ML20056B301
| ML20056B301 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 08/20/1990 |
| From: | Hairston W GEORGIA POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20056B302 | List: |
| References | |
| GL-89-04, GL-89-4, HI-1236, NUDOCS 9008280100 | |
| Download: ML20056B301 (2) | |
Text
,
q
_ Georg a Power Company js _
- 333 Piedmont Avenue Ananta, Georgia 30308
' ; Telephone 404 526 3195 '
Maing Address:
Pos!
.e 1 95
' Bam;ngham. AMbama 35201 l
Telephone 205 868 5581 the soutnem noc s; ; tem W G. Hairston, m Senior Wco Presdent Nuclear Operat-ons
'HL-1236 000018 August'20, 1990
'U.S. Nuclear Regulatory Commission ATTN: Document Cutrol Desk Washington, D.C.
20555 i
PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5
-REVISED INSERVICE INSPECTION AND TESTING l
PROGRAM FOR PLANT HATCH Gentlemen:
)
On February 24, 1988, Georgia Power Company (GPC) submitted a revised Inservice Inspection and Testing (ISI/IST) Program for Plant Hatch Units 1 and 2.
-Since that submittal, GPC received a Safety Evaluation Report (SER), dated June 22, 1989, from the NRC addressing the ISI Program. Also, in a telephone conversation with the NRC staff on December 5, 1989, GPC received verbal feedback regarding the prcpased IST program.
Based on this discussion, -GPC hereby submits revisions to both the ISI and'IST programs.
The program document has been split into separate ISI and IST documents for convenience.
The ISI program has no significant changes but
'.aes update the relief request status based on the NRC SER. The IST program has been modified per your verbal comments and reviewed against Generic Letter 89-04, " Guidance on Developing Acceptable Inservice Testing Programs."-
Georgia Power Company requests the NRC review and approve the IST program for Plant Hatch. However, as discussed with the staff, GPC intends to implement the program while awaiting the SER.
Our schedule calls for IST-related surveillances performed after. January 1,
- 1991, to be in conformance with the revised program by the end of 1990. An exception may be taken for procedures requiring validation during cold shutdown (conditions permitting) or during the Spring 1991 Unit 2 outage or the Fall 1991 Unit 1 outage.
Five copies of both the ISI and IST documents are provided.
9008280100 900920 gDR ADOCK 05000321 s 6 gp pdc 0
6 L
1
e 4;
_}'-
.s U.S. Nuclear Regulatory Commission August 20,'1990 Page Two
.t i
If you have any questions regarding this matter,'please contact this office at any time.
i Sincerely, i
(0 h
W. G. Hairston, III GKM/lb
Enclosures:
1.
Inservice Inspection Program Second 10-Year Interval
- E.I. Hatch Nuclear Plant Units 1 and 2.
- 2. - Inservice Testing Program Second 10-Year Interval -
E.I. Hatch Nuclear Plant Units 1 and 2.
c:
Georaia Power Company (w/o)
Mr. H.- C. Nix, General Manager - Nuclear Plant Mr. J. D. Heidt, Manager Engineering and Licensing - Hatch NORMS U.S. Nuclear Reaulatory Commission. Washinaton. D.C.
Mr. L. P. Crocker, Licensing Project Manager - Hatch U.S. Nuclear Reaulatory Commission. Reaion II (w/o) l Mr. S. D. Ebneter, Regional Administrator l
Senior Resident Inspector - Hatch l-000910 L
l