ML17272A934: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:hw 4k.v'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)1)I NO DOCKET lic Powe 05000397 ACCESSION NBR:8004?80475 DOC~DATE: 80/04/21 NOTARIZED:
{{#Wiki_filter:hw 4k.
FACIL:50-397 NPPSS Nuclear Projects Unit 2i l'>ashington Pub AUTH~NAME AUTHOR AFFILIATION RENBERGERiD
v'EGULATORY INFORMATION DISTRIBUTION SYSTEM                           (RIDS)           I 1)
~L, Washington Public Power Supply System RECIP~NAME RECIPIENT AFFILIATION ENGELKENiR
ACCESSION NBR:8004?80475                 DOC ~ DATE: 80/04/21   NOTARIZED: NO          DOCKET FACIL:50-397       NPPSS     Nuclear Projects Unit 2i l'>ashington Pub lic    Powe    05000397 AUTH ~ NAME             AUTHOR   AFFILIATION RENBERGERiD ~ L,           Washington Public Power Supply System RECIP ~ NAME             RECIPIENT AFFILIATION ENGELKENiR ~ HE             Region 5i San Franciscor Office of the Director
~HE Region 5i San Franciscor Office of the  


==SUBJECT:==
==SUBJECT:==
Forwards interim deficiency rept re violation of thickness on small, bore piping+Director min wall DISTRIBUTION CODE: B019B COPIES RECEIVED;LTR g ENCL g SIZEtQ TITLE: Construction Deficiency Report (10CFR50,55E)
Forwards           interim deficiency rept re violation of       min wall thickness     on small, bore piping+
II r r~OTES~REC I'P IENT ID CODE/NAME ACTION: 14 PM+)~<P/1/~~20 LA g c/INTERNAL: 0 05 ILE 08 MPA 10 QAB 13F IELD COOR/IE 17 AD-PLANT SYS 22 DIR DPM AD/RCI/IE AEOD GEOSCIENCES BR ISC SYS BR MECH ENG BR STRUCT ENG BR 1?1 1 1 1 1 1 1 1 1 1 1 COPIES L'TTR ENCL 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 RECIPIENT COPIES ID CODE/NAME LTTR ENCL 15 BC 4~+4'/1 1 21 AD g gag 1 1 02 NRC PDR 07 EDO L STAFF 09 DEPY DIR OPM 11 STANDRDS DEV 16 AD FOR ENGR 17 AD REAC, SFTY 23 OELD AD/SITE TECH DIRECTOR DSE HANAUERgS~MATL ENG BR POKER SYS BR EXTERNAL: 03 LPDR 24 ACRS 1 1 16 16 04 NSIC 1 1~0048 Sw8 mal"-@.~Ega,Q,$84 gp8%&EH~~APR 28~esp g~TOTAL NUMBER OF COPIES REQUIRED!LTTR~ENCL 48 y P I S I I 4 P ih Washington Public Power Supply System A JOINT OPERATING AGENCY P.O.Box 958 3000 Gso.WAsRlsoroN WAY R<cvLANor WAsHINcroH 99352 PHoNK (509)375.5ooo April 21, 1980 G02-80-93 Nuclear Regulatory Commission Region V Office of Inspecti on and Enforcement Suite 202, Walnut Creek Plaza 1990 N.California Blvd.Walnut Creek, California 94596 Attention:
DISTRIBUTION CODE: B019B             COPIES RECEIVED;LTR g ENCL g SIZEtQ TITLE: Construction Deficiency Report (10CFR50,55E)
Mr.R.H.Engelken, Director  
II r r ~
OTES ~
REC I'P IENT           COPIES            RECIPIENT        COPIES ID CODE/NAME           L'TTR ENCL      ID CODE/NAME      LTTR ENCL ACTION:       14 PM   +) <P/1/~~
                            ~
1       1   15 BC 4~+ 4'/       1     1 20 LA              g c/    1      1  21 AD g gag         1    1 INTERNAL:      0                            1       1  02 NRC PDR 05 ILE                      2      ?  07 EDO L STAFF 08 MPA                      1      1  09 DEPY DIR OPM 10 QAB                      1      1  11 STANDRDS DEV 13F IELD COOR/IE                    1  16 AD FOR ENGR 17 AD- PLANT SYS            1      1  17 AD REAC, SFTY 22 DIR    DPM              1      1  23 OELD AD/RCI/IE                    1      1  AD/SITE TECH AEOD                        1      1  DIRECTOR DSE GEOSCIENCES      BR        1      1  HANAUERgS ~
ISC SYS BR                  1      1  MATL ENG BR MECH ENG BR                  1      1  POKER SYS BR STRUCT ENG BR                1      1 EXTERNAL: 03 LPDR                           1       1   04 NSIC               1     1 24 ACRS                    16    16
                                                            ~0048 Sw8 ma l"-
                                                                                            ~  ~
APR 28 ~esp
                                                            @. ~Ega,Q,$ 84 gp8 %&EH g~
TOTAL NUMBER OF COPIES REQUIRED! LTTR                 ~     ENCL   48
 
yP I S I I 4
ih P
 
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. Box 958   3000 Gso. WAsRlsoroN WAY   R<cvLANor WAsHINcroH 99352 PHoNK (509) 375.5ooo April 21,     1980 G02-80-93 Nuclear Regulatory Commission Region     V Office of Inspecti         on and Enforcement Suite 202, Walnut Creek Plaza 1990 N. California Blvd.
Walnut Creek,       California       94596 Attention:             Mr. R. H. Engelken,       Director


==Subject:==
==Subject:==
WPPSS NUCLEAR PROJECT NO.2 DOCKET NO.50-397, CPPR-93 REPORTABLE DEFICIENCY 10CFR50.55 e  
WPPSS   NUCLEAR PROJECT NO. 2 DOCKET NO. 50-397, CPPR-93 REPORTABLE DEFICIENCY 10CFR50.55             e
 
==Dear Nr. Engelken:==


==Dear Nr.Engelken:==
In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on March 19, 1980, of a reportable condition regarding the violation of. minimum wall thickness on small bore piping.
In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on March 19, 1980, of a reportable condition regarding the violation of.minimum wall thickness on small bore piping.Attached is our interim report concerning this deficiency.
Attached is our interim report concerning this deficiency. A final report will be scheduled when our design analysis is completed.
A final report will be scheduled when our design analysis is completed.
Please contact us         if you have   additional questions.
Please contact us if you have additional questions.
Very truly yours, D. L. Renberger Assistant Director, Technology DLR/RTJ/im
Very truly yours, DLR/RTJ/im


==Attachment:==
==Attachment:==
 
As stated
As stated'cc: JR Lewis, BPA w/1 JJ Byrnes, B8R w/1 ,.V Stello, Director, NRC, WDC w/1 JJ Verderber, B8R w/1 WNP2 Files w/1 LIS-NUS Corporation w/1 D.L.Renberger Assistant Director, Technology)Olf 58 8 0 0 43 8 0+P+j}}
'cc: JR Lewis, BPA w/1 JJ Byrnes, B8R w/1
      ,. V   Stello, Director,     NRC, WDC     w/1                                         )Olf JJ Verderber, B8R w/1                                                                 58 WNP2 Files w/1 LIS-NUS Corporation w/1 8 0 0 43 8 0   +P+j}}

Latest revision as of 16:45, 29 October 2019

Forwards Interim Deficiency Rept Re Violation of Min Wall Thickness on Small Bore Piping
ML17272A934
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 04/21/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17272A935 List:
References
GO2-80-93, NUDOCS 8004280475
Download: ML17272A934 (4)


Text

hw 4k.

v'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) I 1)

ACCESSION NBR:8004?80475 DOC ~ DATE: 80/04/21 NOTARIZED: NO DOCKET FACIL:50-397 NPPSS Nuclear Projects Unit 2i l'>ashington Pub lic Powe 05000397 AUTH ~ NAME AUTHOR AFFILIATION RENBERGERiD ~ L, Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION ENGELKENiR ~ HE Region 5i San Franciscor Office of the Director

SUBJECT:

Forwards interim deficiency rept re violation of min wall thickness on small, bore piping+

DISTRIBUTION CODE: B019B COPIES RECEIVED;LTR g ENCL g SIZEtQ TITLE: Construction Deficiency Report (10CFR50,55E)

II r r ~

OTES ~

REC I'P IENT COPIES RECIPIENT COPIES ID CODE/NAME L'TTR ENCL ID CODE/NAME LTTR ENCL ACTION: 14 PM +) <P/1/~~

~

1 1 15 BC 4~+ 4'/ 1 1 20 LA g c/ 1 1 21 AD g gag 1 1 INTERNAL: 0 1 1 02 NRC PDR 05 ILE 2  ? 07 EDO L STAFF 08 MPA 1 1 09 DEPY DIR OPM 10 QAB 1 1 11 STANDRDS DEV 13F IELD COOR/IE 1 16 AD FOR ENGR 17 AD- PLANT SYS 1 1 17 AD REAC, SFTY 22 DIR DPM 1 1 23 OELD AD/RCI/IE 1 1 AD/SITE TECH AEOD 1 1 DIRECTOR DSE GEOSCIENCES BR 1 1 HANAUERgS ~

ISC SYS BR 1 1 MATL ENG BR MECH ENG BR 1 1 POKER SYS BR STRUCT ENG BR 1 1 EXTERNAL: 03 LPDR 1 1 04 NSIC 1 1 24 ACRS 16 16

~0048 Sw8 ma l"-

~ ~

APR 28 ~esp

@. ~Ega,Q,$ 84 gp8 %&EH g~

TOTAL NUMBER OF COPIES REQUIRED! LTTR ~ ENCL 48

yP I S I I 4

ih P

Washington Public Power Supply System A JOINT OPERATING AGENCY P. O. Box 958 3000 Gso. WAsRlsoroN WAY R<cvLANor WAsHINcroH 99352 PHoNK (509) 375.5ooo April 21, 1980 G02-80-93 Nuclear Regulatory Commission Region V Office of Inspecti on and Enforcement Suite 202, Walnut Creek Plaza 1990 N. California Blvd.

Walnut Creek, California 94596 Attention: Mr. R. H. Engelken, Director

Subject:

WPPSS NUCLEAR PROJECT NO. 2 DOCKET NO. 50-397, CPPR-93 REPORTABLE DEFICIENCY 10CFR50.55 e

Dear Nr. Engelken:

In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on March 19, 1980, of a reportable condition regarding the violation of. minimum wall thickness on small bore piping.

Attached is our interim report concerning this deficiency. A final report will be scheduled when our design analysis is completed.

Please contact us if you have additional questions.

Very truly yours, D. L. Renberger Assistant Director, Technology DLR/RTJ/im

Attachment:

As stated

'cc: JR Lewis, BPA w/1 JJ Byrnes, B8R w/1

,. V Stello, Director, NRC, WDC w/1 )Olf JJ Verderber, B8R w/1 58 WNP2 Files w/1 LIS-NUS Corporation w/1 8 0 0 43 8 0 +P+j