ML20094J654: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project = TAC:56041
| stage = Other
}}
}}



Latest revision as of 19:54, 24 September 2022

Forwards Analyses of Capsule TE1-B,Toledo Edison Co, Davis-Besse Nuclear Power Station,Unit 1 Reactor Vessel Matl Surveillance Program
ML20094J654
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/10/1984
From: Crouse R
TOLEDO EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20094J656 List:
References
1069, TAC-56041, NUDOCS 8408140410
Download: ML20094J654 (1)


Text

,

TOLEDO

%mm EDISON RcsAno P. CROUSE Docket No. 50-346 v , ,,,_

Nuclear License No. NPF-3 Serial No. 1069 August 10, 1984 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nu'elear Reactor Regulation United States Nuclear Regulatory Commission Washington, D.C. 26355

Dear Mr. Eisenhut:

Toledo Edison submits the attached report, BAW-1834, Analysis of Capsule TEl-B (5 copies), in accordance with 10 CFR 50, Appendix H, Section III (Report of Test Results, Reactor Vessel Material Surveillance Program) for the Davis-Besse Nuclear Power Station Unit No. 1. As a result of the expected shift in irradiated material properties, revised pressure--temper-ature operating curves are expected to be submitted for approval in the last quarter of 1985, prior to the limit of 5 EFPY for the existing curves.

Very truly yours,

=-

RPC: GAB:lah attachment.(5 copies) cc: DB-1 NRC Resident Inspector go( 0 THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652 8408140410 840810 '

PDR ADOCK-05000346 a P PDR u.