ML20214U162: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IA-86-699, Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR]]
{{Adams
| number = ML20214U162
| issue date = 12/03/1986
| title = Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR
| author name = Grimsley D
| author affiliation = NRC OFFICE OF ADMINISTRATION (ADM)
| addressee name = Dickey D
| addressee affiliation = CALIFORNIA, STATE OF
| docket = 05000000, 05000275, 05000323, 05000338, 05000339
| license number =
| contact person =
| case reference number = FOIA-86-699
| document report number = NUDOCS 8612090164
| package number = ML20214U164
| document type = CORRESPONDENCE-LETTERS, NRC TO STATE/LOCAL GOVERNMENT, OUTGOING CORRESPONDENCE
| page count = 5
}}
 
=Text=
{{#Wiki_filter:ete:                                                                                      o f
Y +f      'o,,                            UNITED STATES 8            n              NUCLEAR REGULATORY COMMISSION h          e $                        WASHING TON, D. C. 20555                        -
    -...../
DEC 8      3 06 Dorothy F. Dickey, Staff Counsel California State Building                      IN RESPONSE REFER San Francisco, CA 94102                        TO F01A-86-699
 
==Dear Ms. Dickey:==
 
This is in res                                            15, 1986, to the Department of Justice (D0J) in ponse whichtoyou your  letter dated requested,        April to the Freedom of Information pursuant Act (F0IA), records related to the D0J's investigation of Pacific Gas ano Electric's role in siting, licensing, and constructing the Diablo Canyon nuclear power plant.
Copies of the records referred to this agency for review are identified on the enclosed Appendixes A and B. The records are available for public inspection and copying at the NRC's Public Document Room (PDR) in Washington, DC. We are enclosing a notice that provides information on charges and procedures for obtaining copies of records from the PDR.
Sincerely, w      W        z- f Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
 
==Enclosures:==
As stated 0
8612070164 861203 PDR    FOIA          PDR DICKEY 86-699
 
Re:  F01A-86-699 Appendix A Records Maintained In PDR Folder F01A-83-130:
: 1. 6/7/78  Letter to B. Whitman, D0J, from T. McTiernan, NRC, re AEC/USGS meeting regarding the Hosgri Fault (1 page) garding an PDR Accession No. 8309070443
: 2. 5/25/78 Memo to T. McTiernan from E. Case, "Results of Staff Interviews Regarding Diablo Canyon Review Requested by Department of Justice," with enclosed list (3 pages)
PDR Accession No. 8105060015 Record Maintained in PDR Folder F01A-86-391:
:        3. 3/18/75 " Summary of ACRS Subcommittee Meeting Held on February 18-19, 1975" PDR Accession No. 8608250460/FOIA-86-391 l
l l
i i
I i
L l
l
 
Re:  F01A-86-699 Appendix B Records Maintained In PDR Folder F01A-86-699:
: 1. 10/14/77 Letter to J. Moorman, D0J, from B. Rushforth, Center for Law in the Public Interest, "Possible Prosecution of Pacific Gas and Electric Company for Failure to Disclose a Geological Fault (18 U.S.C. 51001), (3 pages) (Released by D0J) w/ stated enclosure:
(2)  " Testimony Before the Subcommittee on Energy and the Environment Regarding Diablo Canyon nuclear power plant, June 30, 1977 (Released by D0J), (7 pages) Attachments:
(3) Attachment 1 "Diabla Canyon Power Plant Meeting with AEC Staff on a Seismic Design March 21, 1967" (Note: Only pages 1 and 5 of this record are maintained among 00J files. Upon search of pertinent NRC files, we could not locate a complete copy of this record.)
Attachment 2 - (D0J will address this record)
Attachment 3 - (This record is identified at No. 3 on Appendix A)
(4) Attachment 4 - 2/11/75 Memorandum for A. Giambusso from R. DeYoung, "Diablo Canyon Review" (4 pages)
(5) Attachment 5 - 2/20/75 Note to A. Giambusso from R. DeYoung, "Diablo Canyon - Seismic Issues" (3 pages)
(6) Attachment 6 - 1/-/74 Memo to R. Boyd from R. DeYoung, "Diablo Canyon", w/ enclosure: "Diablo Canyon Geology -
Seismology" (5 pages)
(7) Attachment 7 - 1/12/76 "A Proposed Program for Diablo Canyon discussed at an internal staff meeting 1/12/76 (12 pages)
 
    .'                                      Y                            #
I3 public titilities sommission STATE OF C A LIF O R NI A April 15, 1986 Ann Shields, Chief Policy, Legislative and Special Litigation Department of Justice        s                    EREEDOM OF INFORMATION
    . 10th and Pensylvania Ave., N.W.                          eCI REQUEST a  ing on, D.C. 20530                                  M~Ib -6 9f
 
==Dear Ms. Shields:==
 
                                                                              ~
b The California Public Utilities Commission is et# ntly enga6ed in 007 a review of the costs incurred by Pacific Gas and Electric in constructing the Diablo Canyon Nuclear Power Plant. I am writing to request that you provide the following information under the Freedom of Information Act, 5 U.S.C. 5552:
          "All documents, data, studies, repcrts, analyses, audits, records, publications, decisions, letters, orders, photographs, drawings, agreements, contracts, notes, memoranda, and drafts compiled, used, reviewed or relied upon in the Department of Justice's investigation of Pacific Gas and Electric's role in siting, licensing and constructing the Diablo Canyon Nuclear Power Plant, including but not limited to those materials in DOJ file 90517601."
I have orally requested these materials by telephone from Kevin Gaynor. He indicated that I should contact you in writing in order to obtain them. If for any reason you are unable to comply promptly with any part of this request, please comply to the extent possible and indicate which item or items you are unable to promptly comply with. If you are unable to comply with any part of this request due to an alleged exclusion from the Freedom of Information Act, pleas"e identify the alleged exclusion, and the item to which the exclusion is alleged to apply. Please identify the item by providing, where applicable, its date, author, originator, general subject matter, title, present location, custodian and recipiants.
Thank you very much for your cooperation'. Please call me at (415) 557-9723 if you have any questions concerning this request.
en    ,
Very truly yours,      ** *          . . . ;.2 06922l
({ fdy        l            ll DorothyF.Dkkey                    '
Staff Counsel DFD:1z
                                                          .}}

Latest revision as of 11:09, 13 May 2021

Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR
ML20214U162
Person / Time
Site: North Anna, Diablo Canyon, 05000000
Issue date: 12/03/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Dickey D
CALIFORNIA, STATE OF
Shared Package
ML20214U164 List:
References
FOIA-86-699 NUDOCS 8612090164
Download: ML20214U162 (5)


Text

ete: o f

Y +f 'o,, UNITED STATES 8 n NUCLEAR REGULATORY COMMISSION h e $ WASHING TON, D. C. 20555 -

-...../

DEC 8 3 06 Dorothy F. Dickey, Staff Counsel California State Building IN RESPONSE REFER San Francisco, CA 94102 TO F01A-86-699

Dear Ms. Dickey:

This is in res 15, 1986, to the Department of Justice (D0J) in ponse whichtoyou your letter dated requested, April to the Freedom of Information pursuant Act (F0IA), records related to the D0J's investigation of Pacific Gas ano Electric's role in siting, licensing, and constructing the Diablo Canyon nuclear power plant.

Copies of the records referred to this agency for review are identified on the enclosed Appendixes A and B. The records are available for public inspection and copying at the NRC's Public Document Room (PDR) in Washington, DC. We are enclosing a notice that provides information on charges and procedures for obtaining copies of records from the PDR.

Sincerely, w W z- f Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 0

8612070164 861203 PDR FOIA PDR DICKEY 86-699

Re: F01A-86-699 Appendix A Records Maintained In PDR Folder F01A-83-130:

1. 6/7/78 Letter to B. Whitman, D0J, from T. McTiernan, NRC, re AEC/USGS meeting regarding the Hosgri Fault (1 page) garding an PDR Accession No. 8309070443
2. 5/25/78 Memo to T. McTiernan from E. Case, "Results of Staff Interviews Regarding Diablo Canyon Review Requested by Department of Justice," with enclosed list (3 pages)

PDR Accession No. 8105060015 Record Maintained in PDR Folder F01A-86-391:

3. 3/18/75 " Summary of ACRS Subcommittee Meeting Held on February 18-19, 1975" PDR Accession No. 8608250460/FOIA-86-391 l

l l

i i

I i

L l

l

Re: F01A-86-699 Appendix B Records Maintained In PDR Folder F01A-86-699:

1. 10/14/77 Letter to J. Moorman, D0J, from B. Rushforth, Center for Law in the Public Interest, "Possible Prosecution of Pacific Gas and Electric Company for Failure to Disclose a Geological Fault (18 U.S.C. 51001), (3 pages) (Released by D0J) w/ stated enclosure:

(2) " Testimony Before the Subcommittee on Energy and the Environment Regarding Diablo Canyon nuclear power plant, June 30, 1977 (Released by D0J), (7 pages) Attachments:

(3) Attachment 1 "Diabla Canyon Power Plant Meeting with AEC Staff on a Seismic Design March 21, 1967" (Note: Only pages 1 and 5 of this record are maintained among 00J files. Upon search of pertinent NRC files, we could not locate a complete copy of this record.)

Attachment 2 - (D0J will address this record)

Attachment 3 - (This record is identified at No. 3 on Appendix A)

(4) Attachment 4 - 2/11/75 Memorandum for A. Giambusso from R. DeYoung, "Diablo Canyon Review" (4 pages)

(5) Attachment 5 - 2/20/75 Note to A. Giambusso from R. DeYoung, "Diablo Canyon - Seismic Issues" (3 pages)

(6) Attachment 6 - 1/-/74 Memo to R. Boyd from R. DeYoung, "Diablo Canyon", w/ enclosure: "Diablo Canyon Geology -

Seismology" (5 pages)

(7) Attachment 7 - 1/12/76 "A Proposed Program for Diablo Canyon discussed at an internal staff meeting 1/12/76 (12 pages)

.' Y #

I3 public titilities sommission STATE OF C A LIF O R NI A April 15, 1986 Ann Shields, Chief Policy, Legislative and Special Litigation Department of Justice s EREEDOM OF INFORMATION

. 10th and Pensylvania Ave., N.W. eCI REQUEST a ing on, D.C. 20530 M~Ib -6 9f

Dear Ms. Shields:

~

b The California Public Utilities Commission is et# ntly enga6ed in 007 a review of the costs incurred by Pacific Gas and Electric in constructing the Diablo Canyon Nuclear Power Plant. I am writing to request that you provide the following information under the Freedom of Information Act, 5 U.S.C. 5552:

"All documents, data, studies, repcrts, analyses, audits, records, publications, decisions, letters, orders, photographs, drawings, agreements, contracts, notes, memoranda, and drafts compiled, used, reviewed or relied upon in the Department of Justice's investigation of Pacific Gas and Electric's role in siting, licensing and constructing the Diablo Canyon Nuclear Power Plant, including but not limited to those materials in DOJ file 90517601."

I have orally requested these materials by telephone from Kevin Gaynor. He indicated that I should contact you in writing in order to obtain them. If for any reason you are unable to comply promptly with any part of this request, please comply to the extent possible and indicate which item or items you are unable to promptly comply with. If you are unable to comply with any part of this request due to an alleged exclusion from the Freedom of Information Act, pleas"e identify the alleged exclusion, and the item to which the exclusion is alleged to apply. Please identify the item by providing, where applicable, its date, author, originator, general subject matter, title, present location, custodian and recipiants.

Thank you very much for your cooperation'. Please call me at (415) 557-9723 if you have any questions concerning this request.

en ,

Very truly yours, ** * . . . ;.2 06922l

({ fdy l ll DorothyF.Dkkey '

Staff Counsel DFD:1z

.