotice 2017 -06, Btytyhargerhort -Circtrentontritionso Fault C Distributiyst

( Wfrk Operati*perienc -,s ofltimate Heati Ienty Thriliyimum Fl Linesisf Stage Tank

( Wfrk Operati*perienc -,iscy oftion ttoul have Prtfillmentfetyction, Eironmentualif icion Rrentsortmosictmum

( Wfrk Operati*perienc -,RCormiotice 2019 -

Emyieneror*citatiyst Diode Fail

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 12, 2021, the inspector s presented the design basis assurance inspection (teams) inspection results to Mr. J. McCoy, Site Vice P resident, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.21M Calculations 41-14.02-F RWST Displacements for New Seismic Analysis 0

69466-M-001 Non-Safety Auxiliary Feedwater Pump Drawdown From the 1

Condensate Storage Tank

69466-M-002 Non-Safety Auxiliary Feedwater Pump Net Positive Suction 1

Head

69466-M-003 Non-Safety Auxiliary Feedwater Pump Analysis and System 1

Resistance Curve

69466-M-004 Non-Safety Auxiliary Feedwater Pump Piping Vibration 0

Analysis

AN 98-001 Uncertainty for Refueling Water Storage Tank (RWST) 0

Level-Low, (Lo-Lo-1) Automatic Switchover Setpoint and

Technical Specification changes

AN-98-001-000- Uncertainty for Refueling Water Storage Tank (RWST) 0

CN- 001 Level-Low, (Lo-Lo-1) Automatic Switchover Setpoint and

Technical Specification changes

AN-98-026 Determination of RWST Depletion prior to Completion of 0

Recirculation Switchover and ECCS Recirculation Flow

Requirement

BN-20 RWST Volumes and Level Set Points 3

BN-20-CN002 RWST Volume and Level Set Points 3

BN-J-001 RWST Level Transmitter Density Errors 01

BN-J-002 Total Loop Uncertainty Calculation - System BN, Loops 01

0930, 0931, 0932, and 0933

BN-J-002-001-Total Loop Uncertainty Calculation - System BN, Loops 01

CN003 0930, 0931, 0932, and 0933

BN-J-002-01-Total Loop Uncertainty Calculation System BN, Loops 0930 01

CN001 0931 0932 0933

ECCS-47 SI Pumps - NPSH from RWST 0

EJ-30-003-RHR Pumps A & B NPSH 03

CN002

FL-08 Control Building Flooding 003

FL-18 Containment Flood Levels for LOCA and MSLB 03

Inspection Type Designation Description or Title Revision or

Procedure Date

H-08 NB System Protective Relays 5

KJ-M-017 Emergency Diesel Standby Generator (KKJOlB) Runtime 1

Without ESW Flow

NK-E-001-004-125 VDC Class 1E Battery System Sizing, Voltage Drop and 005

005 Short Circuit Studies.

SA-92-009 Calculation of RWST Depletion Rate and ECCS 0

Recirculation Switchover Time Following a Postulated

Primary/Secondary Pipe Rupture

WES-009-CALC-Wolf Creek/Callaway Post-LOCA Containment Water Level 1

001 Calculation

XX-E-006 AC System Analysis 006

XX-E-006 AC System Analysis 8

XX-E-006 AC System Analysis 9

XX-E-009 System NB, NG, PG Undervoltage/Degraded Voltage Relay 1

Setpoints

Corrective Action Condition Report 2007-01786, 47791, 74322, 104253, 104389, 104390,

Documents (CR- ) 128300, 133632, 135223, 66596, 66841, 103323, 104458,

104515, 105136, 105564, 105741, 105744, 105969, 106015,

114883, 118661, 124196, 129263, 130202, 10000916,

10001446, 10002218, 10005090, 10007183, 10007246,

100007975, 00124312, 00138042, 00145626, 00131142,

10000792

Corrective Action Condition Report 10007140, 10007142, 10007145, 10007147, 10007163,

Documents (CR- ) 10007662, 10007666, 10007668, 10007802, 10008018,

Resulting from 10007616, 10008023, 10008009, 10007407, 10007596,

Inspection 10007621, 10007625, 10007632, 10007633, 10007667,

10007975, 10008021, 10008065, 10008092, 10008133

Drawings 8809D54 T HAVE Loop 4 (TEST) Protection IV Card Frame 08 5A

Cabinet 04 Interconnecting Wiring Diagram

C-0C0212 Refueling & Reactor Makeup Water Storage Tanks, 7

Concrete Neat Line & Reinforcing Plans and Sections

E-11001 Main Single Line Diagram 13

E-11NB01 Lower Medium Voltage Sys. Class 1E 4.16 kV Single Line 9

Meter and Relay Diagram

Inspection Type Designation Description or Title Revision or

Procedure Date

E-11NG01 Low Voltage System Class 1E 480V Single Line Meter & 16

Relay Diagram

E-11NG01 Low Voltage System Class 1E 480V Single Line Meter & 16

Relay Diagram

E-11NK01 Class 1E 125V DC System Meter & Relay Diagram 20

E-11NK02 CLASS IE 125V DC System, Meter & Relay Diagram 19

E-13EP02A Schematic Diagram Accumulator Isolation Valves 4

E-13GK04 Schematic Diagram Battery Rm. Hydrogen Alarm 00

E-13NB01 Lower Medium Class 1E Meter and Voltage System 4.16 kV 5

Three Line Relay Diagram

E-13NB02 Lower Medium Voltage Sys. Class 1E 4.16 KV Three Line 3

Meter & Relay Diagram

E-13NB03 Lower Medium Voltage Sys. Class 1E 4.16kv Meter and 8

Relay Three Line Diagram

E-13NB12 Schematic Diagram Class 1E Bus NB01 Feeder Brkr. 7

2NB0112

E-13NB13 Schematic Diagram Class 1E Bus NB01 Feeder Brkr. 7

2NB0109

E-13NE10 Schematic Diagram 4.16KV DG Feeder Breaker 152NB0111 22

E-13NG10 Schematic Diagram 4.16KV LC XFMR Feeder Breakers 5

2NB0110 and 152NB0113

E-17000A Termination List Notes 20

J-14001 Control Room Equipment Arrangement. 12

KD-74-96, Sh. 1 One Line Diagram 73

KD-7496 One Line Diagram 73

KD-7496A Distribution System Equipment Lineup Limitations 11

M-12BN01 Piping & Instrumentation Diagram, Borated Refueling Water 1

Storage System

M-1H3311 HEATING VENTILATING & AIR COND. CONTROL 07

BUILDING EL. 2000'-0" AREA 1

M-1P3411 Drainage System (LE & LF) Control Building, EL. 2O16'- 0 01

Area 1

M-622.1-00036-Electrical Motor Data Sheet, Bahnson Ref: N-0027 Thru N-1W

W03 003`

Inspection Type Designation Description or Title Revision or

Procedure Date

N1387-637A-B1 SGK05A & SGK05B Air Conditioner, Electrical Schematic 08

WIP-M-761-T HAVE Loop 1 (Test) Protection Card Frame 2/4 Cabinet 1 00

2328-W01-A-1 Interconnecting Wiring Diagram.

Engineering 20452 BBTY-441A RCS LP4 Narrow THOT Lead Resistance 00

Changes Imbalance

CP 014426. Utilization of Spare RTD BBTE0430A1, 02

CP 20316 NIS C-2 Setpoint Revision 0

Document EC Engineering for SGK05A/B Fuse Replacement, Rev. 0 0

Number: 020350,

EC. 020347 RCS NARROW RANGE RTD LEAD RESISTANCE 0

IMBALANCE

Engineering LTR-SCS-19-17 Wolf Creek Nuclear Operating Corporation C-2 Interlock 0

Evaluations Setpoint Revision

PQE-J-601B-P01 Atmospheric Relief Valve 8005N I/P Converter w/ Metallic 0

Nozzle Cap

WCAP-11528 RCS Flow Anomaly Investigation Report 04/01/1988

WCAP-9917 Setpoint Study for Kansas Gas and Electric Co./Kansas City 06/01/1981

Power and Light Co. Wolf Creek Unit and Union Electric Co.

Callaway Units 1 and 2 (SNUPPS Projects)

Miscellaneous Technical Requirements Manual 72

04-00383 WOLF CREEK GENERATING STATION - ISSUANCE OF 07/12/2004

AMENDMENT

RE: TECHNICAL SPECIFICATIONS 3.8.1 AND 3.8.4 - AC

AND DC SOURCES

(TAC NO. MB8763)

50.59 for DECP 50.59 screening for RCS Narrow range RTD Lead 0

Resistance Imbalance engineering design change.

AD 20347 Applicability Determination for 50-59 for DCP 020347 0

ANSI/I EEE American National Standard - General requirements for dry-11/30/1979

C57.12.01-1979 type distribution and power transformers

Bulletin 6.10-2C ITE Series 5600 Motor Control Centers - design and 02/1976

application guide

CJ16224-l Dedication Plan for MERSEN Fuse PIN: AJT30 2, 11/25/19

Inspection Type Designation Description or Title Revision or

Procedure Date

CP 20350 CP 20350 Attachment 2 for XX-E-006 REV 8 ETAP 10-31-2019

MODEL\\XX-E-006 REV 8.O

CR 00145500 Level Of Effort Evaluation for NRC 3Q2020 Integrated N/A

Inspection Self-revealing Green NCV

E-009 Technical Specification for Metal-Clad Switchboard for the 8

Standardized Nuclear Unit Power Plant System

E-009-00342 Metal-Clad Switchgear - Types M26 and M36 for Magne-W09

(GEH-1802X) Blast Air Circuit Breakers

E-009B Design Specification for 4.16 KV and 13.8 KV Vertical Lift 1

Vacuum Circuit Breakers

E-009B-00009 Instruction Manual for Siemens Type 3AF-GER/GEU Vertical W06

Lift Direct Replacement Vacuum Circuit Breakers

E-00NG System Description Low Voltage System - 480 V (Class 1E 5

Power System)

E-018 Technical Specification for Motor Control Centers For The 13

Wolf Creek Generation Station

E-018A-00007 Instruction Manual For Molded Case Circuit Breaker W15

E-10NB System Description Lower Medium Voltage System - 4.16 00

kV (Class IE Power System)

E-11NG20 Low Voltage System Class 1E Motor Control Center 312

Summary

Frame Book 29-Westinghouse Series C Motor Circuit Protector 05/1986

111

GEK-7310C Maintenance Manual - GE Power Circuit Breakers Types

AKR-3/3A-50 and AKRU-3/3A-50

LTAM WCNOC-480 Volt Safety Related MCC Bucket Replacement 1/20/2021

09-0152

LTR-SCS-16-59 Westinghouse Evaluation to Support 95% Probability/95% 0

Confidence Level Uncertainty Values for Non-Westinghouse

Supplied Instrumentation for the Wolf Creek Generating

Station Revised Thermal Design Procedure Uncertainty

Calculations in WCAP-18083-P.

M-10BN Borated Refueling Water Storage 1

Inspection Type Designation Description or Title Revision or

Procedure Date

MGE EOOP-11 Molded Case Circuit Breaker and Ground Fault Sensor 37A

Testing

N/A Maintenance Strategy - XNG01 8/5/201

NB SHR 2020 System Health Report - System NB (Low-Medium Voltage

Q3Q4 4.16 kV) Third and Fourth Quarter

PIR 2007-00368 Supplement to Condition Report 2008-002718 - DG Parallel 06/19/2008

CR Response with Scenario Table

PSA-05-0011 Probabilistic Risk Assessment System Notebook - Electrical 3

Power Systems

TS-19-0001 Fuse list Change for Fuses 109FU, 110FU, 111FU N/A

Procedures AI 12-002 FME Consideration and General Guidance for Major 0A

Components

AI 21-016 OPERATOR TIME CRITICAL ACTIONS VALIDATION 20

AI 29B-003 Guidance To Prevent Unacceptable Preconditioning Prior To 2

Testing

ALR 00-47D RWST Lev LoLo 1 Auto XFR 10B

ALR 00-82A PR Over PWR Rod Stop 11

ALR 301 125 VDC CLASS IE SWITCHBOARD NK01 10

AP 12-003 Foreign Material Exclusion 18

AP 14A-003 Scaffolding Construction 26

CNT-ME-507 Installation & Inspection of Cable Terminations 13

E-009Q-01 13.8 KV and 4.16 KV Switchgear Inspection and Testing 37A

E-017 Technical Specification for Load Center Unit Substations for 07

the Standardized Nuclear Unit Power Plant System

E-020 DC Distribution Switchboards 009

E-050A-00010 Installation Instructions for AT&T Lineage 2000 Round Cell W01

Batteries Racks and Seismic Bracing at Wolf Creek Nuclear

Power Plant

E-050A-00010 Installation Instructions for AT&T Lineage 2000 Round Cell W01

Batteries Racks and Seismic Bracing at Wolf Creek Nuclear

Power Plant

E-051B Electrically Operated Manually Controlled Transfer Switches 01

E-051B-0031 Instruction Manual for Transfer Switch Panels W04

Inspection Type Designation Description or Title Revision or

Procedure Date

E-075-00016 Instruction Manual for Installation, Operations, & W06

Maintenance of ESWS Transformers 225 KVA FOR

SNUPPS 10466

E-10NK System Description for 125-Volt DC System (Class 1E 007

Power System)

E-11013 Installation, Inspe49ction, and Testing Details for Electrical 49

Equipment and Cables.

EMG C-0 Loss of All AC Power 45

EMG ES-12 Transfer to Cold Leg Recirculation 24

EMG ES-12 Transfer to Cold Leg Recirculation 24

EMG FR-H1 Response to Loss of Secondary Heat Sink 37

I-ENG-005 Infrared Thermography 11

MGE EOOP-05 Insulation Resistance Testing 27

MGE EOOP-11 Molded Case Circuit Breaker and Ground Fault Sensor 37A

Testing

MGE TL-001 Wiring Termination and Lug/Connector Installation 26A

MPE E009Q-03 Inspection and Testing Of Siemens Vacuum Circuit Breakers 11

MPE E017Q-04 Circuit Breaker Test for AKR 50 and AKR 30 Breakers 31B

MPE E017Q-07 Load Center Transformer Inspection 17A

OE 2018-0465 NRC Information Notice 2017-06 06/14/2018

OFN NB-042 Loss Of Offsite Power To NB01 (NB02) With EDG Paralleled 15

STC-IC-441 Channel Calibration Nuclear Instrumentation System Power 16A

Range Channel N41

STN KU-010 Station Blackout Diesel and Non-Safety AFW Pump Test 13

STS CH-029 Refueling Water Storage Tank Boron Concentration 8A

Determination

STS EN-100A Containment Spray Pump A Inservice Test 31

STS IC-201A TAVG, Delta T and Pressurizer Pressure Channel 24

Operational Test-Protection Set 1

STS IC-442 Channel Calibration Nuclear Instrumentation System Power 16A

Range Channel N42

STS IC-443 Channel Calibration Nuclear Instrumentation System Power 16A

Range Channel N43

Inspection Type Designation Description or Title Revision or

Procedure Date

STS IC-444 Channel Calibration Nuclear Instrumentation System Power 17A

Range Channel N44

STS IC-500G Delta T/TAVG Instrumentation Loop 4 Channel Calibration 28B

STS IC-508A Refueling Water Storage Tank Level Transmitter Calibration 8

STS IC-508B Refueling Water Storage Tank Level Instrumentation 9

Channel Calibration

STS IC-803A 4KV Undervoltage - Grid Degraded Voltage Channel 8

Calibration of NB01 Bus

STS KJ-011A EDG NE01 24 Hour Run 38

STS MT-018 Weekly Inspection of 125 VDC Lead-Calcium Batteries 23B

STS MT-020 125 VDC Battery Charger Operational Test 26B

STS MT-020 125 VDC Battery Charger Operational Test 26B

STS MT-024A Functional Test of 480 and 120 Volt Molded Case Circuit 16A

Breakers

STS MT-024B Functional Test of 480 and 120 Volt Molded Case Circuit 17

Breakers

STS MT-024C Functional Test of 480 and 120 Volt Molded Case Circuit 16

Breakers

SYS AP-122 Non-Safety Auxiliary Feed Pump Operation 13

Work Orders Work Order (WO-12-359863-000, 14-389904-000, 18-442405-001, 18-

) 442406- 001, 18-442408-001, 18-442426- 001, 19-448418-

000, 19-448418- 002, 19-448418- 004, 20- 465688-000, 20-

458894- 000, 20- 458895-000, 20-458896- 000, 20-458898-

000, 20-458900- 000, 20-458901- 000, 20- 458905-002, 20-

461085- 000, 20- 461085-001, 20-462400- 000, 20-462400-

001, 20-465688- 000, 20-466586- 000, 20- 461440-000, 20-

466529- 000, 20- 466528-000, 19-455924- 000, 14-383742-

000, 20-458317- 001, 01-224289- 000, 10- 327766-000, 12-

359819- 000, 17-421614-000, 08-303906- 000,. 04-259537-

000, 13-372243- 000, 15-405081- 000, 18-444596 -000, 17-

21067- 003, 18-437036 000, 20-467595- 000, 20-458103-

001

16