ML080740416: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080740416
| number = ML080740416
| issue date = 03/14/2008
| issue date = 03/14/2008
| title = 04/08/2008 Notice of Meeting with Progress Energy Florida to Discuss the NRC Reactor Oversight Process Annual Assessment for Crystal River Nuclear Station
| title = Notice of Meeting with Progress Energy Florida to Discuss the NRC Reactor Oversight Process Annual Assessment for Crystal River Nuclear Station
| author name = Sykes M D
| author name = Sykes M
| author affiliation = NRC/RGN-II/DRP/RPB3
| author affiliation = NRC/RGN-II/DRP/RPB3
| addressee name = Young D E
| addressee name = Young D
| addressee affiliation = Florida Power Corp, Progress Energy Carolinas, Inc
| addressee affiliation = Florida Power Corp, Progress Energy Carolinas, Inc
| docket = 05000302
| docket = 05000302
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 14, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B) ATTN: Supervisor, Licensing &     Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 14, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)
ATTN: Supervisor, Licensing &
Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708


==SUBJECT:==
==SUBJECT:==
MEETING ANNOUNCEMENT - PUBLIC MEETING - CRYSTAL RIVER NUCLEAR PLANT - DOCKET NO. 50-302  
MEETING ANNOUNCEMENT - PUBLIC MEETING - CRYSTAL RIVER NUCLEAR PLANT - DOCKET NO. 50-302


==Dear Mr. Stall:==
==Dear Mr. Stall:==


This letter confirms the conversation between Mr. Thomas Morrissey, of this office, and members of your staff, concerning a Category 1 meeting which has been scheduled for April 8, 2008, at 1:00 p.m. A meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your Crystal River Nuclear Station.  
This letter confirms the conversation between Mr. Thomas Morrissey, of this office, and members of your staff, concerning a Category 1 meeting which has been scheduled for April 8, 2008, at 1:00 p.m. A meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your Crystal River Nuclear Station.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4629.
Should you have any questions concerning this meeting, please contact me at (404) 562-4629.
Sincerely,       /RA by Scott Shaeffer for/
Sincerely,
Marvin D. Sykes, Chief       Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-302 License Nos.: DPR-72  
                                              /RA by Scott Shaeffer for/
Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-302 License Nos.: DPR-72


==Enclosure:==
==Enclosure:==
As stated cc w/encl.: (See page 2)
As stated cc w/encl.: (See page 2)
 
_________________________ OFFICE RII:DRP RII:DRP      SIGNATURE SMS for JDH4      NAME MSykes JHamman      DATE 03/14/2008 03/14/2008 3/      /2008 3/      /2008 3/      /2008 3/      /2008 3/      /2008 E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO FPC 2 cc w/encl: Jon A. Franke Director Site Operations Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
 
Michael J. Annacone Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
 
Phyllis Dixon Manager Nuclear Assessment Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution Stephen J. Cahill Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A) Florida Power Corporation Electronic Mail Distribution Steven R. Carr Associate General Counsel Legal Department Progress Energy Service Company, LLC Electronic Mail Distribution
 
William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution
 
Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution


Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL   36250  
OFFICE              RII:DRP          RII:DRP SIGNATURE            SMS for          JDH4 NAME                MSykes            JHamman DATE                    03/14/2008        03/14/2008      3/  /2008      3/  /2008      3/ /2008      3/  /2008      3/ /2008 E-MAIL COPY?          YES        NO    YES        NO    YES        NO  YES        NO  YES      NO  YES        NO    YES      NO FPC                                2 cc w/encl:
Jon A. Franke                        Steven R. Carr Director Site Operations            Associate General Counsel Crystal River Nuclear Plant (NA2C)  Legal Department Electronic Mail Distribution        Progress Energy Service Company, LLC Electronic Mail Distribution Michael J. Annacone Plant General Manager                William A. Passetti Crystal River Nuclear Plant (NA2C)  Bureau of Radiation Control Electronic Mail Distribution        Department of Health Electronic Mail Distribution Phyllis Dixon Manager                              Craig Fugate Nuclear Assessment                  Director Crystal River Nuclear Plant (NA2C)  Division of Emergency Preparedness Electronic Mail Distribution        Department of Community Affairs Electronic Mail Distribution Stephen J. Cahill Crystal River Nuclear Plant (NA2C)  Chairman Electronic Mail Distribution        Board of County Commissioners Citrus County R. Alexander Glenn                  110 N. Apopka Avenue Associate General Counsel            Inverness, FL 36250 (MAC - BT15A)
Florida Power Corporation            Jim Mallay Electronic Mail Distribution        Framatome ANP, Inc.
Electronic Mail Distribution


Jim Mallay Framatome ANP, Inc. Electronic Mail Distribution FPC 3 Letter to Dale E. Young from Marvin D. Sykes dated March 14, 2008  
FPC                                       3 Letter to Dale E. Young from Marvin D. Sykes dated March 14, 2008


==SUBJECT:==
==SUBJECT:==
MEETING ANNOUNCEMENT - PUBLIC MEETING - CRYSTAL RIVER NUCLEAR STATION - DOCKET NO. 50-302 Distribution w/encl:
MEETING ANNOUNCEMENT - PUBLIC MEETING - CRYSTAL RIVER NUCLEAR STATION - DOCKET NO. 50-302 Distribution w/encl:
Region II Administrator's Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS S. Bailey, NRR L Slack, RII RIDSNRRDIRS OE Mail PUBLIC
Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS S. Bailey, NRR L Slack, RII RIDSNRRDIRS OE Mail PUBLIC
 
Enclosure


==SUBJECT:==
==SUBJECT:==
PUBLIC MEETING WITH PROGRESS ENERGY FACILITY: Crystal River Nuclear Plant DOCKETS: 50-302 DATE & TIME: Tuesday, April 8, 2008, at 1:00 p.m. (EDT) LOCATION: Crystal River Nuclear Plant EOF/Training Center 8200 West Venable Street, Crystal River FL 34429 PURPOSE: The purpose of this meeting is to discuss the NRC Reactor Oversight Process Annual Assessment for Crystal River Nuclear Station. This is a newly scheduled meeting. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML080630259) or from the NRC Web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/cr_2007q4.pdf   The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding the conduct of NRC meetings. CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Seating may be limited and will be available on a first-come basis. If reasonable accommodations are required to attend/participate in the meeting (e.g., sign language interpreter, large format slides), please inform the NRC meeting contact by Wednesday, April 2 so that arrangements can be considered/made. NRC OFFICE PARTICIPATING: Region II (RII) OTHER ORGANIZATIONS PARTICIPATING:
PUBLIC MEETING WITH PROGRESS ENERGY FACILITY:     Crystal River Nuclear Plant DOCKETS:       50-302 DATE & TIME:   Tuesday, April 8, 2008, at 1:00 p.m. (EDT)
None PARTICIPANTS: NRC M. Sykes, Chief, Reactor Projects Branch 3, Division of Reactor Projects, RII T. Morrissey, Senior Resident Inspector R. Hannah, Field Public Affairs Officer, RII  
LOCATION:     Crystal River Nuclear Plant EOF/Training Center 8200 West Venable Street, Crystal River FL 34429 PURPOSE:       The purpose of this meeting is to discuss the NRC Reactor Oversight Process Annual Assessment for Crystal River Nuclear Station. This is a newly scheduled meeting. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML080630259) or from the NRC Web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/cr_2007q4.pdf The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding the conduct of NRC meetings.
 
CATEGORY:     This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Seating may be limited and will be available on a first-come basis. If reasonable accommodations are required to attend/participate in the meeting (e.g., sign language interpreter, large format slides), please inform the NRC meeting contact by Wednesday, April 2 so that arrangements can be considered/made.
LICENSEE Mr. Dale E. Young, Vice President, Crystal River Nuclear Plant Mr. Jon Franke, Director, Site Operations, Crystal River Nuclear Plant Mr. Mike Annacone, Plant General Manager, Crystal River Nuclear Plant  
NRC OFFICE     Region II (RII)
PARTICIPATING:
OTHER         None ORGANIZATIONS PARTICIPATING:
PARTICIPANTS: NRC M. Sykes, Chief, Reactor Projects Branch 3, Division of Reactor Projects, RII T. Morrissey, Senior Resident Inspector R. Hannah, Field Public Affairs Officer, RII LICENSEE Mr. Dale E. Young, Vice President, Crystal River Nuclear Plant Mr. Jon Franke, Director, Site Operations, Crystal River Nuclear Plant Mr. Mike Annacone, Plant General Manager, Crystal River Nuclear Plant Enclosure


Enclosure MEETING CONTACT: Marvin Sykes (404) 562-4629 MDS1@nrc.gov AUDIO TELE-CONFERENCING: Not Available VIDEO TELE-CONFERENCING: Not Available}}
MEETING       Marvin Sykes CONTACT:     (404) 562-4629 MDS1@nrc.gov AUDIO TELE-   Not Available CONFERENCING:
VIDEO TELE-   Not Available CONFERENCING:
Enclosure}}

Latest revision as of 05:48, 13 March 2020

Notice of Meeting with Progress Energy Florida to Discuss the NRC Reactor Oversight Process Annual Assessment for Crystal River Nuclear Station
ML080740416
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 03/14/2008
From: Marvin Sykes
NRC/RGN-II/DRP/RPB3
To: Young D
Florida Power Corp, Progress Energy Carolinas
M. Sykes,404-562-4629
References
Download: ML080740416 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 March 14, 2008 Mr. Dale E. Young, Vice President Crystal River Nuclear Plant (NA1B)

ATTN: Supervisor, Licensing &

Regulatory Programs 15760 West Power Line Street Crystal River, FL 34428-6708

SUBJECT:

MEETING ANNOUNCEMENT - PUBLIC MEETING - CRYSTAL RIVER NUCLEAR PLANT - DOCKET NO. 50-302

Dear Mr. Stall:

This letter confirms the conversation between Mr. Thomas Morrissey, of this office, and members of your staff, concerning a Category 1 meeting which has been scheduled for April 8, 2008, at 1:00 p.m. A meeting notice, which provides additional details, is enclosed. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your Crystal River Nuclear Station.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4629.

Sincerely,

/RA by Scott Shaeffer for/

Marvin D. Sykes, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos.: 50-302 License Nos.: DPR-72

Enclosure:

As stated cc w/encl.: (See page 2)

OFFICE RII:DRP RII:DRP SIGNATURE SMS for JDH4 NAME MSykes JHamman DATE 03/14/2008 03/14/2008 3/ /2008 3/ /2008 3/ /2008 3/ /2008 3/ /2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FPC 2 cc w/encl:

Jon A. Franke Steven R. Carr Director Site Operations Associate General Counsel Crystal River Nuclear Plant (NA2C) Legal Department Electronic Mail Distribution Progress Energy Service Company, LLC Electronic Mail Distribution Michael J. Annacone Plant General Manager William A. Passetti Crystal River Nuclear Plant (NA2C) Bureau of Radiation Control Electronic Mail Distribution Department of Health Electronic Mail Distribution Phyllis Dixon Manager Craig Fugate Nuclear Assessment Director Crystal River Nuclear Plant (NA2C) Division of Emergency Preparedness Electronic Mail Distribution Department of Community Affairs Electronic Mail Distribution Stephen J. Cahill Crystal River Nuclear Plant (NA2C) Chairman Electronic Mail Distribution Board of County Commissioners Citrus County R. Alexander Glenn 110 N. Apopka Avenue Associate General Counsel Inverness, FL 36250 (MAC - BT15A)

Florida Power Corporation Jim Mallay Electronic Mail Distribution Framatome ANP, Inc.

Electronic Mail Distribution

FPC 3 Letter to Dale E. Young from Marvin D. Sykes dated March 14, 2008

SUBJECT:

MEETING ANNOUNCEMENT - PUBLIC MEETING - CRYSTAL RIVER NUCLEAR STATION - DOCKET NO. 50-302 Distribution w/encl:

Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS S. Bailey, NRR L Slack, RII RIDSNRRDIRS OE Mail PUBLIC

SUBJECT:

PUBLIC MEETING WITH PROGRESS ENERGY FACILITY: Crystal River Nuclear Plant DOCKETS: 50-302 DATE & TIME: Tuesday, April 8, 2008, at 1:00 p.m. (EDT)

LOCATION: Crystal River Nuclear Plant EOF/Training Center 8200 West Venable Street, Crystal River FL 34429 PURPOSE: The purpose of this meeting is to discuss the NRC Reactor Oversight Process Annual Assessment for Crystal River Nuclear Station. This is a newly scheduled meeting. The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS) (ML080630259) or from the NRC Web site at http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/cr_2007q4.pdf The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding the conduct of NRC meetings.

CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Seating may be limited and will be available on a first-come basis. If reasonable accommodations are required to attend/participate in the meeting (e.g., sign language interpreter, large format slides), please inform the NRC meeting contact by Wednesday, April 2 so that arrangements can be considered/made.

NRC OFFICE Region II (RII)

PARTICIPATING:

OTHER None ORGANIZATIONS PARTICIPATING:

PARTICIPANTS: NRC M. Sykes, Chief, Reactor Projects Branch 3, Division of Reactor Projects, RII T. Morrissey, Senior Resident Inspector R. Hannah, Field Public Affairs Officer, RII LICENSEE Mr. Dale E. Young, Vice President, Crystal River Nuclear Plant Mr. Jon Franke, Director, Site Operations, Crystal River Nuclear Plant Mr. Mike Annacone, Plant General Manager, Crystal River Nuclear Plant Enclosure

MEETING Marvin Sykes CONTACT: (404) 562-4629 MDS1@nrc.gov AUDIO TELE- Not Available CONFERENCING:

VIDEO TELE- Not Available CONFERENCING:

Enclosure