ML20073R688: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project =  
| project = TAC:46677, TAC:51791, TAC:51792
| stage = Request
| stage = Request
}}
}}

Latest revision as of 14:42, 27 September 2022

Forwards Application for Amend to License NPF-3 Revising Tech Spec Section 4.8.1.2,Tables 4.3-11 & 3.6-2 Re Surveillance Requirements for Automatic Load Sequencer & Monthly Testing of Auxiliary Feedwater Sys Logic
ML20073R688
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/02/1983
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20073R689 List:
References
938, TAC-46677, TAC-51791, TAC-51792, NUDOCS 8305040491
Download: ML20073R688 (1)


Text

, . -'

TOLEDO Docket No. 50-346 EDISON License No. NPF-3 RICHAHO P. CrCUSE Serial No. 938 %E P 14191259-5221 May 2, 1983

, Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Stolz:

Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the changes attached. The proposed changes involve:

t

1. Section 4.8.1.2
2. Table 4.3-11
3. Table 3.6-2 The three attachments identify the proposed changes and their safety evaluation. Item 1 concerns Surveillance Requirements for the automatic load sequencer. Item 2 concerns monthly testing of the Auxiliary Feed-water System automatic actuation logic and manual initiation circuit.

Item 3 concerns cycling requirements for the Main Steam Isolation Valves in Mode 4.

This amendment request involves one change to a previously submitted -D O!

(July 10, 1980 Serial No. 731) amendment request still under review and I l two Class III types. Enclosed is a check for $8,000 as requested by /

10 CFR 170.22. [C 4 c, ff .,

Wt Very truly yours, gooO.OO W