Forwards Request for Addl Info Clarifying 860516 Request to Revise Tech Specs Re Administration of Safety Review & Plant Review Boards.Info Should Be Provided as Rev or Suppl to Proposed Tech Spec Change,Within 60 Days
ML20210N532
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/29/1986
From: Rivenbark G
Office of Nuclear Reactor Regulation
To: Beckham J
GEORGIA POWER CO.
References
TAC-61637, TAC-61638, NUDOCS 8610060537
Download: ML20210N532 (3)


Text

p[ - - }

September 29, 1986 Dockets'Nos. 50-321/366 Mr. J. T. Beckham, Jr.

Vice President, Nuclear Generation Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302

Dear Mr. Beckham:

We are reviewing your May 16, 1986 request to revise the Hatch Unit I and 2 Technical Specifications concerning the administration of the Safety Review Board and the Plant Review Board.

In order to complete this review, we need the additional information described in the enclosure. You are requested to provide a written response, submitting the requested information, within 60 days of receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, p.b a ,w ei bw George Rivenbark, Project Manager BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

Request for Additional Information cc: See next page DISTRIBUTION T0ocketfileQi NRC PDR Local PDR PD#2 Plant File URivenbark UGC - Bethesda tJordan BGrimes JParticw NThompson SNorris ACRS (10) 0FFICIALRECORDC0gf N UBL:PDf2 DBL d2#2 DB1; 2 St GR1W nbark:cb CDif e ,

9/s2786 9/f/86 _ 9/q/86 8610060537 860929 PDR ADOCK 05000321 P PDR

. u.

Mr. J. T. Beckham, Jr. Edwin I. Hatch Nuclear Piant, Georgia Power Company Units Nos. I and 2 cc:

Bruce W. Chruchill, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.

Washington, D.C. 20037 Mr. L. T. Gucwa Engineering Dep&rtment Gecrgia Power Company Post Office Box 4545 Atlanta, Georgia 30302 Mr. H. C. Nix, Jr. , General Manager Edwin I. Hatch Nuclear Plant Georgia Power Company Post Office Box 442 Baxley, Georgia 31513 Mr. Louis B. Long Southern Company Services, Inc. -

Post Office Box 2625 Birmingham, Alabama 35202 Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Post Office Box 279 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Commission, 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Commissioner Department of Natural Resources 270 Washington Street, N.W.

Atlanta, Georgia 30334 -

Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513

Enclosure REQUEST FOR ADDITIONAL INFORMATION RELATING TO A PROPOSED TECHNICAL SPECIFICATION CHANGE GEORGIA POWER COMPANY EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET N05. 50-321 AND 50-366 By letter dated May 16, 1986, Georgia Power Company requested a revision to

~

the Technical Specifications (TS) for Hatch Nuclear Plant, Units 1 and 2 concerning the administration of the Safety Review Board (SRB) and the Plant ReviewBoard(PRB). In order that the staff can complete the evaluation of this proposed change additional information is necessary. The information should be provided as a revision or supplement to the proposed TS change.

The exact intent of Section 6.5.1.2 of the TS, as proposed, is unclear to the staff. We have evaluated and agree with the need to improve the flexibility of the membership for the PRB; however, the wording of Section 6.5.1.2 should be clearly understandable and interpretable. In particular, we request that the following areas be clarified:

1. The staff agrees with the deletion of the requirement for the Plant Hatch General Manager and the Deputy General Manager to serve on the PRB.

However, the Chairman and alternate Chairman of the PRB should be filled by individuals at the Superintendent or Manager level and the functional titles of the positions should be designated in the TS. The Chairman of the PRB should be at a sufficiently high level of management to deal effectively with PRB members who could be managers or supervisors.

2. We don't understand why it is necessary to add the words "or equally

- qualified individual" in Section 6.5.1.2 of the TS. As indicated in Enclosure 1 of the submittal, " Basis for Change Request," the intent is that only supervisory level personnel would serve as permanent PRB members.

3. We believe it was the intent of Section 6.5.1.2 that there should be a representative on the PRB from each of the departments listed in the TS.

The revision should be clarified to denote this.

.