Informs of Listed Organizational Changes.Request for Amend to Tech Specs to Reflect Changes Will Be Submitted in Near Future
ML20136E758
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/23/1985
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
0348Y, 348Y, SL-7, TAC-60982, TAC-60983, NUDOCS 8601070118
Download: ML20136E758 (2)


Text

g . ; j Georgia Power Company

, - 333 Piedmont Avenue At:anta, Georgia 30308 Telephone 404 5264526 Maing Address:

Post Ofhce Bx 4545 Atlanta, Georg'a 30302 Georgia Power L. T. Gucwa the sourhem electoc system Manager Nuclear Engineering and Chiel Nuclear Engineer SL-7 0348y December 23, 1985 Director of Nuclear Reactor Regulation Attention: Mr. D. Fuller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S, Nuclear Regulatory Commission Washington, D. C. 20555 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 NOTIFICATION OF ORGANIZATIONAL CHANGE Gentlemen:

In accordance with the requirements of the Environmental Technical Specifications for Plant Hatch, Georgia Power Company hereby provides notification of organizational changes which will require changes to the Technical Specifications. The former Vice President and General Manager -

Quality Assurance has been named Vice President, Project Engineering for the Vogtle Project. The former Deputy General Manager - Quality Assurance has been named General Manager, Corporate Quality Assurance. This position will report to the Executive Vice President, Power Supply. The title and position of Deputy General Manager, Quality Assurance have been eliminated.

The General Manager, Corporate Quality Assurance assumes all duties formerly performed by the Vice President and General Manager - Quality Assurance.

The former Vice President, Engineering and Construction Services has been named Vice' President, Project Construction for the Vogtle Project. His former duties have been assumed by the Manager of Engineering and Construction Services.

A request for an Amendment to the Technical Specifications which reflects the above changes to the Georgia Power Company organization will be submitted in the near future.

kdk' E" ('2^")

B601070118 851223 PDR ADOCK 05000321 0 ss(s"arNAnn H PDR g ass (Actrsci (qv I FOR (VASSALLO)

AD - C. LArNAS (Ltr only)

,4 Georgia Power A - '

Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors' Branch No. 4 December 23, 1985 Page Two If you.have any further questions, please contact this office.

Very truly yours, f 41_<

L. T. Gucwa MJBlackwood/lc c: 'H. C. Nix, Jr.