{{Adams
| number = ML20137V740
| issue date = 09/25/1985
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/85-24 & 50-328/85-24.Addl Info Re Ice Removal & Surveillance Testing Requested Per 850913 Telcon
| author name = Walker R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name = Parris H
| addressee affiliation = TENNESSEE VALLEY AUTHORITY
| docket = 05000327, 05000328
| license number =
| contact person =
| document report number = NUDOCS 8510040118
| title reference date = 09-06-1985
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
}}
See also: [[see also::IR 05000327/1985024]]
 
=Text=
{{#Wiki_filter:1
  ,
.
                                                                                [/
                                            September 25, 1985
    Tennessee Valley Authority
  / ATTN: Mr. H. G. Parris
              Manager of Power and
                Engineering (Nuclear)
    6N11 B Missionary Ridge Place
    1101 Market Street
    Chattanooga, TN 37402-2801
    Gentlemen:
    SUBJECT: REPORT NOS. 50-327/85-24 AND 50-328/85-24
    Thank you for your response of September 6,1985, to our Notice of Violation
    issued on August 7,1985, concerning activities conducted at your Sequoyah
    facility. We have evaluated your response to Violation 50-328/85-24-02 and found
    that it meets the requirements of 10 CFR 2.201. We will examine the implemen-
    tation of your corrective actions during future inspections.
    Regarding your response to Violation 50-328/85-24-03, you state that the ice
    buildup on June 10, 1985, was removed the same day and that a surveillance
    instruction was performed to document that the intermediate deck doors were free
    of ice. Our evaluation indicates that Maintenance Request A-553690 was generated
    on June 10, 1985, to control the repair of insulation tape and removal of ice
    and/or moisture buildup. It is our understanding that the maintenance request
    documented completion of these activities on June 16, 1985. Since your response
    indicates that ice removal and surveillance testing occurred within 48 hours of
    finding the June 10, 1985 ice buildup, please provide in a supplemental response
    specific explanation and documentation to justify your position that the
    requirements of the limiting condition of operation of Technical Specification
    3.6.5.3 were met. This request was discussed during a telephone call between
    Mr. P. Wallace of your staff and Mr. S. Weise and Mr. B. Debs of the Region 11
    staff on September 13, 1985.
    We appreciate your cooperation in this matter.
                                                Sincerely.
                                                Original Signed by
                                                Roger D. Walker
                                                Roger D. Walker, Director
                                                Division of Reactor Projects
    cc:    (See page 2)
              h
              G
                      D          [
                                                                                  i
                                                                                  I* % Sol
 
. .
    Tennessee Valley Authority              2            Septenter 25, 1985
    cc: 4. L. Abercrombie, Sequoyah Nuclear
          , Plant Site Director
        "P. R. Wallace, Plant Manager
        vt. W. Whitt, Chief, Nuclear Safety
            , Staff
        4. L. Williams, Jr., Supervisor
            , Licensing Section
        4. B. Kirk, Compliance Staff
              Supervisor
        v1. E. Wills, Project Engineer
    bec: #NRC Resident Inspector
            Document Control Desk
            State of Tennessee
    RII                  R    [      Ril      R          RI
    BDebs:pph              CJul an      A    o  Sweise      DVerr 111
    09/ft/85              09//l/85    09//') 85 09/p/85    09/; 85
                                                                      .
}}

Latest revision as of 07:14, 13 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-327/85-24 & 50-328/85-24.Addl Info Re Ice Removal & Surveillance Testing Requested Per 850913 Telcon
ML20137V740
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/25/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8510040118
Download: ML20137V740 (2)


See also: IR 05000327/1985024

Text

1

,

.

[/

September 25, 1985

Tennessee Valley Authority

/ ATTN: Mr. H. G. Parris

Manager of Power and

Engineering (Nuclear)

6N11 B Missionary Ridge Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

SUBJECT: REPORT NOS. 50-327/85-24 AND 50-328/85-24

Thank you for your response of September 6,1985, to our Notice of Violation

issued on August 7,1985, concerning activities conducted at your Sequoyah

facility. We have evaluated your response to Violation 50-328/85-24-02 and found

that it meets the requirements of 10 CFR 2.201. We will examine the implemen-

tation of your corrective actions during future inspections.

Regarding your response to Violation 50-328/85-24-03, you state that the ice

buildup on June 10, 1985, was removed the same day and that a surveillance

instruction was performed to document that the intermediate deck doors were free

of ice. Our evaluation indicates that Maintenance Request A-553690 was generated

on June 10, 1985, to control the repair of insulation tape and removal of ice

and/or moisture buildup. It is our understanding that the maintenance request

documented completion of these activities on June 16, 1985. Since your response

indicates that ice removal and surveillance testing occurred within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> of

finding the June 10, 1985 ice buildup, please provide in a supplemental response

specific explanation and documentation to justify your position that the

requirements of the limiting condition of operation of Technical Specification 3.6.5.3 were met. This request was discussed during a telephone call between

Mr. P. Wallace of your staff and Mr. S. Weise and Mr. B. Debs of the Region 11

staff on September 13, 1985.

We appreciate your cooperation in this matter.

Sincerely.

Original Signed by

Roger D. Walker

Roger D. Walker, Director

Division of Reactor Projects

cc: (See page 2)

h

G

D [

i

I* % Sol

. .

Tennessee Valley Authority 2 Septenter 25, 1985

cc: 4. L. Abercrombie, Sequoyah Nuclear

, Plant Site Director

"P. R. Wallace, Plant Manager

vt. W. Whitt, Chief, Nuclear Safety

, Staff

4. L. Williams, Jr., Supervisor

, Licensing Section

4. B. Kirk, Compliance Staff

Supervisor

v1. E. Wills, Project Engineer