May 24,1985
,
Carolina Power and Light Company ATTN: Mr. E. E. Utley Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
SUBJECT: REPORT NOS. 50-325/85-01 AND 50-324/85-01 Thank you for your supplemental responses of April 19, 1985 and May 3, 1985, to our Notices of Violation and Deviation, issued on February 27, 1985, concerning activities conducted at your Brunswick facility. We have evaluated your responses and found that they meet the requirements of 10 CFR 2.201. With regards to the deviation, review of your response indicates the deviation occurred as stated in the Notice of Deviation and the corrective actions stated in your response of April 19, 1985, appear adequate.
We will examine the implementation of your actions to correct the violation and the deviation during future inspections.
We appreciate your cooperation in this matter.
Sincerely, (Original signed by VLBrownlee/for)
Roger D. Walker, Director Division of Reactor Projects cc:
P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bcc: NRC Resident Inspector Document Control Desk State of North Carolina SEE PREVIOUS CONCURRENCE P, AGE RII-RII RII RII RII s
.KPoertner:cdg CAJulian AFGibson PRBemis DMVerrelli 05/ /85 05/ /85 05/ /85 05/ /85 05/ /85 8507190172 850524 PDR ADOCK 05000324 e
PDR gg / j
.
" :,
,
- .
.
. Carolina Power and Light Company ATTN: Mr. E. E. Utley Executive Vice President Power Supply and Engineering
_
and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
SUBJECT:
REPORT NOS. 50-325/85-01 AND 50-324/85-01 Thank you for your supplemental responses of April 19, 1985 and May 3, 1985, to our Notice of Violation and Deviation, issued on February 27, 1985, concerning activities conducted at your Brunswick facility. We have evaluated your responses and found that they meet the requirements of 10 CFR 2.201. With regards to the deviation, review of your response indicates the deviation occurred as stated in
- the Notice.of Deviation and the corrective actions stated in your response of April 19,.1985, appears adequate.
We will examine the implementation of your actions to correct the violation and the deviation during future inspections.
We appreciate your cooperation in this matter.
Sincerely,
'
Roger D. Walker, Director Division of Reactor Projects
.cc:
P. W. Howe, Vice President Brunswick Nuclear Project C. R..Dietz, Plant General Manager bec: NRC. Resident Inspector Document Control Desk State of North Carolina
.