ML20195E639: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:SAFEGUARDS INFORMATION
                      s.
                .
      e.-
    .
        Docket Nos. 50-327, 50-328
        License Nos. DPR-77, DPR-79
        Tennessee Valley Authority
        ATTN: Mr. S. A. White
                  Manager of Nuclear Power
        6N 38A Lookout Place
          1101 Market Street
        Chattanooga, TN 37402-2801
        Gentlemen:
.
          SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-30 AND 50-328/86-30
          This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
        G. F. Gibson on May 12-16, 1986. The inspection included a review of activities
          authorized for your Sequoyah facility. At the conclusion of the inspection, the
          findings were discussed with those members of your staff identified in the
          enclosed inspection report.
I
          Areas examined during the inspection are identified in the report. Within these
  >
          areas, the inspection consisted of selective examinations of procedures and
          representative records, interviews with personnel, and observation of activities
          in progress.
          Within the scope of the inspection, no violations or deviations were identified.
          In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
          security measures are exempt from public disclosure; therefore, the enclosure to
          this letter, with the exception of the report cover page which presents a
          nonexempt summary, will not be placed in the NRC Public Document Room.
          Should you have any questions concerning this letter, please contact us.
,
                                                    Sincerely,
;
                                                    Stephen P. Weise, Chief
                                                    Reactor Projects Branch 1
                                                    Division of Reactor Projects
          Enclosure:
          Inspection Report
            (SafeguardsInformation)
          cc w/ encl:    (See page 2)
                                                                          gFECUAR y I NS
              ebobo901BO Bbobo3                                        PAGt z ^RATZoy7,l0k
              {DR ADOCKODoog7
,
                                                                                gCONTR0f g ,
                                SAFEGUARDS INFORMATION                                  g;
.
                              *
                                                                                          ' i
 
i
                              SAFEGUARDS INFORMATION
                    .
                                                                          JUNO 3 ggg
    ,.Ienness'ee Valley Authority              2
  .
      cc w/ enc 1:
      H. L. Abercrombie, Sequoyah Nuclear Plant
        Site Director
      P. R. Wallace, Plant Manager                  -
      K. W. Whitt, Director, Nuclear
        Managers Review Group
      D. L. Williams, Jr. , Supervisor
        Licensing Section
      G. B. Kirk, Compliance Staff Supervisor
      J. E. Wills, Project Engineer
      bec w/ enc 1:
      IE File
      NMSS/SGPL
      NRR/DL/SSPB
      bec w/ Inspection Summary:
      J. N. Grace
      H. R. Denton, NRR
      H. L. Thompson, NRR
      J. M. Taylor, IE
      B. B. Hayes, 01
      S. R. Connelly, OIA
      G. G. Zech
      S. P. Weise
      Document Control Desk, 016
      State of Tennessee
                                                                .
      RII    Y            RI              ,
                                                      RII,h      RII
                              W                            L
      GFG bson:1b                ire        r            tbhr    SWeise
      05/p86                05/30/86    0        86  JP)&/86
                                                      09/        09 3/86
                                                                  ENCLOSURE CCIITAINS
                                                                  SAFEGUARDS INFORMATION
                                                                  UPON SEPARATION THIS
                          SAFEGUARDS INFORMATION                r4arISnE**rR0uro.
}}
}}

Latest revision as of 15:28, 16 December 2020

Forwards Insp Repts 50-327/86-30 & 50-328/86-30 on 860512-16.No Violations or Deviations Noted
ML20195E639
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/03/1986
From: Weise S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20195E644 List:
References
NUDOCS 8606090180
Download: ML20195E639 (2)


See also: IR 05000327/1986030

Text

SAFEGUARDS INFORMATION

s.

.

e.-

.

Docket Nos. 50-327, 50-328

License Nos. DPR-77, DPR-79

Tennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

.

SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-30 AND 50-328/86-30

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. F. Gibson on May 12-16, 1986. The inspection included a review of activities

authorized for your Sequoyah facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

I

Areas examined during the inspection are identified in the report. Within these

>

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

,

Sincerely,

Stephen P. Weise, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report

(SafeguardsInformation)

cc w/ encl: (See page 2)

gFECUAR y I NS

ebobo901BO Bbobo3 PAGt z ^RATZoy7,l0k

{DR ADOCKODoog7

,

gCONTR0f g ,

SAFEGUARDS INFORMATION g;

.

' i

i

SAFEGUARDS INFORMATION

.

JUNO 3 ggg

,.Ienness'ee Valley Authority 2

.

cc w/ enc 1:

H. L. Abercrombie, Sequoyah Nuclear Plant

Site Director

P. R. Wallace, Plant Manager -

K. W. Whitt, Director, Nuclear

Managers Review Group

D. L. Williams, Jr. , Supervisor

Licensing Section

G. B. Kirk, Compliance Staff Supervisor

J. E. Wills, Project Engineer

bec w/ enc 1:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

J. N. Grace

H. R. Denton, NRR

H. L. Thompson, NRR

J. M. Taylor, IE

B. B. Hayes, 01

S. R. Connelly, OIA

G. G. Zech

S. P. Weise

Document Control Desk, 016

State of Tennessee

.

RII Y RI ,

RII,h RII

W L

GFG bson:1b ire r tbhr SWeise

05/p86 05/30/86 0 86 JP)&/86

09/ 09 3/86

ENCLOSURE CCIITAINS

SAFEGUARDS INFORMATION

UPON SEPARATION THIS

SAFEGUARDS INFORMATION r4arISnE**rR0uro.