| Quarter | Site | Title |
---|
05000269/FIN-2018013-02 | 2018Q1 | Oconee | Failure to Submit for License Review andObtain a License Amendment for a Modification |
05000269/FIN-2018013-01 | 2018Q1 | Oconee | Failure to Translate Design and Licensing Basis Requirements and Verify Adequate Design |
05000395/FIN-2017007-03 | 2017Q4 | Summer | Failure to Identify a CAQ for Power Shield Catalog #609903-T501N |
05000395/FIN-2017007-02 | 2017Q4 | Summer | Failure to Establish a Testing Program for Inverter XIT5904 and Time Delay Relay in the EFW/SW Crosstie Valve Actuation Circuitry |
05000395/FIN-2017007-01 | 2017Q4 | Summer | Failure to Verify the Adequacy of Design for the EFW system when Supplied by SW |
05000280/FIN-2017007-01 | 2017Q3 | Surry | Failure to Evaluate Design Maximum Ambient Temperature Effect on Main Steam Valve House |
05000272/FIN-2017007-03 | 2017Q3 | Salem | Inadequate Corrective Action Regarding Missed Periodic Inspection of 2C EDG AVR Card |
05000272/FIN-2017007-02 | 2017Q3 | Salem | Inadequate PM for the EDG Room Ventilation System |
05000272/FIN-2017007-01 | 2017Q3 | Salem | Inadequate Design Verification that Inter-Cabinet Bolts were Installed between SEC and Bailey Cabinets |
05000266/FIN-2017002-02 | 2017Q3 | Point Beach | Failure to Identify Non-Conforming Conditionsafter Receipt of Anchor Darling Double Disc Gate Valve Related Part 21 Report |