IR 05000324/1985027
| ML20205H090 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 11/04/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| References | |
| NUDOCS 8511130428 | |
| Download: ML20205H090 (1) | |
Text
'
Ctad NOV 0 41985 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT: REPORT NOS.:
50-324/85-27 AND 50-325/85-27 Thank you for your response of October 23, 1985, to our 'lotice of Violation issued on September 23, 1985, concerning activities conducted at your Brunswick facility. We have evaluated your response and found that it meets the require-ments of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely,
~ORfGfNA[ 3,@g g DAVID M. VERRE
- Roger D. Walker,l.uDirector
Division of Reactor Projects cc: vf. W. Howe, Vice President Brunswick Nuclear Project A. R. Dietz, Plant General Manager bec:.RRC Resident Inspector Document Control Desk State'of North Carolina
)l-W RI T
RII RII ($
k
'T.
(
Mellen:cdg fcR[yFredrickson DVerr lli W/ 4 /85 Wf 4 /85 fj/ /85 II u
8511130428 851104 PDR ADOCM 05000324 G
pg 3-E01
-