ML19254E193

From kanterella
Jump to navigation Jump to search
Forwards LER 79-096/01T-0
Date released: 09/25/2019 Download: ML19254E193


LER 79-096/01T-0:on 791015,capacitor Failed in Integrated Control Sys Resulting in Unit Trip from 68.8% of Full Power. Caused by Blown Muffler on Generator Output 345 Kv Breakers. Damaged Mufflers Replaced & Offsite Power re-established
ML19254E195
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/25/1979
From: Batch S
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19254E195 (4)
Forwards LER 79-096/01T-0
ML19254E192
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/25/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19254E192 (1)