{{Adams | |||
| number = ML20199F925 | |||
| issue date = 01/11/1999 | |||
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/98-05 & 50-353/98-05 | |||
| author name = Yerokun J | |||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |||
| addressee name = Rainey G | |||
| addressee affiliation = PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC | |||
| docket = 05000352, 05000353 | |||
| license number = | |||
| contact person = | |||
| document report number = 50-352-98-05, 50-352-98-5, 50-353-98-05, 50-353-98-5, NUDOCS 9901220092 | |||
| title reference date = 09-08-1998 | |||
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | |||
| page count = 2 | |||
}} | |||
See also: [[see also::IR 05000352/1998005]] | |||
=Text= | |||
{{#Wiki_filter:_ _ _ | |||
* l | |||
. 1 | |||
9 | |||
January 11, 1999 1 | |||
l | |||
l | |||
l | |||
1 | |||
l | |||
4 | |||
l | |||
' | |||
I | |||
Mr. ''i. Rainey, President | |||
PECO Nuclear | |||
Nuclear Group Headquarters | |||
i Correspondence Control Desk | |||
l P. O. Box 195 | |||
Wayne, PA 19087-0195 | |||
l \ | |||
SUBJECT: NRC INSPECTION REPORT NO. 50-352/98-05 AND 50-353/98-05- REPLY l | |||
Dear Mr. Rainey: | |||
This letter refers to your September 8,1998 correspondence, in reponse to our | |||
August 7,1998 letter. | |||
Thank you for informing us of the corrective and preventive actions documented in your | |||
letter. These actions will be examined during a future inspectic n of your licensed program. | |||
Your cooperation with us is appreciated. | |||
Sincerely, i | |||
! | |||
l | |||
l | |||
Jimi T. Yerokun, Acting Chief l | |||
Engineering Programs Branch | |||
Division of Reactor Safety | |||
Docket No. 50-352;50-353 | |||
cc: | |||
J. J. Hagan, Vice President, Nuclear Station Support | |||
G. Edwards, Chairman, Nuclear Review Board and Director - Licensing | |||
J. von Suskil, Vice President - Limerick Generating Station | |||
M. P. Gallagher, Plant Manager, Limerick Generating Station | |||
T. Moore, Manager, Experience Assessment | |||
Secretary, Nuclear Committee of the Board | |||
Commonwealth of Pennsylvania | |||
210018 i | |||
9901220092 990111 | |||
PDR ADOCK 05000352 | |||
O PDR | |||
. .- . - . - . . - - - - - = . . . .- | |||
< | |||
s = | |||
. | |||
Mr. G. Rainey 2 | |||
Distribution: | |||
Region i Docket Room (with concurrencen | |||
W. Lanning, DRS | |||
W. Ruland, DRS | |||
J. Yerokun, DRS | |||
A. Lohmeier, DRS | |||
C. 6%3i LL. DRP | |||
D. Florek, DRP | |||
R. Junod, DRP | |||
NRC Resident inspector | |||
Nuclear Safety information Center (NSIC) | |||
PUBLIC | |||
G. Shear, OEDO | |||
R. Capra, PDl-2 N3R | |||
B. Buckley, PL 1-2, NRR | |||
M. Thadani, PD 1-2, NRR | |||
R. Correia, NRR | |||
M. Campion, ORA | |||
DOCDESK | |||
inspection Program Branch, NRR (IPAS) | |||
DRS File | |||
i | |||
I | |||
i | |||
DOCUMENT NAME: G:\ PROGRAMS \LOHMElER\ LIM 9805. REP | |||
; | |||
T4 teceive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachrnent/ enclosure "N" = No | |||
l COPY n _ | |||
i OFFICE Rl/DRS fy l ( Rl/DRf,.f3 Rl/DRS IWORA l l | |||
NAME ALohmeier / Q{l CCo; Vgf( ' \ JYerokun @7 M | |||
DATE 01/06/99 U\ 01/[/99 01/sh/99 V N 01/ /99 | |||
OFFICIAL RECORD COPY | |||
l | |||
: | |||
I | |||
! | |||
' | |||
l | |||
i | |||
~ _ _ - . - | |||
,, ,g - ~ | |||
- | |||
- | |||
. | |||
t_re c_,so s,a,- | |||
!. | |||
' | |||
PECO NUCLEAR n co c,em ,co ,an, | |||
A Unit of PECO Energy M,x23OO i | |||
sanatoga. PA 19464 0920 | |||
610 718 3000 / Faz 610 718 3008 , | |||
Pager 1800 672 2285 #02 71 | |||
Internet address gvonsuskilia'gwco energyenr., | |||
10 CFR 2.201 | |||
1 | |||
l | |||
September 8,1998 | |||
Docket Nos. 50 352 | |||
50-353 | |||
, | |||
License Nos. NPF-39 | |||
NPF-85 | |||
U.S. Nuclear Regulatory Commission ' | |||
Attn.: Document Control Desk | |||
Washington, DC 20555 | |||
SUBJECT: Limerick Generating Station, Units 1 and 2 | |||
Reply to a Notice of Violation | |||
NRC Inspection Report 50-352/98-05 and 50-353/98-05 | |||
Attached is PECO Nuclear's reply to a Notice of Violation for Limerick Generating Station | |||
(LGS) Unit 1, that was contained in your letter dated August 7,1998. The Notice identified one ! | |||
violation, with two examples, where conditions adverse to quality were not promptly identified | |||
and corrected. The attachment to this letter provides a restatement of the violations followed | |||
by our reply. | |||
If you have any questions or require additional information, please contact us. | |||
Very truly yours, | |||
l | |||
$50k | |||
Enclosure | |||
Attachments | |||
cc: H. J. Miller, Administrator, Region I, USNRC w/ attachments | |||
A. L. Burritt, USNRC Senior Resident inspector, LGS " | |||
l | |||
l | |||
l | |||
l | |||
l | |||
' | |||
w | |||
-. - - - - - - - - _ _ _ - . | |||
- . _ . _ - . . . - - . . _ . . | |||
l | |||
l , - | |||
Atttchment | |||
! | |||
l , Dock t Nos. 50-352 and 50-353 | |||
S:ptamb:r 8,1998 | |||
l | |||
- | |||
Page 1 of 3 | |||
1 | |||
REPLY TO A NOTICE OF VIOLATION | |||
Restatement of the Violations | |||
i | |||
During an NRC inspection conducted between June 1,1998, and June 24,1998, a violation of | |||
NRC requirements was identified. In accordance with the General Statement of Policy arid | |||
> | |||
Procedure for NRC Enforcement Actions, NUREG-1600, the violation is listed below: | |||
A. 10 CFR 50, Appendix B, Criterion XVI, requires, in part, that: " Measures shall be | |||
i | |||
' | |||
established to assure that conditions adverse to quality, such as failures, malfunc; ions, | |||
deficiencies, deviations, defective material and equipment and nonconformances . ire | |||
promptly identified and corrected." | |||
l Contrary to the above, the following conditions adverse to qualit, .ce not promptly | |||
l Identified and corrected. | |||
l | |||
1. | |||
Defective equipment (an incorrectly wired current transformer) in the supply l | |||
circuit breaker of load center 124B was not identified and corrected, and on l | |||
March 22,1998 the breaker tripped unexpectedly and de-energized all the loads I | |||
supplied by the load center. PECO was aware of potential wiring errors ! | |||
i | |||
affecting the circuit breakers used at Limerick since November 1996 based on | |||
industry operating experience. PECO had failed to revise the pendic | |||
l | |||
calibration procedure, which could have identified the incorrectly wired current . | |||
i transformers and prevented the event. | |||
I | |||
, | |||
2. Deficiencies (age-related failures) in Agastat relays in three panels (OA, OB, | |||
I | |||
and OC-C124) were not identified and corrected. Due to higher panel | |||
temperatures, the continued use of these Agastat relays beyond their | |||
appropriate service life led to higher age-related failures, including the l | |||
April 4,1998, event in which the B train of the control room emergency fresh air ; | |||
supply (CREFAS) system did not actuate. On June 19,1998, several such ! | |||
relays remained in service, considerabiy beyond their calculated service lives. | |||
This is a Severity Level IV Violation (Supplement 1). | |||
l | |||
; | |||
1 | |||
i | |||
, | |||
. | |||
Attachment I | |||
i | |||
' | |||
Dock;t Nos. 50-352 and 50-353 | |||
, | |||
Sept:mb;r 8,1998 | |||
* Page 2 of 3 | |||
Reply to Violation A | |||
AoQsion of the Violation | |||
PECO Energy acknowledges the violation. | |||
Reaso s for the Violations | |||
2 | |||
Both ext uples cited in the violation were caused by untimely completion of corrective actions | |||
for self-ic antified problems. | |||
-_ | |||
The reason for example (1) of the violation, as stated in Licensee Event Report 1-98-005, Rev. | |||
; 0, for Limerick Generating Station (LGS), Unit 1, is described below. | |||
l | |||
The 124B load cen'er tripped due to improper wiring of the current transformer (CT) | |||
circuit for one of the load center feeder breaker's protective re!ays. This improper | |||
, | |||
' | |||
i configuration causec' the feeder breaker (124B-62) to trip prematurely under normal l | |||
plant loading. The improperty wired CT circuit was supplied in that configuration by the | |||
manufacturer, however, station calibration procedures were less than adequate to | |||
l | |||
!dentity this situation. An Operating Experience item, related to CT configuration l | |||
causing a premature creaker trip, was reviewed in November 1996, determined to be | |||
; | |||
app!!c.able, and the procedure revision action item was created. The CT configuration ! | |||
issue m3 reviewed again in 1997 when the vendor issued a 10CFR Part 21 notice for l | |||
the same concem. The target breaker calibration procedure had not been revised | |||
l | |||
when it was used during breaker maintenance four days prior to this event. | |||
The reason for example (2) was work prioritization such that the review of Agastat relay service | |||
conditions and the planned relay replacements in the OA,08, and OC-C124 panels were not | |||
completed in a timely manner. The OA, Otl, and OC-C124 panels are designated as a mild | |||
environment in design documents. Relay replacement dates were therefore established, using | |||
PECON procedures, commensurate with the safety significance of the relays and the expected | |||
service environment. In 1997, failure data indicated that the service environment in the OA, ! | |||
08, and OC-C124 p anels may be contributing to a higher than expected failure rate. A service | |||
environment and relay failure study was initiated for the subject panels and other panels. This | |||
resulted in a recommendation that Agastat relays be established as a Maintenance Rule | |||
Program (a)(1) system. Corrective actionT were initiated that included accelerated | |||
replacement of certain relays, including specific relays in the OA, 08, and OC-C124 panels. | |||
The data analysis re.vealed that the higher than expected Agastat relay failure rate in these | |||
panels was caused by localized heating effects. The majority of relays that failed were either | |||
at the top of the prnel (highest temperature in the panel) or were near energized instrument | |||
power supplies. | |||
Corrective Actions Taken and Results Achieved | |||
The corrective actions for the load center breaker issue (example (1)) are described in LER 1- | |||
98-005. An Engineering analysis was ccmpleted on March 26,1998, that determined that | |||
there was no adverse impact on t5e operability of load center breakers susceptible to the same | |||
_ | |||
_ . - . -.- - - - . . - - - _- .- -=_.- - - . - . . - - - - - - - . | |||
, ,. Attrchmsnt | |||
Dockst Nos. 50-352 and 50-353 | |||
7 Ssptsmber 8,1998 | |||
* | |||
Page 3 of 3 | |||
' CT configuration concern. The load center breaker calibration procedure (M-C-700-230) was | |||
revised on April 4,1998. No additionalload center breaker trips, due to CT configuration, have | |||
occurred sirice March 22,1998. | |||
Completed corrective actions for the Agastat relay issues (example (2)) are described below. | |||
To date,85 % of the Unit 1 and Common (oldest) Agastat relays in the subject panels (OA,08, | |||
and OC-C124) have been replaced. All of the remaining normally energized relays (including | |||
Unit 2) are scheduled for replacement prior to the end of 1998. An Engineering analysis was | |||
completed on August 4,1998, and documented the acceptability of continued use of Agastat | |||
relays in the OA, OB, and OC-C124 panels up to the time of their scheduled replacement. | |||
Engineering has evaluated the status of th'e Limerick Agastat relay failure analysis and | |||
replacement program, including an assessment of the technicalissues raised during the June | |||
1998 NRC inspection. Corrective actions include appropriately adjusting relay replacement 4 | |||
due dates and frequencies, maximizing the planning and execution effort for all relays, and I | |||
applying lessons leamed to the Unit 2 panels with normally energized relays. Engineering | |||
provided a presentation to station management in August,1998 on the status of the Agastat | |||
relay evaluation and replacement program. | |||
Corrective Actions to Avoid Future Noncompliance | |||
As of August 28,1998, all but three (3) load center breakers had been tested with the revised | |||
test. The remaining three (3) are scheduled to be completed by December 1,1998. | |||
Agastat relay failures and service life estimates are being tracked and evaluated on an | |||
ongoing basis and the relays are replaced on an ongoing basis. The results of the in-plant | |||
data analysis are being incorporated into the Preventive Maintenance program for each Q- | |||
listed Agastat relay. Expected service lives are being adjusted based on service environment | |||
, | |||
' effects, such as localized heating. The Agastat relay system Maintenance Rute Program (a)(1) | |||
action plan will be used to restore performance to (a)(2) status. | |||
pate When Full Compliance was Achieved | |||
Full compliance was achieved on August 4,1998, when Engineering analyses were completed | |||
that supported continued operation in light of the identified load center breaker CT | |||
configuration and Agastat relay service life issues. | |||
I | |||
! | |||
! | |||
}} |
Latest revision as of 15:24, 20 December 2021
ML20199F925 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 01/11/1999 |
From: | Jimi Yerokun NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | Rainey G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
References | |
50-352-98-05, 50-352-98-5, 50-353-98-05, 50-353-98-5, NUDOCS 9901220092 | |
Download: ML20199F925 (2) | |
See also: IR 05000352/1998005
Text
_ _ _
- l
. 1
9
January 11, 1999 1
l
l
l
1
l
4
l
'
I
Mr. i. Rainey, President
PECO Nuclear
Nuclear Group Headquarters
i Correspondence Control Desk
l P. O. Box 195
Wayne, PA 19087-0195
l \
SUBJECT: NRC INSPECTION REPORT NO. 50-352/98-05 AND 50-353/98-05- REPLY l
Dear Mr. Rainey:
This letter refers to your September 8,1998 correspondence, in reponse to our
August 7,1998 letter.
Thank you for informing us of the corrective and preventive actions documented in your
letter. These actions will be examined during a future inspectic n of your licensed program.
Your cooperation with us is appreciated.
Sincerely, i
!
l
l
Jimi T. Yerokun, Acting Chief l
Engineering Programs Branch
Division of Reactor Safety
Docket No. 50-352;50-353
cc:
J. J. Hagan, Vice President, Nuclear Station Support
G. Edwards, Chairman, Nuclear Review Board and Director - Licensing
J. von Suskil, Vice President - Limerick Generating Station
M. P. Gallagher, Plant Manager, Limerick Generating Station
T. Moore, Manager, Experience Assessment
Secretary, Nuclear Committee of the Board
Commonwealth of Pennsylvania
210018 i
9901220092 990111
PDR ADOCK 05000352
O PDR
. .- . - . - . . - - - - - = . . . .-
<
s =
.
Mr. G. Rainey 2
Distribution:
Region i Docket Room (with concurrencen
W. Lanning, DRS
W. Ruland, DRS
J. Yerokun, DRS
A. Lohmeier, DRS
D. Florek, DRP
R. Junod, DRP
NRC Resident inspector
Nuclear Safety information Center (NSIC)
PUBLIC
G. Shear, OEDO
R. Capra, PDl-2 N3R
B. Buckley, PL 1-2, NRR
R. Correia, NRR
M. Campion, ORA
DOCDESK
inspection Program Branch, NRR (IPAS)
DRS File
i
I
i
DOCUMENT NAME: G:\ PROGRAMS \LOHMElER\ LIM 9805. REP
T4 teceive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachrnent/ enclosure "N" = No
l COPY n _
i OFFICE Rl/DRS fy l ( Rl/DRf,.f3 Rl/DRS IWORA l l
NAME ALohmeier / Q{l CCo; Vgf( ' \ JYerokun @7 M
DATE 01/06/99 U\ 01/[/99 01/sh/99 V N 01/ /99
OFFICIAL RECORD COPY
l
I
!
'
l
i
~ _ _ - . -
,, ,g - ~
-
-
.
t_re c_,so s,a,-
!.
'
PECO NUCLEAR n co c,em ,co ,an,
A Unit of PECO Energy M,x23OO i
sanatoga. PA 19464 0920
610 718 3000 / Faz 610 718 3008 ,
Pager 1800 672 2285 #02 71
Internet address gvonsuskilia'gwco energyenr.,
1
l
September 8,1998
Docket Nos. 50 352
50-353
,
License Nos. NPF-39
U.S. Nuclear Regulatory Commission '
Attn.: Document Control Desk
Washington, DC 20555
SUBJECT: Limerick Generating Station, Units 1 and 2
Reply to a Notice of Violation
NRC Inspection Report 50-352/98-05 and 50-353/98-05
Attached is PECO Nuclear's reply to a Notice of Violation for Limerick Generating Station
(LGS) Unit 1, that was contained in your letter dated August 7,1998. The Notice identified one !
violation, with two examples, where conditions adverse to quality were not promptly identified
and corrected. The attachment to this letter provides a restatement of the violations followed
by our reply.
If you have any questions or require additional information, please contact us.
Very truly yours,
l
$50k
Enclosure
Attachments
cc: H. J. Miller, Administrator, Region I, USNRC w/ attachments
A. L. Burritt, USNRC Senior Resident inspector, LGS "
l
l
l
l
l
'
w
-. - - - - - - - - _ _ _ - .
- . _ . _ - . . . - - . . _ . .
l
l , -
Atttchment
!
l , Dock t Nos. 50-352 and 50-353
S:ptamb:r 8,1998
l
-
Page 1 of 3
1
REPLY TO A NOTICE OF VIOLATION
Restatement of the Violations
i
During an NRC inspection conducted between June 1,1998, and June 24,1998, a violation of
NRC requirements was identified. In accordance with the General Statement of Policy arid
>
Procedure for NRC Enforcement Actions, NUREG-1600, the violation is listed below:
A. 10 CFR 50, Appendix B, Criterion XVI, requires, in part, that: " Measures shall be
i
'
established to assure that conditions adverse to quality, such as failures, malfunc; ions,
deficiencies, deviations, defective material and equipment and nonconformances . ire
promptly identified and corrected."
l Contrary to the above, the following conditions adverse to qualit, .ce not promptly
l Identified and corrected.
l
1.
Defective equipment (an incorrectly wired current transformer) in the supply l
circuit breaker of load center 124B was not identified and corrected, and on l
March 22,1998 the breaker tripped unexpectedly and de-energized all the loads I
supplied by the load center. PECO was aware of potential wiring errors !
i
affecting the circuit breakers used at Limerick since November 1996 based on
industry operating experience. PECO had failed to revise the pendic
l
calibration procedure, which could have identified the incorrectly wired current .
i transformers and prevented the event.
I
,
2. Deficiencies (age-related failures) in Agastat relays in three panels (OA, OB,
I
and OC-C124) were not identified and corrected. Due to higher panel
temperatures, the continued use of these Agastat relays beyond their
appropriate service life led to higher age-related failures, including the l
April 4,1998, event in which the B train of the control room emergency fresh air ;
supply (CREFAS) system did not actuate. On June 19,1998, several such !
relays remained in service, considerabiy beyond their calculated service lives.
This is a Severity Level IV Violation (Supplement 1).
l
1
i
,
.
Attachment I
i
'
Dock;t Nos. 50-352 and 50-353
,
Sept:mb;r 8,1998
- Page 2 of 3
Reply to Violation A
AoQsion of the Violation
PECO Energy acknowledges the violation.
Reaso s for the Violations
2
Both ext uples cited in the violation were caused by untimely completion of corrective actions
for self-ic antified problems.
-_
The reason for example (1) of the violation, as stated in Licensee Event Report 1-98-005, Rev.
- 0, for Limerick Generating Station (LGS), Unit 1, is described below.
l
The 124B load cen'er tripped due to improper wiring of the current transformer (CT)
circuit for one of the load center feeder breaker's protective re!ays. This improper
,
'
i configuration causec' the feeder breaker (124B-62) to trip prematurely under normal l
plant loading. The improperty wired CT circuit was supplied in that configuration by the
manufacturer, however, station calibration procedures were less than adequate to
l
!dentity this situation. An Operating Experience item, related to CT configuration l
causing a premature creaker trip, was reviewed in November 1996, determined to be
app!!c.able, and the procedure revision action item was created. The CT configuration !
issue m3 reviewed again in 1997 when the vendor issued a 10CFR Part 21 notice for l
the same concem. The target breaker calibration procedure had not been revised
l
when it was used during breaker maintenance four days prior to this event.
The reason for example (2) was work prioritization such that the review of Agastat relay service
conditions and the planned relay replacements in the OA,08, and OC-C124 panels were not
completed in a timely manner. The OA, Otl, and OC-C124 panels are designated as a mild
environment in design documents. Relay replacement dates were therefore established, using
PECON procedures, commensurate with the safety significance of the relays and the expected
service environment. In 1997, failure data indicated that the service environment in the OA, !
08, and OC-C124 p anels may be contributing to a higher than expected failure rate. A service
environment and relay failure study was initiated for the subject panels and other panels. This
resulted in a recommendation that Agastat relays be established as a Maintenance Rule
Program (a)(1) system. Corrective actionT were initiated that included accelerated
replacement of certain relays, including specific relays in the OA, 08, and OC-C124 panels.
The data analysis re.vealed that the higher than expected Agastat relay failure rate in these
panels was caused by localized heating effects. The majority of relays that failed were either
at the top of the prnel (highest temperature in the panel) or were near energized instrument
power supplies.
Corrective Actions Taken and Results Achieved
The corrective actions for the load center breaker issue (example (1)) are described in LER 1-
98-005. An Engineering analysis was ccmpleted on March 26,1998, that determined that
there was no adverse impact on t5e operability of load center breakers susceptible to the same
_
_ . - . -.- - - - . . - - - _- .- -=_.- - - . - . . - - - - - - - .
, ,. Attrchmsnt
Dockst Nos. 50-352 and 50-353
7 Ssptsmber 8,1998
Page 3 of 3
' CT configuration concern. The load center breaker calibration procedure (M-C-700-230) was
revised on April 4,1998. No additionalload center breaker trips, due to CT configuration, have
occurred sirice March 22,1998.
Completed corrective actions for the Agastat relay issues (example (2)) are described below.
To date,85 % of the Unit 1 and Common (oldest) Agastat relays in the subject panels (OA,08,
and OC-C124) have been replaced. All of the remaining normally energized relays (including
Unit 2) are scheduled for replacement prior to the end of 1998. An Engineering analysis was
completed on August 4,1998, and documented the acceptability of continued use of Agastat
relays in the OA, OB, and OC-C124 panels up to the time of their scheduled replacement.
Engineering has evaluated the status of th'e Limerick Agastat relay failure analysis and
replacement program, including an assessment of the technicalissues raised during the June
1998 NRC inspection. Corrective actions include appropriately adjusting relay replacement 4
due dates and frequencies, maximizing the planning and execution effort for all relays, and I
applying lessons leamed to the Unit 2 panels with normally energized relays. Engineering
provided a presentation to station management in August,1998 on the status of the Agastat
relay evaluation and replacement program.
Corrective Actions to Avoid Future Noncompliance
As of August 28,1998, all but three (3) load center breakers had been tested with the revised
test. The remaining three (3) are scheduled to be completed by December 1,1998.
Agastat relay failures and service life estimates are being tracked and evaluated on an
ongoing basis and the relays are replaced on an ongoing basis. The results of the in-plant
data analysis are being incorporated into the Preventive Maintenance program for each Q-
listed Agastat relay. Expected service lives are being adjusted based on service environment
,
' effects, such as localized heating. The Agastat relay system Maintenance Rute Program (a)(1)
action plan will be used to restore performance to (a)(2) status.
pate When Full Compliance was Achieved
Full compliance was achieved on August 4,1998, when Engineering analyses were completed
that supported continued operation in light of the identified load center breaker CT
configuration and Agastat relay service life issues.
I
!
!