| | number = ML19270G587 | | | number = ML19270G587 |
| | issue date = 10/01/2019 | | | issue date = 10/01/2019 |
| | title = 09/26/2019 Summary of Public Meeting with Southern Nuclear Operating Company to Conduct Technical Discussions on License Amendment Request (LAR) 19-001 and LAR 19-017 | | | title = Summary of Public Meeting with Southern Nuclear Operating Company to Conduct Technical Discussions on License Amendment Request (LAR) 19-001 and LAR 19-017 |
| | author name = Rankin J | | | author name = Rankin J |
| | author affiliation = NRC/NRO/DLSE/LB2 | | | author affiliation = NRC/NRO/DLSE/LB2 |
Line 53: |
Line 53: |
|
| |
|
| ML19270G587 *via e-mail NRC-008 OFFICE PM: DLSE/LB2 LA: DLSE/LB2 PM: DLSE/LB2 BC: DLSE/LB2 NAME JRankin* (c) RButler* CPatel* JDixon-Herrity DATE 9/27/19 9/30/19 9/30/19 10/01/19 OFFICE PM: DLSE/LB2 NAME JRankin (s) | | ML19270G587 *via e-mail NRC-008 OFFICE PM: DLSE/LB2 LA: DLSE/LB2 PM: DLSE/LB2 BC: DLSE/LB2 NAME JRankin* (c) RButler* CPatel* JDixon-Herrity DATE 9/27/19 9/30/19 9/30/19 10/01/19 OFFICE PM: DLSE/LB2 NAME JRankin (s) |
| DATE 10/01/19 | | DATE 10/01/19 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC) |
| | |
| AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC) | |
| Thursday, September 26, 2019 Teleconference 9:00 a.m. - 12:00 p.m. | | Thursday, September 26, 2019 Teleconference 9:00 a.m. - 12:00 p.m. |
| PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4. | | PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4. |
|
---|
Category:Meeting Summary
MONTHYEARML24305A1662024-11-0606 November 2024 Vogle Electric Generating Plant, Unit 3 - Summary of Conference Call Regarding the Fall 2024 Steam Generator Tube Inspections ML24290A1582024-10-24024 October 2024 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed License Amendment Request to Change Table 3.3.8-1 for Vogtle Electric Generating Plant, Units 3 & 4 ML24292A0022024-10-22022 October 2024 Summary of October 16, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Increase Flexibility in Mode Restraints ML24213A2462024-08-0505 August 2024 Summary of Closed Meeting SNC Fleet - Physical Barriers Exemption ML24187A0012024-07-17017 July 2024 Summary of Observation Pre-Application Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request to Revise TS 3.3.8, Engineered Safety Feature Actuation System for Vogtle Electric ML24179A1592024-07-0202 July 2024 June 27, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML24156A1772024-06-11011 June 2024 Summary of June 6, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Physical Barrier Exemptions for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch Nuclear Plant, Units 1 and 2, and Vogtle ML24149A0742024-06-0101 June 2024 Summary of May 29, 2024, Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding the Steam Generator Tube Inspection Report for Vogtle Electric Generating Plant, Unit 1 ML24122C6202024-05-0101 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 Docket Nos.. 50-424, 50-424, 52-025, and 52-026 Meeting Number 20240471 ML24108A0832024-04-19019 April 2024 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML24093A0612024-04-18018 April 2024 April 1, 2024, Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Proposed Alternative Requests to the Extend Examination Intervals for Joseph M. Farley Nuclear Plant and Vogtle ML24068A0962024-03-18018 March 2024 Summary of 3-7-24, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Co., Inc., Regarding a Proposed License Amendment Request for TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspection ML24025A1372024-01-31031 January 2024 Summary of Observation Pre-Submittal Meeting Held with Snc., Regarding a Proposed Alternative Request - Explosively Actuated Valves for Vogtle Electric Generating Plant, Units 3 and 4 ML24019A1932024-01-30030 January 2024 Summary of January 8, 2024, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company Regarding a Proposed LAR for Vogtle Electric Generating Plant, Units 1, 2, 3, & 4; Hatch, Units 1 & 2; Farley, Units 1 & 2 ML23356A0282023-12-27027 December 2023 December 11, 2023, Pre-Application Meeting with SNC Regarding a Proposed Fleet LAR to Revise TS 5.3.1 to Relocate Training Qualification Requirements from TS to Their Qatr/Ndqam ML23311A1302023-11-17017 November 2023 Summary of Nov. 6, 2023, - Closed Meeting Held with Southern Nuclear Operating Company, Inc., Regarding Physical Barriers Exemptions for Hatch Units 1 & 2, Farley Units 1 & 2 and Vogtle Units 1, 2, 3 & 4 (EPID L-2023-LLE-0018 & L-2023-LLE-0 ML23313A0952023-11-16016 November 2023 Summary of November 7, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML23275A0882023-10-12012 October 2023 Summary of Meeting with Southern Nuclear Operating Company ML23272A1822023-10-11011 October 2023 Summary of September 28, 2023, Observation Pre Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 3 and 4 ML23230A0212023-08-30030 August 2023 LAR-22-002 Technical Specification 3.8.3 Summary of 08-17-23 Public Meeting ML23187A5742023-08-22022 August 2023 Summary of June 29, 2023, Meeting with Southern Nuclear Operating Company ML23146A1542023-06-0505 June 2023 Summary of May 25, 2023, Meeting with Southern Nuclear Operating Company ML23132A0412023-05-18018 May 2023 Summary of May 11, 2023, Meeting with Southern Nuclear Operating Company ML23121A1692023-05-12012 May 2023 Summary of Meeting with Southern Nuclear Operating Company Vogtle LAR-23-006 U/3&4 More Restrictive Action for TS 3.1.9 Cvs Isolation Valves ML23115A3282023-05-10010 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have a Pre-Submittal Discussion of Draft License Amendment Request (LAR) for Vogtle Electric Generating Plant (VEGP) Unit 3 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML23090A1422023-04-0303 April 2023 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML23065A0732023-03-17017 March 2023 March 2, 2023, Summary of Meeting with Southern Nuclear Operating Company - Vogtle Electric Generating Plant, Unit 4 ML23055A0902023-03-14014 March 2023 February 16, 2023, Summary of Meeting with Southern Nuclear Operating Company ML23048A0682023-03-0101 March 2023 Summary of February 13, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc. Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML23037A0032023-02-0606 February 2023 Summary of February 2, 2023, Public Meeting with Southern Nuclear Operating Company ML23012A0512023-01-17017 January 2023 January 11, 2023, Summary of Public Meeting with Southern Nuclear Operating Company (SNC) Regarding Vogtle Emergency Technical Specification Amendment ML22349A2142023-01-0303 January 2023 Summary of December 8, 2022, Public Meeting with Southern Nuclear Operating Company ML22336A0812022-12-0505 December 2022 Summary of December 1, 2022, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22335A4922022-12-0202 December 2022 Summary of Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22319A0132022-11-30030 November 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on November 10, 2022 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22271A0182022-10-0404 October 2022 Summary of Public Meeting with SNC on Lessons Learned Final ML22257A2362022-09-19019 September 2022 Summary of September 13, 2022, Partially Open and Partially Closed Pre-Submittal Meeting Held with SNC, Regarding a Proposed OLM License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 ML22243A0302022-09-0909 September 2022 Summary of a Public Meeting with Southern Nuclear Operating Company on August 25, 2022 ML22145A6052022-06-0202 June 2022 Summary of May 24, 2022, Public Meeting with SNC, Regarding a Proposed Alternative Request for Performance-Based Leakage Test Frequencies for the Refueling Water Tank Suction Check Valves for Vogtle, Units 1 & 2 ML22145A4492022-05-27027 May 2022 Summary of May 23, 2022, Public Meeting with SNC, Regarding a Proposed License Amendment Request to Change Technical Specification 3.8.1 and Implement TSTF-163 for Vogtle Electric Generating Plant, Units 1 and 2 ML22131A3422022-05-18018 May 2022 Summary of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Requests to Implement Alternate Source Term, TSTF-51, TSTF-471, and TSTF-490 for Vogtle, Units 1 & 2 (EPID No. L-2022-LRM-0033 ML22132A0102022-05-17017 May 2022 Meeting of Public Meeting with Southern Nuclear Operating Company, Inc., Regarding Proposed Accident Tolerant Fuel License Amendment Request and Exceptions for Vogtle Electric Generating Plant, Units 1 and 2 ML22123A0652022-05-0202 May 2022 Public Meeting Summary Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 50-424, 50-425, 52-025, 52-026, Meeting Number 20220330 ML22098A1292022-04-26026 April 2022 Summary of March 31, 2022 Public Meeting with Southern Nuclear Operating Company ML22095A2292022-04-11011 April 2022 Summary of Conference Call Regarding the Spring 2022 Steam Generator Tube Inspections ML22077A5432022-04-0404 April 2022 Summary of Meeting with Southern Nuclear Operating Co 2024-08-05
[Table view] Category:Memoranda
MONTHYEARML24122C6202024-05-0101 May 2024 Public Meeting Summary - 2023 Annual Assessment Meeting Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 Docket Nos.. 50-424, 50-424, 52-025, and 52-026 Meeting Number 20240471 ML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ML23303A2032023-11-0101 November 2023 October 24, 2023, Summary of Comment Gathering Public Meeting on Lessons Learned from the ITAAC Hearing Process for Vogtle Units 3 and 4 ML22348A0862023-07-25025 July 2023 Finding in Accordance with 10 CFR 52.103(G) That All Acceptance Criteria Are Met for Vogtle Electric Generating Plant, Unit 4 ML23115A0382023-05-0909 May 2023 Summary of Readiness Group Public Meeting on April 20, 2023 ML23115A0662023-05-0101 May 2023 Summary of Public Meeting with Southern Nuclear Operating Company to Have Presubmittal Meeting for Vogtle Electric Generating Plant, Unit 4 IR 05000424/20040252023-04-28028 April 2023 Public Meeting Summary - Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 5000424, 5000425, 5200025, 5200026, Meeting Number 20230375 ML22214B4882023-02-0808 February 2023 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 4 ML22355A0322023-01-0303 January 2023 Revised Charter for the Vogtle Readiness Group to Oversee the Transition to Operations for Vogtle Units 3 and 4 ML22334A0812022-12-0101 December 2022 Update to Targeted Inspections, Tests, Analysis, and Acceptance Criteria for Vogtle Electric Generating Plant Unit 4 ML22322A1672022-11-28028 November 2022 Summary of 11/15/2022 Public Meeting on Lessons Learned ML22237A0782022-08-0505 August 2022 American Nuclear Insurers, Notification of Change in the Number of Power Reactors in the Secondary Financial Protection (SFP) Program ML20290A2812022-08-0101 August 2022 103g - Final Memorandum ML22123A0652022-05-0202 May 2022 Public Meeting Summary Vogtle Electric Generating Plant, Units 1, 2, 3, & 4 Docket No. 50-424, 50-425, 52-025, 52-026, Meeting Number 20220330 ML21337A0032021-12-0707 December 2021 Summary of Vogtle Readiness Group Public Meeting on December 2, 2021 ML21322A1502021-12-0202 December 2021 Summary of November 10, 2021 Public Meeting with Southern Nuclear Operating Company ML21316A0692021-11-22022 November 2021 November 4, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21280A2962021-10-22022 October 2021 Replacement of Page 2 to Letter Dated June 30, 2020, Titled License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions (EPID L-2020-LLA0150) ML21230A0102021-08-24024 August 2021 Summary of Public Meeting with Southern Nuclear Operating Company on August 12, 2021 ML21154A2772021-07-20020 July 2021 Summary of a Public Meeting with Southern Nuclear Operating Company on May 27, 2021 ML21194A0402021-07-20020 July 2021 Summary of June 24, 2021 Public Meeting with SNC ML21190A0622021-07-16016 July 2021 Summary of July 8 2021 Public Meeting to Discuss Late-Filed Allegation Process for Vogtle Electric Generating Plant Units 3 and 4 ML21194A0392021-07-16016 July 2021 July 8, 2021 Summary of Public Meeting with Southern Nuclear Operating Company ML21124A2032021-05-0606 May 2021 ASME Alternative ALT-16 Pre-submittal Meeting Summary 4-29-21 ML21123A1432021-05-0505 May 2021 April 22, 2021, Summary of a Public Meeting with Southern Nuclear Operating Company ML20318A2422020-12-18018 December 2020 .72 50.73 Applicability Memo ML20351A2822020-12-10010 December 2020 Summary of Public Meeting with Southern Nuclear Operating Co ML20318A2412020-11-18018 November 2020 Summary of Public Meeting with Southern Nuclear Operating Company, to Discuss Topic Regarding Vogtle Electric Generating Plant, Unit 4: ITAAC Post Closure Notification for ITAAC Index Number 344 ML20303A0422020-11-0505 November 2020 Summary of October 22, 2020 Public Meeting with Southern Nuclear Operating Company NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20296A2432020-10-15015 October 2020 Summary of 10-15-20 Public Meeting with Southern Nuclear Operating Company ML20283A4652020-10-15015 October 2020 Summary of Public Meeting on October 8, 2020 with Southern Nuclear Operating Company ML20279A5202020-10-0707 October 2020 October 1, 2020, Summary of Public Meeting with Southern Nuclear Operating Company ML20183A0902020-09-24024 September 2020 Initial Commission Memo Regarding Status of ITAAC Closure, Inspection, and Licensing Activities for Vogtle Electric Generating Plant, Unit 3 ML20262G9882020-09-22022 September 2020 September 17, 2020 Summary of Public Meeting with Southern Nuclear Operating Company ML20248H3292020-09-10010 September 2020 Meeting Summary for September 3, 2020 Public Meeting with Southern Nuclear Operating Company ML20247J4812020-09-10010 September 2020 Summary for August 27, 2020 Public Meeting with Southern Nuclear Operating Company ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ML20216A6252020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 30, 2020 ML20216A6362020-08-10010 August 2020 Summary of a Public Meeting with Southern Nuclear Operating Company on July 23, 2020 ML20205L4312020-07-29029 July 2020 Summary of a Public Meeting with Southern Nuclear Operating Company to Discuss Inspections, Tests, Analyses and Acceptance Criteria Nos. 375 and 216 ML20178A1302020-07-15015 July 2020 Memorandum Transmitting Safety Evaluation Regarding Welded Reinforcement Bar Splices at Vogtle Electric Generating Plant Units 3 and 4 ML20190A0182020-07-0808 July 2020 Summary of Meeting Regarding the Vogtle Readiness Group ML20168A3352020-06-26026 June 2020 Summary of June 11, 2020 Public Meeting with Southern Nuclear Operating Company ML20150A0092020-06-0202 June 2020 Summary of May 28, 2020 Public Meeting with Southern Nuclear Operating Company ML20154K7272020-06-0202 June 2020 EOC Meeting Summary ML20141L6182020-06-0101 June 2020 Summary of May 14, 2020 Public Meeting with Southern Nuclear Operating Company ML20141L6982020-05-26026 May 2020 Audit Report for Vogtle Electric Generating Plant Unit 3 LAR 20-001: Auxiliary Building Wall 11 Seismic Gap Requirements ML20133K1062020-05-15015 May 2020 Audit Plan for Vogtle Electric Generating Plant Units 3 and 4, Request for License Amendment: Core Makeup Tank Boron Concentration Requirements (LAR 20-004) 2024-05-01
[Table view] |
Text
October 1, 2019 MEMORANDUM TO: Jennifer Dixon-Herrity, Chief Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors FROM: Jennivine Rankin, Project Manager /RA/
Licensing Branch 2 Division of Licensing, Siting, and Environmental Analysis Office of New Reactors
SUBJECT:
SUMMARY
OF A PUBLIC MEETING WITH SOUTHERN NUCLEAR OPERATING COMPANY ON SEPTEMBER 26, 2019 The U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with Southern Nuclear Operating Company (SNC) on September 26, 2019. The purpose of the meeting was to conduct technical discussions on License Amendment Request (LAR)19-001, Request for License Amendment Regarding Protection and Safety Monitoring System Surveillance Requirement Reduction Technical Specification Revision and LAR 19-017, Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test.
The meeting notice can be found in the Agencywide Documents Access and Management System (ADAMS) Accession No. ML19207A050. The meeting notice was posted on the NRC public website. Enclosures 1 and 2 are the meeting agenda and attendance list for the meeting, respectively. The documents referenced during the discussion can be found at the ADAMS Accession Nos. given below:
J. Dixon-Herrity Summary of Meeting:
Technical Discussion on Draft LAR Supplement for LAR 19-001 On September 26, 2019, staff from the NRC conducted a public meeting with representatives from SNC to discuss a draft LAR supplement for LAR 19-001 regarding protection and safety monitoring system (PMS) surveillance requirement reductions. SNC staff explained the changes that were made as a result of the regulatory audit. In addition, SNC described rescinding the deletion of the channel check surveillance for several PMS functions because they are not fully covered by self-diagnostics. NRC requested clarification of certain changes and provided the following observations:
- 1. Consider using consistent terminology when referring to self-diagnostic features and functions.
- 2. Consider clarifying the TS Bases of 3.3.17 to clarify what is normally energized.
- 3. Consider clarifying which functional requirements are being referred to in TS Bases 3.3.1.8.
In addition, during the discussion, SNC agreed to include the following in the LAR supplement.
- 1. Provide a summary of the four Component Interface Module CIM self-diagnostics.
- 2. Correct the proposed language in the Updated Final Safety Analysis Report (UFSAR)
Section 7.1.2.11 to specify applicability to the faults which are detected by diagnostics.
- 3. Provide additional information on any review of system logs.
SNC noted they intend to submit the formal supplement by October 4, 2019.
In the closed portion of the pre-submittal discussion, SNC discussed the proprietary technical details of the PMS system in relation to the LAR.
Technical Discussion on Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation (LAR 19-017)
On September 26, 2019, staff from the NRC conducted a public meeting with representatives from SNC to discuss the progress of the staffs acceptance review of LAR 19-017. The LAR requests a change to remove the natural circulation test of the passive residual heat removal (PRHR) heat exchanger, which is conducted during preoperational testing, from the scope of the initial test program. The NRC staff explained that during the acceptance review, the NRC did not find adequate justification for the proposed removal of an initial test and related modification to an Inspection, Test and Acceptance Criteria (ITAAC) requiring the SNC to conduct a PRHR heat exchanger natural circulation test. Staff clarified that natural circulation flow rate was a key system performance parameter and verification of this parameter was important in satisfying Title 10 Code of Federal Regulations (10 CFR) Part 50, Appendix A, General Design Criterion (GDC) 37, Testing of Emergency Core Cooling System, and LAR 19-017 did not justify how this parameter was confirmed for the as built condition. The NRC staff noted that this is important for confirming safety-related natural circulation cooling of the
J. Dixon-Herrity core during a design basis accident not involving loss of coolant and all AP1000 plants are required to do it as part of the initial test program (i.e., this is not a first-of-a-kind test). Although the applicant noted (and the staff agreed) that the forced circulation test is used for continued operability justification to meet GDC 37, initial demonstration represents an important part of meeting GDC 37. The proposed removal of the test would not provide a clear means for demonstrating natural circulation flow.
SNC took an action to reexamine the LAR and determine their next course of action.
Docket Nos.: 52-025 52-026
Enclosure:
As stated cc w/encls: See next page
ML19270G587 *via e-mail NRC-008 OFFICE PM: DLSE/LB2 LA: DLSE/LB2 PM: DLSE/LB2 BC: DLSE/LB2 NAME JRankin* (c) RButler* CPatel* JDixon-Herrity DATE 9/27/19 9/30/19 9/30/19 10/01/19 OFFICE PM: DLSE/LB2 NAME JRankin (s)
DATE 10/01/19 AGENDA FOR PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION (NRC)
Thursday, September 26, 2019 Teleconference 9:00 a.m. - 12:00 p.m.
PURPOSE: To discuss issues associated with the safety review of licensing actions for Southern Nuclear Operating Companys (SNC) Vogtle Electric Generating Plant (VEGP) Units 3 and 4.
OPEN Time Topic Led By 9:00 a.m. Opening Remarks NRC 9:10 a.m. Discussion of Identified Topics NRC/SNC Opportunity for Public Comment NRC/Public Open Portion Concludes CLOSED. (If needed) NRC/SNC 12:00 p.m. Adjourn Enclosure 1
PUBLIC MEETING U.S. NUCLEAR REGULATORY COMMISSION Thursday, September 26, 2019 One White Flint North, Room O-11B4 9:00 a.m. - 12:00 p.m.
List of Attendees Name Organization Representing the Nuclear Regulatory Commission Chandu Patel Jennivine Rankin NRO/DLSE Robert Taylor Jennifer Dixon-Herrity Boyce Travis Becky Karas Kevin Coyne NRO/DSER Malcolm Patterson Hanry Wagage Jack Zhao Dinesh Taneja NRR/DE William Roggenbrodt Nancy Salgado Molly Keefe Greg Galletti NRR/DIRS Kerri Kavanagh*
Andrea Kiem Craig Harbuck NRR/DSS Vic Cusumano Representing Industry John Wiesmann*
Bob Hirmanpour Pareez Goloub Adams Quarles*
Michael Elmer*
Amy Chamberlain Stephanie Agee Mark Humphrey*
Neil Haggerty*
Yasmeen Arafeh*
Southern Nuclear Company Eddie Grant*
Dan Williamson*
Steve Merkiel*
Ron Scanlon*
Jonathon Hartmann*
Michael Yox*
Steve Leighty*
Nick Kellenberger*
Steven Unikewicz*
Pamela Fergen*
Enclosure 2
Name Organization Zach Harper*
Rick Paese Westinghouse Electric Company Warren Odess-Gilett*
Members of the Public Marv Lewis Public Georgia Public Service Doug Cheshire Commission
- = participated via teleconference
Vogtle Units 3 & 4 Mailing List (Revised 08/13/2019) cc:
Southern Nuclear Operating Company, Inc. Resident Inspector Document Control Coordinator Bin N-226-EC Vogtle Plant Units 3 & 4 3535 Colonnade Parkway 8805 River Road Birmingham, AL 35243 Waynesboro, GA 30830 Office of the Attorney General Mr. Barty Simonton 40 Capitol Square, SW Team Leader Atlanta, GA 30334 Environmental Radiation Program Air Protection Branch Resident Manager Environmental Protection Division Oglethorpe Power Corporation 4244 International Parkway, Suite 120 Alvin W. Vogtle Nuclear Plant Atlanta, GA 30354-3906 7821 River Road Waynesboro, GA 30830 Brian H. Whitley 3535 Colonnade Parkway, Bin N-226-EC Anne F. Appleby 42 Inverness Center Parkway, BIN B237 Olgethorpe Power Corporation Birmingham, AL 35243 2100 East Exchange Place Tucker, GA 30084 Mr. Michael Yox Site Regulatory Affairs Director County Commissioner Vogtle Units 3 & 4 Office of the County Commissioner 7825 River Road, Bin 63031 Burke County Commission Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)
G2NDRMDC@southernco.com (SNC Document Control)
George.Taylor@opc.com (George Taylor) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Page 2 of 3
Vogtle Units 3 & 4 Mailing List Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)
MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)
Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)
William.Birge@hq.doe.gov (William Birge) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)
Page 3 of 3