Forwards Info for OLs DPR-5 & NPF-7 Re Financial Assurance Requirements for Decommissioning Nuclear Power Reactors,Per 10CFR50.75(f)(1).Dalton Utilities Is One of Licensed Owners of Ei Hatch,Units 1 & 2,owning 2.2% of Facility
ML20205H158
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/16/1999
From: Cope D
AFFILIATION NOT ASSIGNED
To: Hoyle J
NRC OFFICE OF THE SECRETARY (SECY)
Shared Package
ML20205H137 List:
References
NUDOCS 9904080085
Download: ML20205H158 (4)


Text

m DALTON UTILITIES

.0

( M3 1 March 16,1999 Water, Light d Sinkinc fund Comkion R O. Box 86 j DMEb,1000 307229169 Tel 706-27E P& ice pgw&;g8-330 Docket Nos. 50-321 50-366 ToH .m f Mr. John C. Hoyle, Secretary 0168499 U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudication's Staff Washington, D.C. 20555-0601 Edwin I. Hatch Nuclear Plant

" Financial Assurance Requirements for Decommissioning Nuclear Power Reactors"

- ffd.ER 50465 dated Scotember 22.1998)

.) I

Dear Ladies and Gentlemen:

As provided in'10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC, on a calendar year' basis, beginning on March 31,1999, and every 2 years thereafter, on the status ofits decommissioning funding for each reactor or part of reactor it owns.

The Water, Light and Sinking Fund Commission of the City of Dalton, operating as Dalton Utilities, hereby submits the information for operating licenses DPR-7 and NPF-5 as requested in accordance with 10 CFR 50.75(f)(1) for the Edwin I. Hatch Nuclear Plant.

It is recognized by. Dalton Utilities that Southem Nuclear Operating Company (Southern Nuclear) will be providing this information to the NRC along with the other Co-Owner submittals. Although Southern Nuclear holds the operating license, Dalton Utilities is one of the licensed o mers of Plant Hatch, units 1 & 2, owning 2.2% of the facility.

Based on the infornkation presented in enclosure one and its attachment, there is reasonable assurance that the Dalton Utilities ownership prorated amount of the NRC prescribed minimum will be available to decommission Plant Hatch units 1 & 2 on the current expiration'date of each unit's operating license as set forth in 10 CFR 50.75(c).

Should you have any questions concerning this matter, please call Tom Bundros @

(706) 281-1035. l Respectfully submitted, D 1 Cop -

President & CEO cc:

9904000085 990330 l PDR ADOCK 05000321 J I PDR j.

60cyoudbf

v U.S. Nuclear Regulatory Commission Page Two l

l cc: Southern Nuclear Onerating Comnany Mr. J.B. Beasley, Vice President - Vogtle Electric Generating Plant

)

l '. Il@ clear Regulatorv Commission Washington. DC Mr. D.H. Jaffe, Senior Project Manager - Vogtle UA Nuclear Regn1ntary Commission. Region II L Mr. L.A. Reyes, Regional Administrator l 1 Mr. J. Zeiler, Senior . Resident Inspector - Vogtle l

l l

l I

l lr

(. u  ;

Enclosure One Edwin I. Hatch Nuclear Plant The City of Dalton Ownership Percentage- 2.2%

10 CFR 50.75 (f)(1) Requirement Unit 1 Unit 2 1 The minimum decommissioning fund estimate, 57,329,000' $7,436,000' Pursuant to 10 CFR 50.75 (b) and (c) '

2 The amount accumulated at the end of the $8,665,880 $9,610,423 calendar year preceding the date of the report for items included in 10 CFR 50.75 (b) and (c).

3 A schedule of the annual amounts remaining to See Schedule in See Schedule in be collected; for items in 10 CFR 50.75 (b) and Attachment 1 Attachment 1 (c) 4 The assumptions used regarding: N/A N/A Rates of escalation in decommissioning cost yg9 y,,;9 Rates of Earnings on decommissiomng funds Rates of other factors used in funding projections N/A N/A 5 Any contracts upon which the licensee is relying N/A N/A pursuant to 10 CFR 50.75(e)(1)(ii)(c) 6 Any modifications to a licensee's current method N/A N/A providing financial assurance occuring since the last submitted report.

7 Any materiai c 1 to trust agreements N/A N/A 1 The NRC formulas in section 10CFR50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systenu and structures is not included in the NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to DOE are not included in the cost formulas.

2

.ntis number is based on NUREG-1307, Rev. 8 for the Burial factor and the December 1997 values for the Labor r.nd Energy factors. {

I i

)

>N> -

k O5m -

9 9 0 0 5 0 e

1 0 0 0

/ u 0, 0, 0, 3 l a 7 1 8 V 5 1 6 r 7, 2, 9, a 8 4 2 P 1 2 4 l

a m

s te e u 0 3 3 d n l 8 2 0 n I a 3, u d V 8, 4, 6

F n t 5 0 7 l

a a e 6 1 2,

l kr 6, 6, o a t

a 8 9 8 1

T m M $ $ $

t e

x E e fu 8 9 7 0

a 3 6 8 V 1, 6, o 7 3 0 n 7 1 9 0

iv r 5, 5, 8

r 8 9 1 a $ $ $

C 0 0 0 e 0 0 0 l

u 0, 0, 0, a 7 8 V 5 1

6 n r 6, 1

0, 6, o a 6 0 ic ) P 4

$ $ 1 s s d $

i sn n m d o u np F m e oAuu o "o u 4 3

5 6

9 C G,FgC 9 l _

n a 0, 7, V 7, i

dnutonnni eor99 k

in t 0 9 9 S e 2 5 7 _

F lai(oZ " kr 9, 0, 9, _

gds ss 9 1 l

a a 3 5

8 inf ieys

)

n M knymnomcu(r*a$ tn a

e it a i u _

SiCc ol aan l a

6 5

6 2 d e eBJ 8 4 V 3, 3, 7, n hDt a Tr o 3 8 1 t n ae n 0 3 4 m hf i

y 9, 0, 9 igoem lct s r

r a

3 5

8 L ue C r, Nv t

e i n _

a W

0 0 0 e 0 0 0 _

l u 0, 0, 0 a 0 0 0 V 0 0 0 r 1, 2, 3, .

a 4 8 2 P 1 1 3 d $ $ $

n u

F e

"o u 6 8 4 n l a 4 5 0 i

k V 8, 6, 5, in t 5 0 6 S e 4 5 9

" kr 7, 5, 2, l

a a 4 4

9 m M t

e x e E l u 2 3 5 a 8 8 6 V 7, 2, 0, a 3 5 9 n 7 7 4 vr i

6, 4, 1, r 4 4 9 a $ $ $

- C h

c a 1 2  :

H t in it la n t o

t n U U T l

a P