Proposed Tech Spec,Changing Section 6.6.1.b to Read: Each Reportable Occurrence Requiring Notification..
ML20214P068
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/25/1986
From:
GEORGIA POWER CO.
To:
Shared Package
ML20214P030 List:
References
TAC-60982, TAC-60983, TAC-61637, TAC-61638, NUDOCS 8609170249
Download: ML20214P068 (2)


Text

- -

. ADMINISTRATIVE CONTROLS

k. The Radiological Environmental Monitoring Program and the results thereof annually.
1. The ODCM, PCP, and implementing procedures biennially.

AUTHORITY 6.5.2.9 The SRB shall report to and advise the Executive Vice President -

Power Supply on those areas-of responsibility specified in Section 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2.10 Records of SRB activities'shall be prepared, approved and distributed as indicated.below:

a. Minutes of each SRB meeting shall be prepared, approved and forwarded to the Executive Vice President-Power Supply within 14 days following each meeting.
b. Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and forwarded to the Executive Vice President-Power Supply within 14 days following completion of the review.

i i c. Audit reports encompassed by Section 6.5.2.8 above, shall be

forwarded to the Executive Vice President-Power Supply and to the management positions responsible for the areas audited within 30 l

days after completion of the audit.

6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for REPORTABLE OCCURRENCES:

a. The Commission shall be notified and/or a report submitted pursuant I to the requirements of Specification 6.9.
b. Each REPORTABLE OCCURRENCE requiring notification to the Comission shall be reviewed by the PRB and submitted to the SRB i

and the Vice President and General Manager Nuclear Operations. l l

6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is

violated:
a. The unit shall be placed in at least HOT SHUTDOWN within two hours.

! b. The Safety Limit violation shall be reported to the Commission, the l Vice President and General Manager Nuclear Operations and to the SRB [

within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

l HATrH I!WTT 1 6-12 B609170249 860827 PDR ADOCK 05000321 P PDR

- . _ - - . . . ~ _ . - . - . - - . . - . - , _ . - - - .-

ADMINISTRATIVE CONTROLS

k. The Radiological Environmental Monitoring Program and the results-thereof annually.
1. The ODCM, PCP, and implementing procedures biennially.

AUTHORITY 6.5.2.9 The SRB shall report to and advise the Executive Vice President -

Power Supply on those creas of responsibility specified in Section 6.5.2.7 and 6.5.2.8.

I RECORDS 6.5.2.10 Records of SRB activities shall be prepared, approved a.nd distributed as indicated below:

4

a. Minutes of each SR8 meeting shall be prepared, approved and fomarded to the Executive Vice President-Power Supply within 14 days following each meeting.
b. Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and fomarded to the Executive Vice President-Power Supply within 14 days following completion of the review.
c. Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Executive Vice President-Power Supply and to the

!. management positions responsible for the areas audited within 30 i

days after completion of the audit.

6.6 REPORTABLE OCCURRENCE ACTION

6.6.1 The following actions shall be taken for REPORTABLE OCCURRENCES

i a. The Commission shall be notified and/or a report submitted pursuant i to the requirements of Specification 6.9.

I

b. Each REPORTABLE OCCURRENCE requiring notification to the Comission shall be reviewed by the PRB and submitted to the SRB and the Vice President and General Manager Nuclear Operations. l 6.7 SAFETY LIMIT VIOLATION l 6.7.1 The following actions shall be taken in the event a Safety Limit is g

violated:

a. The unit shall be placed in at least HOT SHUTDOWN within two hours, i

i b. The Safety Limit violation shall be rt. ported to the Commission, the Vice President and General Manager Nuclear Operations and to the SRB l within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

HATCH - UNIT 2 6-11