{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.Turkey Point COMPLETED 8Y V.T.C'liason TELEPHONE MONTH MAR H 1 80 DAY AVERAGE | {{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | ||
Turkey Point COMPLETED 8Y V. T. C'liason TELEPHONE MONTH MAR H 1 80 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL IMWe.Net) (MWe.Net) | |||
I 668 17 670 18 56'8 19 5 2 20 656 672 21 669 668 23 6 7 '15, 10 664 26 657 665 '>7 12 662 28 662 13 661 '>9 666 14 6 2 30 666 15 31 664 16 672 NOTE: Average daily power level greater than 666 >%le due to cooler condenser cooling water. | |||
INSTRUCTIONS On this format. !ist the average daily onit pi>wer level in MWe Net for each day in the reporting mi>nth. Ci>mpute to rhe nearest whole megawatt. | |||
(o/771 | |||
-April 26 | |||
OPERATiiVG DATA REPORT DOCKET NO. | |||
DATE COMPLETED BY V.T. Chilson TELEPHONE ~~3824 OPERATING STATUS I. Unit Name: Turke Point Unit No. 3 Notes - Unit No. 3 operated | |||
'2. | |||
Forecast Achieved | at approximately 100X R.P., | ||
VNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.50 | Reporting Period: except for outage of | ||
: 3. Licensed Thermal Power (MWt): 2200 March 3-4, 1980. | |||
: 4. Nameplate Rating (Gross MWe): 760 | |||
: 5. Design Eiectrical Rating (Net MWe): | |||
: 6. Maximum Dependable Capacity (Gross MWe): 700 | |||
: 7. Maximum Dependable Capacity (iVet MWe): | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted. If Any (Net MWc): NONE | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Yr:to-Date Cumulative I I. Hours In Reporting Period 744. 0 2 184.0 64 185. 6 | |||
: 12. Number Of Hours Reactor Was Critical 742.9 1 379.6 48 649.1 | |||
: 13. Reactor Reserve Shutdown Hours 213- 3 | |||
: 14. Hours Generator On. Line 738.2 1 250.3 46 940.5 | |||
: 15. Unit Reserve Shutdown Hours 121.8 | |||
: 16. Gross Thermal Energy Generated (MWH) 1 612 394 2 645 998 94 114 632 | |||
: 17. Gross Electrical Energy Generated (MWH) 513 485 848 545 29 929 545 Ig. Net Electrical Energy Generated (MWH) 488 351 800 363 28 322 457 | |||
: 19. Unit Service Factor 99.2. 57~ o 73.1 | |||
: 20. Unit Availability Factor 99.2 57.2 73.3 66.8 | |||
: 22. Unit Capacity Factor (Using DER Net) 52.9 '63.7 | |||
: 23. Unit Forced Outage Rate 0.8 2.5 2.6 | |||
: 24. Shutdowns Scheduled Over iVext 6 Months I Type. Date. and Duration of Each): | |||
Steam Generator Tube Insnection Pro ram - Sent. 15 - Oct. 13 1980 | |||
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup: | |||
: 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION | |||
{'>/77 ) | |||
DOCKET NO. 50 250 UNIT SIIUTDO1VNS AND POlVER REDUCTIONS it No. 3 REPORT hIONTII 0 L | |||
rg g Llccltscc Cause Sc Corrective Nii. IA Event Action lo 0j | |||
~Q CA Report ~ Prevent Rccurrcnce | |||
' Unit was removed from service due to 80-03-03 1? 5.8 N/A CB HOTORX low oil level $ .n reactor coolant pump motor No. 3C.'orrective actions included adding oil. | |||
(Nuclear system) | |||
I 3 4 F: Forced Reason: hI ethod: Exhibit G Instruct ions | |||
~ | |||
S: Scheduled A.Equipment Failure (Explain) I -hIanual I'or Preparation of Data B hlaintenance or Test ~ | |||
2-hlanual Scram. Entry Sltects I'or I.iccnsee C-Refueling 3-Automat ic Sera tn. Event Report (LER) File (NUREG-D Regulatory Restriction 4.Other (Explaut) 016I ) | |||
E.Operator Training k. Liccnsc Exantination F.Administrative G Operational Error (Explain) Exhtbtt I - Sante Source I'>/77) II Other (Exl)lain) | |||
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO 50 251 Turkey Point UNIT COMPLETED QY V. T. Chilson MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe-iVet ) | |||
I 664 17 660 IS 542 669 l9 10 21 648 55 23 24 660 | |||
'>5 657 Ip 26 651 27 l2 652 28 651 l3 650- 99 l4 30 l5 31 651 l6 62 NOTE: Average daily power level greater, than 666 NWe due to cooler condenser cooling . | |||
INSTRUCTIONS water. | |||
On this format. list the average daily unit p>>wer level in MWe Net for each day in the rept>rtinlt tn>>nth. Ci>n>pute to the nearest whole megawatt. | |||
(9/77 l | |||
OPERATING DATA REPORT DOCKET NO. 50 - 251 | |||
~~~1980 OPERATING STATUS DATE COMPLETED BY TELEPHONE ~~ | |||
~~hilson3824 I. Unit Name: P int Unit No. 4 Notes - Unit No. 4 operated | |||
: 2. Reporting Period: March 1980 at approximately 100% R.P., | |||
: 3. Licensed Thermal Power (MWt): 2200 ex'cept.for outage | |||
: 4. Nameplate Rating (Gross MWe}: 760 4-5, and load reduc-of'arch S. Design Electrical Rating (Net MWe): | |||
tion of March 18-19, 1980. | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted. If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Yr.-to.Date Cumulative | |||
: 11. Hours In Reporting Period 744.0 2 184.0 57 913.0 | |||
: 12. Number Of Hours Reactor Was Critical .9 | |||
: 13. Reactor Reserve Shutdown Hours 12.3 166.5 | |||
: 14. Hours Generator On. Line 9.8 41 178.4 | |||
: 15. Unit Reserve Shutdown Hours 31. 2 4 686 85 529 730 | |||
: 17. Gross Electrical Energy Generated (MWH) 503 170 1 364 755 27 268 233 1 294 788 25 824 784 | |||
: 19. Unit Service Factor .4 91.4 71.1 | |||
: 20. Unit Availability Factor 92.0 71.2 6.5 89.0 67.4 | |||
: 22. Unit Capacity Factor (Using DER Net) 92.8 85.5 "'64.3'.0 | |||
: 23. Unit Forced Outage Rate | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each}: | |||
Scheduled maintenance and inspections - April 26 June 17, 1980 | |||
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup: | |||
: 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 } | |||
DOCKET NO. 50 251 UNIT SIIUTDOWNS AND POIVER REDUCTIONS REPORT h{ONTII MARCII 1980 C$ | |||
~ A c Ln:ellscc Cause Ec Correclive No. Dale C$ ~ A Event Action o1 0 | |||
Report ~ Prevent Recurrence | |||
~ CA 80-03-04 4.2- B N/A CB >iOTOMC Unit was removed from service due to high oil level in reactor coolant pump motor No. 4B.. Corrective-actions included draining oil to norma]: level. | |||
(Nuclear System) 10 80-03-18 N/A llc HTEXCII Load reduction to repair condenser (D) tube leak. (Non-nuclear system) 3 4 F: Forced l{eason: hiethod: Exhibit G - Instructions S. Scheduled A-Equipmenl Failure (Explain) I-Manual for Preparation ol Data B-Maintenance oi Test- 2-Manual Scram. Entry Sheets I'or Licensee C-Refueling 3-Automatic Secant. Event Report (LER) File {NUREG-D-Regulatocy Reslciction 4-Other (Explain) OI6I ) | |||
E-Opeca toe Tcaining 8c License Examinaliun F-Administrative G-Operational Error (Explain) Exhibit I - Same Source | |||
{I)/77) I I-Otlccr (Explaicc) | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | |||
St. Lucie COMPLETED BY TELEPHONE MONTH MARCH 19 8 0 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL | |||
{MWe Net) tMWe-Net) 77 17 18 780 19 20 21 22 777 23 | |||
-777 77 25 10 6 0 26 77 77 13 14 776 30 IS 578 31 16 NOTE: Average daily power level greater than 777 MNe due to cooler condenser cooling INSTRUCTIONS water. | |||
Qn this format. !ist the average daily unit power level in vIWe Nct for each day in the rePorting tnonth. Cotnputc to the nearest whole megawatt. | |||
{o/77 1 | |||
OPERATING DATA REPORT DOCKET NO. | |||
DATE COMPLETED BY | |||
~il | |||
~watson 5 1980 TELEPHONE Q~~-3824 OPERATING STATUS St. Lucie Unit No. 1 Notes Unit operated at | |||
: 1. Unit Name: approx~ately 100% R.P. | |||
: 2. Reporting Period: until March 15, 1980; when | |||
: 3. Licensed Thermal Power (MWt): the unit was removed from | |||
: 4. Nameplate Rating (Gross MWe): 8 0 service for scheduled refue'1 | |||
: 5. Design Electrical Rating (Net MWe): 802 ing, maintenance, and inspec | |||
: 6. Maximum Dependable Capacity (Gross MWe): tions. | |||
: 7. Maximum Dependable Capacity (Net MWe): 777 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: | |||
: 9. Power Level To Which Restricted. If Any (Net MWe): | |||
: 10. Reasons For Restrictions, If Any: | |||
This Month Yr:to.Date Cumulative | |||
~ | |||
: 11. Hours In Reporting Period 744.0 2 184.0 28 728.0 | |||
: 12. Number Of Hours Reactor Was Critical 356. 7 1 783.1 23 292.9 | |||
: 13. Reactor Reserve Shutdown Hours 12 .5 | |||
: 14. Hours Generator On-Line 356.7 1 780.6 22 610.6 | |||
: 15. Unit Reserve Shutdown Hours | |||
: 16. Gross Thermal Energy Generated (MWH) | |||
: 17. Gross Electrical Energy Generated (MWH) | |||
: 18. Net Electrical Energy Generated (MWH) | |||
~f10 .. | |||
892 672 269 058 4 487 283 1 368 836 54 746 849 16 696 732 | |||
: 19. Unit Service Factor 47.9 81.5 78.7 | |||
: 20. Unit Availability Factor 47.9 81.5 78.8 | |||
: 22. Unit Capacity Factor (Using DER Net) 45.1 78. 1 '72.5 | |||
: 23. Unit Forced Outage Rate 0.9 | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each): | |||
: 25. If Shut Down At End Of Report Period, Estimated Dare of Startup: | |||
: 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77) | |||
VNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 335 UNIT NAh(E DATE REPORT hlONTII 0 fV L | |||
- L L I cell sec C O | |||
Cause h. C<>rreclivc iN<). Date | |||
~K c gee: Event Action to O Report > 0 I'reve>>l Recurrence | |||
~ C/l 80-03-15 387.3 N/A RC FUELXX Unit was removed from service for scheduled refueling, maintenance, and inspections. (Nuclear and non-nuclear systetns) | |||
F: Forced Reason: Method: Exliibit G - Instructions S: Scheduled A.E<luipment Failure (Explain) I -hlanual for Plepafati<ln of Data II hlaintenance or Test 2-hlanual Scrain. Lntry Sheets I'or Licensee C-Refueling 3-Autonialic Scrain. Event Report (LER) File (NUREG. | |||
D.Regulatory Restriction 4-Other (Explain) OI 6 I ) | |||
E-Operator Twining k. Liccnsc Examination F.Administrative G Ol)cwlioiial Lfror (Explain) Exliibit I Saine Source | |||
~ | |||
(')/77) I I.Ollicr (Exlilatt<)}} |
Latest revision as of 15:10, 4 February 2020
ML17208A449 | |
Person / Time | |
---|---|
Site: | Saint Lucie, Turkey Point |
Issue date: | 04/05/1980 |
From: | Chilson V FLORIDA POWER & LIGHT CO. |
To: | |
Shared Package | |
ML17208A448 | List: |
References | |
NUDOCS 8004180374 | |
Download: ML17208A449 (9) | |
Text
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
Turkey Point COMPLETED 8Y V. T. C'liason TELEPHONE MONTH MAR H 1 80 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL IMWe.Net) (MWe.Net)
I 668 17 670 18 56'8 19 5 2 20 656 672 21 669 668 23 6 7 '15, 10 664 26 657 665 '>7 12 662 28 662 13 661 '>9 666 14 6 2 30 666 15 31 664 16 672 NOTE: Average daily power level greater than 666 >%le due to cooler condenser cooling water.
INSTRUCTIONS On this format. !ist the average daily onit pi>wer level in MWe Net for each day in the reporting mi>nth. Ci>mpute to rhe nearest whole megawatt.
(o/771
OPERATiiVG DATA REPORT DOCKET NO.
DATE COMPLETED BY V.T. Chilson TELEPHONE ~~3824 OPERATING STATUS I. Unit Name: Turke Point Unit No. 3 Notes - Unit No. 3 operated
'2.
at approximately 100X R.P.,
Reporting Period: except for outage of
- 3. Licensed Thermal Power (MWt): 2200 March 3-4, 1980.
- 4. Nameplate Rating (Gross MWe): 760
- 5. Design Eiectrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe): 700
- 7. Maximum Dependable Capacity (iVet MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWc): NONE
- 10. Reasons For Restrictions, If Any:
This Month Yr:to-Date Cumulative I I. Hours In Reporting Period 744. 0 2 184.0 64 185. 6
- 12. Number Of Hours Reactor Was Critical 742.9 1 379.6 48 649.1
- 13. Reactor Reserve Shutdown Hours 213- 3
- 14. Hours Generator On. Line 738.2 1 250.3 46 940.5
- 15. Unit Reserve Shutdown Hours 121.8
- 16. Gross Thermal Energy Generated (MWH) 1 612 394 2 645 998 94 114 632
- 17. Gross Electrical Energy Generated (MWH) 513 485 848 545 29 929 545 Ig. Net Electrical Energy Generated (MWH) 488 351 800 363 28 322 457
- 19. Unit Service Factor 99.2. 57~ o 73.1
- 20. Unit Availability Factor 99.2 57.2 73.3 66.8
- 22. Unit Capacity Factor (Using DER Net) 52.9 '63.7
- 23. Unit Forced Outage Rate 0.8 2.5 2.6
- 24. Shutdowns Scheduled Over iVext 6 Months I Type. Date. and Duration of Each):
Steam Generator Tube Insnection Pro ram - Sent. 15 - Oct. 13 1980
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
{'>/77 )
DOCKET NO. 50 250 UNIT SIIUTDO1VNS AND POlVER REDUCTIONS it No. 3 REPORT hIONTII 0 L
rg g Llccltscc Cause Sc Corrective Nii. IA Event Action lo 0j
~Q CA Report ~ Prevent Rccurrcnce
' Unit was removed from service due to 80-03-03 1? 5.8 N/A CB HOTORX low oil level $ .n reactor coolant pump motor No. 3C.'orrective actions included adding oil.
(Nuclear system)
I 3 4 F: Forced Reason: hI ethod: Exhibit G Instruct ions
~
S: Scheduled A.Equipment Failure (Explain) I -hIanual I'or Preparation of Data B hlaintenance or Test ~
2-hlanual Scram. Entry Sltects I'or I.iccnsee C-Refueling 3-Automat ic Sera tn. Event Report (LER) File (NUREG-D Regulatory Restriction 4.Other (Explaut) 016I )
E.Operator Training k. Liccnsc Exantination F.Administrative G Operational Error (Explain) Exhtbtt I - Sante Source I'>/77) II Other (Exl)lain)
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO 50 251 Turkey Point UNIT COMPLETED QY V. T. Chilson MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe-iVet )
I 664 17 660 IS 542 669 l9 10 21 648 55 23 24 660
'>5 657 Ip 26 651 27 l2 652 28 651 l3 650- 99 l4 30 l5 31 651 l6 62 NOTE: Average daily power level greater, than 666 NWe due to cooler condenser cooling .
INSTRUCTIONS water.
On this format. list the average daily unit p>>wer level in MWe Net for each day in the rept>rtinlt tn>>nth. Ci>n>pute to the nearest whole megawatt.
(9/77 l
OPERATING DATA REPORT DOCKET NO. 50 - 251
~~~1980 OPERATING STATUS DATE COMPLETED BY TELEPHONE ~~
~~hilson3824 I. Unit Name: P int Unit No. 4 Notes - Unit No. 4 operated
- 2. Reporting Period: March 1980 at approximately 100% R.P.,
- 3. Licensed Thermal Power (MWt): 2200 ex'cept.for outage
- 4. Nameplate Rating (Gross MWe}: 760 4-5, and load reduc-of'arch S. Design Electrical Rating (Net MWe):
tion of March 18-19, 1980.
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to.Date Cumulative
- 11. Hours In Reporting Period 744.0 2 184.0 57 913.0
- 12. Number Of Hours Reactor Was Critical .9
- 13. Reactor Reserve Shutdown Hours 12.3 166.5
- 14. Hours Generator On. Line 9.8 41 178.4
- 15. Unit Reserve Shutdown Hours 31. 2 4 686 85 529 730
- 17. Gross Electrical Energy Generated (MWH) 503 170 1 364 755 27 268 233 1 294 788 25 824 784
- 19. Unit Service Factor .4 91.4 71.1
- 20. Unit Availability Factor 92.0 71.2 6.5 89.0 67.4
- 22. Unit Capacity Factor (Using DER Net) 92.8 85.5 "'64.3'.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each}:
Scheduled maintenance and inspections - April 26 June 17, 1980
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 }
DOCKET NO. 50 251 UNIT SIIUTDOWNS AND POIVER REDUCTIONS REPORT h{ONTII MARCII 1980 C$
~ A c Ln:ellscc Cause Ec Correclive No. Dale C$ ~ A Event Action o1 0
Report ~ Prevent Recurrence
~ CA 80-03-04 4.2- B N/A CB >iOTOMC Unit was removed from service due to high oil level in reactor coolant pump motor No. 4B.. Corrective-actions included draining oil to norma]: level.
(Nuclear System) 10 80-03-18 N/A llc HTEXCII Load reduction to repair condenser (D) tube leak. (Non-nuclear system) 3 4 F: Forced l{eason: hiethod: Exhibit G - Instructions S. Scheduled A-Equipmenl Failure (Explain) I-Manual for Preparation ol Data B-Maintenance oi Test- 2-Manual Scram. Entry Sheets I'or Licensee C-Refueling 3-Automatic Secant. Event Report (LER) File {NUREG-D-Regulatocy Reslciction 4-Other (Explain) OI6I )
E-Opeca toe Tcaining 8c License Examinaliun F-Administrative G-Operational Error (Explain) Exhibit I - Same Source
{I)/77) I I-Otlccr (Explaicc)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
St. Lucie COMPLETED BY TELEPHONE MONTH MARCH 19 8 0 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL
{MWe Net) tMWe-Net) 77 17 18 780 19 20 21 22 777 23
-777 77 25 10 6 0 26 77 77 13 14 776 30 IS 578 31 16 NOTE: Average daily power level greater than 777 MNe due to cooler condenser cooling INSTRUCTIONS water.
Qn this format. !ist the average daily unit power level in vIWe Nct for each day in the rePorting tnonth. Cotnputc to the nearest whole megawatt.
{o/77 1
OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY
~il
~watson 5 1980 TELEPHONE Q~~-3824 OPERATING STATUS St. Lucie Unit No. 1 Notes Unit operated at
- 1. Unit Name: approx~ately 100% R.P.
- 2. Reporting Period: until March 15, 1980; when
- 3. Licensed Thermal Power (MWt): the unit was removed from
- 4. Nameplate Rating (Gross MWe): 8 0 service for scheduled refue'1
- 5. Design Electrical Rating (Net MWe): 802 ing, maintenance, and inspec
- 6. Maximum Dependable Capacity (Gross MWe): tions.
- 7. Maximum Dependable Capacity (Net MWe): 777
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr:to.Date Cumulative
~
- 11. Hours In Reporting Period 744.0 2 184.0 28 728.0
- 12. Number Of Hours Reactor Was Critical 356. 7 1 783.1 23 292.9
- 13. Reactor Reserve Shutdown Hours 12 .5
- 14. Hours Generator On-Line 356.7 1 780.6 22 610.6
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
~f10 ..
892 672 269 058 4 487 283 1 368 836 54 746 849 16 696 732
- 19. Unit Service Factor 47.9 81.5 78.7
- 20. Unit Availability Factor 47.9 81.5 78.8
- 22. Unit Capacity Factor (Using DER Net) 45.1 78. 1 '72.5
- 23. Unit Forced Outage Rate 0.9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Dare of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77)
VNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 335 UNIT NAh(E DATE REPORT hlONTII 0 fV L
- L L I cell sec C O
Cause h. C<>rreclivc iN<). Date
~K c gee: Event Action to O Report > 0 I'reve>>l Recurrence
~ C/l 80-03-15 387.3 N/A RC FUELXX Unit was removed from service for scheduled refueling, maintenance, and inspections. (Nuclear and non-nuclear systetns)
F: Forced Reason: Method: Exliibit G - Instructions S: Scheduled A.E<luipment Failure (Explain) I -hlanual for Plepafati<ln of Data II hlaintenance or Test 2-hlanual Scrain. Lntry Sheets I'or Licensee C-Refueling 3-Autonialic Scrain. Event Report (LER) File (NUREG.
D.Regulatory Restriction 4-Other (Explain) OI 6 I )
E-Operator Twining k. Liccnsc Examination F.Administrative G Ol)cwlioiial Lfror (Explain) Exliibit I Saine Source
~
(')/77) I I.Ollicr (Exlilatt<)