IR 05000324/1985016: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20134N379
| number = ML20134N379
| issue date = 08/21/1985
| issue date = 08/21/1985
| title = Ack Receipt of 850808 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/85-16 & 50-325/85-16
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/85-16 & 50-325/85-16
| author name = Verrelli D
| author name = Verrelli D
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8509050114
| document report number = NUDOCS 8509050114
| title reference date = 08-08-1985
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1

Latest revision as of 10:48, 14 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/85-16 & 50-325/85-16
ML20134N379
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/21/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8509050114
Download: ML20134N379 (1)


Text

-

AUG 21 1985 Carolina Power and Light Company Y' ATTN: M E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT: REPORT NOS. 50-325/85-16 AND 50-324/85-16 Thank you for'your response of August 8,1985, to our Notice of Violation issued on July 12, 1985, concerning activities conducted at your Brunswick facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matto

Sincerely, ORIGINAL SIGNEO By DAVID M. VERRELLI David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: LP'. W. Howe, Vice President Brunswick Nuclear Project C< R. Dietz, Plant General Manager bec:LNRC Resident Inspector  !

Document Control Desk State of North Carolina

.

l 8509050114 850821 PDR ADOCK 05000324-RII G PDR PE drickson:sa 08/'>t /85 I

O ZEOI