ML19254E192: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 20: Line 20:
f C:
f C:
: 3. j T,gtEo,(DN
: 3. j T,gtEo,(DN
                                                                             =a
                                                                             =a c D io          -
                                                                                  ,
c D io          -
October 25, 1979                                                  L79-1075 FILE: RR 2 (NP-32-79-ll)
October 25, 1979                                                  L79-1075 FILE: RR 2 (NP-32-79-ll)
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Latest revision as of 01:08, 2 February 2020

Forwards LER 79-096/01T-0
ML19254E192
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/25/1979
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19254E193 List:
References
L79-1075, NUDOCS 7910310299
Download: ML19254E192 (1)


Text

.

f C:

3. j T,gtEo,(DN

=a c D io -

October 25, 1979 L79-1075 FILE: RR 2 (NP-32-79-ll)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Reportable Occurrence 79-096 Davis-Besse Nuclear Power Station Unit 1 Date of Occurrence: October 15, 1979 Enclosed are three copies of Licensee Event Report 79-096 and a supplemental infor-mation sheet which is being submitted in accordance with Technical Specification 6.9 to provide 14 day wri+ .n notification of the subject occurrence.

Yours truly, I D 3% -

Terry D. Murray Station Superintendent Davis-Besse "uclear Power Station TDM/SNB/ljk Enclosure cc: Dr. Ernst Volgenau, Director Office of Inspection and Enforcement Encl: 40 copies LER 79-096 Mr. William G. Mcdonald, Director Of fice of Management Information and Program Control Encl: 3 copies LER 79-096 2 copies telecopy report

~A 351 7010310 M7 ,

ECISO*J PL AZ A 300 fAADIGON AVENUE TOLECO. OH:0 43652 THE TOLEDO EDISON CON'PANY