ML20012A905

From kanterella
Jump to navigation Jump to search
Forwards Summary Rept of Present Level & Source of Onsite Property Damage Insurance Coverage for Plant
ML20012A905
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/27/1990
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HL-989, NUDOCS 9003120770
Download: ML20012A905 (3)


Text

A q_d b

, GeorDra Powr Company 4 -

333 hedmont Avenue Attanta, Georgia 30308 Telephone 404 520 3195

. - Mashng Address' a

40 invemess Center Parkway

~

. Post Ofice 00x 1295 Bemingham. Alabarna 35201 lelephone POL BGB-5581 -

the southavn ekttre system W. o. Hairston, Ib

. Senior Vce Presidertt

' Nuclear OperaSons "

HL-989 000297

. February 27, 1990._

U.S. Nuclear _ Regulatory. Commission ATTN: Document Control Desk Washington, D.C. -20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366-OPERATING LICENSES DPR-57, NPF-5 PROPERTY DAMAGE INSURANCE LE'/ELS Gentlemen:

- In accordance with'the requirements of-10 CFR 50.54(w)(2),. attached is

- a. summary report of the present level and source of on site pro)erty damage-insurance-coverage for the E. I. Hatch Nuclear Pl ant. ' T1e level of coverage maintained is in excess;of that required by 10 CFR-50.54(w)(1).

' Should you have questions in this regard, please contact this office at -

.any time.

Sincerely, W.J. @ C W. G. Hairston, III SJB/eb.'

Enclosure:

c: '(See-next page.)

(0k 0

9003120770 900227 PDR ADOCK 05000321 I k

'J,.

. PDC 4

..o t,

LGeorgia Powerd U.S. Nuclear Regulatory Comission February 27, 1990 i

Page Two c:

Georaia Power Company Mr. H. C. Nix, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch GO-NORMS U.S. Nuclear Reaulatory Comission. Washinaton. D.C.

Mr. L. P. Crocker, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Comission. Reaion II Mr. S. D. Ebneter, Regional Administrator Mr. J. E. Menning, Senior Resident Inspector - Hatch 000297

d

, s.. b i

s 4

7 F

~

GEORGIA POWER CODFANY NUCLEAR PROPERTY INSURANCE COVERAGES AS OF APRIL 1,1990 4

EDWIN.I. HATCH NUCLEAR PLANT-BAXLEY. GEORGIA' PROPERTY - ALL RISK (OPERATING FACILITY)

AMOUNT OF POLICY NO.

INSURING COMPANY INSURANCE E_XPIRES P90-023 Nuclear Mutual Ltd.

$500,000,000

- 04/01/91 e

X89-018 Nuclear Electric

$975,000,000 11/15/90-Insurance Ltd.

Excess.

$500,000,000 X90156R American Nuclear

$560,000,000 11/15/90 Insurers / Mutual

- Excess Atomic Energy

$500,000,000 Liability Underwriters CLW/hb/0642H 2/19/90 s

7

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ - ' - - - - - - - - ^ - - - - '- - - - ' - - - - -