Letter Sequence Request |
|---|
|
|
MONTHYEARML20108E8031985-03-0404 March 1985 Notifies of Organizational Changes.Position of Senior Vice President - Nuclear Power Created.Application for Amend to Licenses DPR-57 & NPF-5 Will Be Submitted in Near Future Project stage: Request ML20136E7581985-12-23023 December 1985 Informs of Listed Organizational Changes.Request for Amend to Tech Specs to Reflect Changes Will Be Submitted in Near Future Project stage: Request ML20153E9071986-02-17017 February 1986 Proposed Tech Spec Changes,Modifying Offsite Organization & Responsibilities of Plant Review Board,Reflecting Addition of Primary Meteorological Tower & Clarifying Retention Period for QA Documents Project stage: Other ML20153E8991986-02-17017 February 1986 Application for Amends to Licenses DPR-57 & NPF-5,modifying Offsite Organization & Responsibilities of Plant Review Board,Adding Primary Meteorological Tower & Clarifying QA Documents Retention Period.Fee Paid Project stage: Request ML20198D9731986-05-16016 May 1986 Proposed Tech Specs,Revising Administration of Plant & Safety Review Boards Project stage: Other ML20198D9611986-05-16016 May 1986 Application for Amend to Licenses DPR-57 & NPF-5,revising Tech Specs to Change Administrative Controls Covering Organization & Responsibilities of Plant & Safety Review Boards.Fee Paid Project stage: Request ML20214P0681986-08-25025 August 1986 Proposed Tech Spec,Changing Section 6.6.1.b to Read: Each Reportable Occurrence Requiring Notification.. Project stage: Other ML20214P0261986-08-27027 August 1986 Application for Amends to Licenses DPR-57 & NPF-5,revising Tech Spec Section 6.6.1.b to Read: Each Reportable Occurrence Requiring Notification.. Project stage: Request 05000366/LER-1986-021-01, :on 860828,reactor Protection Sys Motor Generator Set C Cabinet Output Breaker Tripped,Causing Loss of Power to Bus A.Caused by Failed Limit Switch Assembly. Limit Switch Assembly & Torque Switch Replaced1986-09-29029 September 1986
- on 860828,reactor Protection Sys Motor Generator Set C Cabinet Output Breaker Tripped,Causing Loss of Power to Bus A.Caused by Failed Limit Switch Assembly. Limit Switch Assembly & Torque Switch Replaced
Project stage: Request ML20210N5321986-09-29029 September 1986 Forwards Request for Addl Info Clarifying 860516 Request to Revise Tech Specs Re Administration of Safety Review & Plant Review Boards.Info Should Be Provided as Rev or Suppl to Proposed Tech Spec Change,Within 60 Days Project stage: RAI ML20213D5431986-10-27027 October 1986 Proposed Tech Specs,Revising Section 6.0 Re Adminstrative Controls & ETS Section 5 to Reflect Recent Changes in Company Organization Project stage: Other ML20213D5161986-10-27027 October 1986 Application for Amends to Licenses DPR-57 & NPF-5,revising Administrative Controls Section 6.0 & ETS Section 5 to Reflect Recent Changes in Company Organization.Fee Paid Project stage: Request ML20214T0931986-11-24024 November 1986 Revised Proposed Tech Spec 6.5.1.2,Pages 6-6 for Unit 1 & Page 6-5 for Unit 2,adding Addl Requirement for Two Persons to Be at Least Dept Managers Project stage: Other ML20214S7631986-11-24024 November 1986 Resubmits Tech Spec Pages Re Administration of Plant Review Board & Safety Review Board,Per NRC 860929 Request.Pages Revised to Add Addl Restriction Requiring Two Persons to Be at Least Dept Managers Project stage: Other ML20237F9731987-08-10010 August 1987 Amends 145 & 80 to Licenses DPR-57 & NPF-5,respectively, Modifying Tech Specs to Reflect Organization Changes Project stage: Other ML20237F9921987-08-10010 August 1987 Safety Evaluation Supporting Amends 145 & 80 to Licenses DPR-57 & NPF-5,respectively Project stage: Approval ML20236M7741987-11-0606 November 1987 Errata to Amends 144 & 145 to License DPR-57 & Amend 80 to License NPF-5,revising Tech Spec Pages Project stage: Other 1986-05-16
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
g. ; j Georgia Power Company
- 333 Piedmont Avenue At:anta, Georgia 30308 Telephone 404 5264526 Maing Address:
Post Ofhce Bx 4545 Atlanta, Georg'a 30302 Georgia Power L. T. Gucwa the sourhem electoc system Manager Nuclear Engineering and Chiel Nuclear Engineer SL-7 0348y December 23, 1985 Director of Nuclear Reactor Regulation Attention: Mr. D. Fuller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U. S, Nuclear Regulatory Commission Washington, D. C.
20555 NRC 00CKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 NOTIFICATION OF ORGANIZATIONAL CHANGE Gentlemen:
In accordance with the requirements of the Environmental Technical Specifications for Plant Hatch, Georgia Power Company hereby provides notification of organizational changes which will require changes to the Technical Specifications.
The former Vice President and General Manager -
Quality Assurance has been named Vice President, Project Engineering for the Vogtle Project.
The former Deputy General Manager - Quality Assurance has been named General Manager, Corporate Quality Assurance. This position will report to the Executive Vice President, Power Supply.
The title and position of Deputy General Manager, Quality Assurance have been eliminated.
The General Manager, Corporate Quality Assurance assumes all duties formerly performed by the Vice President and General Manager - Quality Assurance.
The former Vice President, Engineering and Construction Services has been named Vice' President, Project Construction for the Vogtle Project.
His former duties have been assumed by the Manager of Engineering and Construction Services.
A request for an Amendment to the Technical Specifications which reflects the above changes to the Georgia Power Company organization will be submitted in the near future.
kdk' E" ('2^")
B601070118 851223 PDR ADOCK 05000321 ss(s"arNAnn 0
H PDR (q I g ass (Actrsci v
FOR (VASSALLO)
AD - C. LArNAS (Ltr only)
,4 Georgia Power A -
- Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors' Branch No. 4 December 23, 1985 Page Two If you.have any further questions, please contact this office.
Very truly yours, f 41_<
L. T. Gucwa MJBlackwood/lc c:
'H. C. Nix, Jr.
J. Nelson Grace-(NRC-Region II)
Senior Resident Inspector GO-NORMS 700775..
b..