MONTHYEARML20108E8031985-03-0404 March 1985 Notifies of Organizational Changes.Position of Senior Vice President - Nuclear Power Created.Application for Amend to Licenses DPR-57 & NPF-5 Will Be Submitted in Near Future Project stage: Request ML20136E7581985-12-23023 December 1985 Informs of Listed Organizational Changes.Request for Amend to Tech Specs to Reflect Changes Will Be Submitted in Near Future Project stage: Request ML20153E9071986-02-17017 February 1986 Proposed Tech Spec Changes,Modifying Offsite Organization & Responsibilities of Plant Review Board,Reflecting Addition of Primary Meteorological Tower & Clarifying Retention Period for QA Documents Project stage: Other ML20153E8991986-02-17017 February 1986 Application for Amends to Licenses DPR-57 & NPF-5,modifying Offsite Organization & Responsibilities of Plant Review Board,Adding Primary Meteorological Tower & Clarifying QA Documents Retention Period.Fee Paid Project stage: Request ML20198D9731986-05-16016 May 1986 Proposed Tech Specs,Revising Administration of Plant & Safety Review Boards Project stage: Other ML20198D9611986-05-16016 May 1986 Application for Amend to Licenses DPR-57 & NPF-5,revising Tech Specs to Change Administrative Controls Covering Organization & Responsibilities of Plant & Safety Review Boards.Fee Paid Project stage: Request ML20214P0681986-08-25025 August 1986 Proposed Tech Spec,Changing Section 6.6.1.b to Read: Each Reportable Occurrence Requiring Notification.. Project stage: Other ML20214P0261986-08-27027 August 1986 Application for Amends to Licenses DPR-57 & NPF-5,revising Tech Spec Section 6.6.1.b to Read: Each Reportable Occurrence Requiring Notification.. Project stage: Request 05000366/LER-1986-021-01, :on 860828,reactor Protection Sys Motor Generator Set C Cabinet Output Breaker Tripped,Causing Loss of Power to Bus A.Caused by Failed Limit Switch Assembly. Limit Switch Assembly & Torque Switch Replaced1986-09-29029 September 1986
- on 860828,reactor Protection Sys Motor Generator Set C Cabinet Output Breaker Tripped,Causing Loss of Power to Bus A.Caused by Failed Limit Switch Assembly. Limit Switch Assembly & Torque Switch Replaced
Project stage: Request ML20210N5321986-09-29029 September 1986 Forwards Request for Addl Info Clarifying 860516 Request to Revise Tech Specs Re Administration of Safety Review & Plant Review Boards.Info Should Be Provided as Rev or Suppl to Proposed Tech Spec Change,Within 60 Days Project stage: RAI ML20213D5431986-10-27027 October 1986 Proposed Tech Specs,Revising Section 6.0 Re Adminstrative Controls & ETS Section 5 to Reflect Recent Changes in Company Organization Project stage: Other ML20213D5161986-10-27027 October 1986 Application for Amends to Licenses DPR-57 & NPF-5,revising Administrative Controls Section 6.0 & ETS Section 5 to Reflect Recent Changes in Company Organization.Fee Paid Project stage: Request ML20214T0931986-11-24024 November 1986 Revised Proposed Tech Spec 6.5.1.2,Pages 6-6 for Unit 1 & Page 6-5 for Unit 2,adding Addl Requirement for Two Persons to Be at Least Dept Managers Project stage: Other ML20214S7631986-11-24024 November 1986 Resubmits Tech Spec Pages Re Administration of Plant Review Board & Safety Review Board,Per NRC 860929 Request.Pages Revised to Add Addl Restriction Requiring Two Persons to Be at Least Dept Managers Project stage: Other ML20237F9731987-08-10010 August 1987 Amends 145 & 80 to Licenses DPR-57 & NPF-5,respectively, Modifying Tech Specs to Reflect Organization Changes Project stage: Other ML20237F9921987-08-10010 August 1987 Safety Evaluation Supporting Amends 145 & 80 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval ML20236M7741987-11-0606 November 1987 Errata to Amends 144 & 145 to License DPR-57 & Amend 80 to License NPF-5,revising Tech Spec Pages Project stage: Other 1986-05-16
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
I Georgia Power Company 333 Pedmont Avenue Atlanta Georgia 30308
. Telephone 404 52665?6 Mahng Address:
Post Office Box 4545 Atlanta, Georgia 30302 Georgia Power L T. Gucwa the southern electic system Manager Nuclear Engin(ering NED-85-122 and Chief Nuclear Engineer 034By March 4, 1985 Director of N2 clear Reactor Regulation Attention:.. Mr. John F. - Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. M2 clear Reg 21atory Conunission Washington, D. C.
20555 NRC D001TS 50-321, 50-366 OPERATING LIGNSES DPR-57, NPF-5 EDWIN I. HA'ICH NUCIEAR PLAN 1' UNITS 1, 2 NCH'IFICATION OF ORGANIZATIONAL OIANGE Gentlemen:
In accordance with the restirements of the Environmental Technical Specifications for Plant Hatch, Georgia Power Conpany hereby provides notification of organizational changes which will reglire changes to the Technical Specifications.
%e title and position of the Senior. Vice President - M2 clear Operations has been created.
Wis position will report to the Senior Vice President - M2 clear Power.
Reporting to the new Senior Vice President will be the Vice President and General Manager - Maclear Operations.
A reglest for an Amendment to the 'Dichnical Specifications which reflects the above change to the Georgia Power Conpany organization will be '
albnitted in the near future.
If you have any furthe'r canestions, please contact this office.
Very truly yours,
/ X f -= 3 L. T. G1 cwa ICB xc:
H. C. Nix, Jr.
J. Nelson Grace (NRC-_ Region II)
Senior _ Resident Inspector 31g{ %