ML20206U815
ML20206U815 | |
Person / Time | |
---|---|
Site: | Cooper, Fort Calhoun, 05000000 |
Issue date: | 10/01/1986 |
From: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
To: | Wright G NEBRASKA, STATE OF |
Shared Package | |
ML20206U819 | List: |
References | |
NUDOCS 8610080396 | |
Download: ML20206U815 (2) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N1931999-10-22022 October 1999
[Table view]Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted LIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable 1999-09-08 Category:NRC TO STATE/LOCAL GOVERNMENT MONTHYEARML20206C0631988-11-0707 November 1988
[Table view]Responds to Re Enrichment of Naturally Occurring Radionuclides in Proposed Alchemie Facilities.Company Advised That Facilities Subj to State of Tn Regulations ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20154M5051988-09-22022 September 1988 Responds to Re Rev to Info on Applicability of 10CFR50 Applications for Enriching Stable Isotopes.Listed Observations Provided Based on Info in Ltr & 880914 Telcon ML20236V7341987-12-0101 December 1987 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C ML20195G6881987-11-0202 November 1987 Responds to to Chairman Zech Re Plant Restart W/O Effective Radiological Emergency Response Plan.Improvements Currently Underway,Based on 870806 FEMA Rept Listing Six Areas of Concern.Plant Will Not Start Until Issues Resolved ML20236B8491987-10-21021 October 1987 Forwards Nrc/State of Nc Environ Monitoring Appraisal on 871005-06.State Met All Obligations in 1986 Contract W/ Exceptions of H-3 Analyses in Surface Waters & I-131 Analyses in Milk,Both Required Lower Detection Limits ML20235S6281987-10-0101 October 1987 Responds to Supporting Request from Smud That Commission Hold Hearing in Sacramento,Ca Re Safety of B&W Nuclear Plants.Response to Concerns Will Be Addressed When Response to Ucs Petition Issued ML20151W0201987-09-0909 September 1987 Summarizes 870521 Meeting W/Massachsetts Officials Re Restart of Facility.Understands That Prior to Decision on Restart,Further Public Meetings Will Be Held ML20238B2991987-08-24024 August 1987 Responds to Expressing Concern That Mgt & Safety Problems Recently Identified at Facility Could Endanger Constituents.Nrc Ready to Take Appropriate Action If Performance Degrades to Levels Endangering Public ML20235G2511987-06-16016 June 1987 Discusses Manner NRC Used to Select Sample of safety-related Concerns in Safeteam Files for Review,Per 870528 Request. Safety Concerns Properly Addressed.Applicable Insp Repts & Related Info Encl ML20213G5001987-03-26026 March 1987 Submits Comments Re Legislation Proposing Placement of Nuclear Safety Inspector at Facility.Mou May Not Be Necessary Due to Precision & Detail of Legislation ML20237C9261987-03-17017 March 1987 Responds to Questions Raised at 870116 Meeting in Bethesda,Md Re Emergency Response Data Sys (Erds).Daily Status Repts Cannot Be Provided Due to Limitations on NRC Computer Sys.Info on Status of SPDS for State Plants Encl ML20237D2331987-02-24024 February 1987 Responds to Questions Raised at 870116 Meeting in Bethesda,Md Re Emergency Response Data Sys.Implementation Status of SPDS for State Nuclear Power Plants Listed ML20215G2071987-02-20020 February 1987 Responds to Expressing Concerns Re 870104 Newsday Article on Plant Emergency Plan.Given Unwillingness of State & Local Govts to Participate in Development of Plan,Approved Util Offsite Emergency Plan Only Such Plan Available ML20211C5251987-02-0606 February 1987 Discusses NRC Analysis of Licensing Schedules for Facility, Per Util 870202 Request for NRC Statement to State of Ca. NRC Sept 1981 - Feb 1982 Monthly Repts to Congress Re Licensing Projections for Pending OL Applications Encl IA-86-699, Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR1986-12-0303 December 1986 Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR ML20214U1621986-12-0303 December 1986 Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR ML20206U8151986-10-0101 October 1986 Ack Receipt of in Response to NRC 851203 Acceptance Appraisal & Concerns.Responses Acceptable. Implementation of Corrective Actions Will Be Reviewed During Future Performance Appraisal ML20203N3241986-09-17017 September 1986 Responds to Re Mitchell Allegations Re as-built Drawings at Byron Station.Allegations Will Be Vigorously Pursued.Recommendation to Pursue Investigation at Byron 2 & Braidwood 1 & 2 Premature ML20215B2851986-09-0202 September 1986 Requests Addl Info Clarifying State of Oh Position Re Participation in Perry Evacuation Plan Prior to 860905 Meeting to Consider Issuance of Full Power License ML20209E3901986-09-0202 September 1986 Responds to 860815 Request That Perry Not Be Licensed for Full Power & Davis-Besse Not Be Permitted to Achieve Full Power Operation Until State of Oh Review of Emergency Evaluation Plans Completed ML20203J0071986-04-15015 April 1986 Addresses Questions & Concerns on Mod 4 to Agreement NRC-31-83-671 Re Interim Preoperational Environ Surveillance Programs at Facilities,Per Jf Thiel & Subsequent Telcons.Funding Levels Detailed ML20197F0381986-04-15015 April 1986 Forwards Population Density Map for Emergency Planning Zone. Map Developed by ORNL by Projecting from 1982 Census Data & Must Be Taken as Estimate.W/O Encl ML20197F8291986-04-15015 April 1986 Forwards Population Density Map for Emergency Planning Zone. Map Developed by ORNL by Projecting from 1982 Census Data & Must Be Taken as Estimate.W/O Encl ML20199J8471986-03-27027 March 1986 Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl ML20199J8951986-03-27027 March 1986 Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl ML20199J8971986-03-27027 March 1986 Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl ML20199J9021986-03-27027 March 1986 Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl ML20142A1111986-02-21021 February 1986 Forwards Appraisal of State of Nc Program for Performing Environ Monitoring Activities at Listed Plants,Including Assessment of Facilities,Equipment,Program Staffing & Personnel Qualification.Program Meets NRC Requirements ML20133P8001985-10-30030 October 1985 Forwards Hb Tucker & H Thompson Draft Ltrs & Environ Assessment Re Duke Power Co Request for Approval of Procedure for Disposal of Radioactively Contaminated Wood, for Review.W/O Encl ML20137E9531985-08-20020 August 1985 Responds to & 850809 Telcon Re Environ Surveillance Program Under Cooperative Agreement NRC-31-83-671.Program Satisfactory,Based on Accumulated Baseline Environ Data Collected During Jan 1984 - Aug 1985 ML20213F3811985-07-30030 July 1985 Responds to 850711 & 15 Requests for Suspension of Low Power Testing Program at Facility & Review of Training of Personnel & Condition of Equipment to Determine If Plant Safe to Test at Low Power.Plant Safely Operated by Util ML20133M1301985-07-0303 July 1985 Further Response to FOIA Request for Documents Re Drafting of IE Bulletins 79-14 & 80-11.Forwards App B Documents. Documents Also Available in Pdr.App C Documents Already in PDR ML20128Q5291985-06-18018 June 1985 Responds to FOIA Request for Documents Re Drafting of IE Bulletins 79-14 & 80-11.Forwards App a Documents.App a Documents Also Available in PDR ML20206H0951985-02-0505 February 1985 Forwards Insp Rept 50-482/84-18 in Response to Five Nonspecific Allegations Forwarded in .W/O Rept ML20128Q7451984-12-0707 December 1984 Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted IA-84-354, Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted1984-12-0707 December 1984 Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted ML20134M9201984-07-13013 July 1984 Forwards Certification of Pollution Control Facilities,Per Util 840529 & 0703 Submittals.Portions of Certification Abate or Control Atmospheric Pollutants or Contaminants ML20133M9961979-10-23023 October 1979 Ack Receipt of Requesting NRC Present Testimony on Me Puc Investigation of Facility.W Russell Will Meet W/Me Puc,Complainants & Util on 791025 in Augusta,Me to Discuss Issues Outlined ML20237J6771975-04-22022 April 1975 Forwards RW Caudle to GL Madsen & GL Madsen to Pg Brittain ML20134B4451975-04-0808 April 1975 Forwards Documents Listed on Encl a Re Facilities ML20237J7061975-04-0707 April 1975 Forwards GL Madsen Transmitting Insp Repts 50-445/75-05 & 50-446/75-05 ML20237J5401974-04-10010 April 1974 Forwards Pg Brittain Responding to Insp Repts 50-445/73-02 & 50-446/73-02 & EM Howard Forwarding Insp Repts 50-445/74-01 & 50-446/74-01 ML20237J6411974-01-28028 January 1974 Forwards EM Howard Transmitting Insp Repts 50-445/73-02 & 50-446/73-02 ML20234A9111971-10-21021 October 1971 Forwards Oct 1964 Rept to Aec,Entitled, Seismic Effects on Bodega Bay Reactor, AEC Press Announcement Issued at Same Time,Rept by ACRS on Proposed Bodega Bay Facility & Summary Analysis of Safety Aspects of Proposed Plant.W/O Encls ML20235C3291970-05-0404 May 1970 Forwards Listed Items for Info,Including Transmitting Repts on Proposed Inservice Insp Program & Proposed Containment Design Pressure for Brunswick Steam Electric Plant. Info Will Be Included in FSAR ML20234E6761964-12-0404 December 1964 Advises That,Per Encl PG&E & Notice,Util Has Withdrawn Application for License to Construct & Operate Reactor at Bodega Bay,Ca.W/O Encls ML20234E5621964-12-0404 December 1964 Forwards Applicant of Withdrawal of Application for License to Construct & Operate Nuclear Reactor at Bogeda Bay,Ca & Related Notice.W/O Encls ML20234E0061964-11-12012 November 1964 Forwards Matls Re Proposed Reactor at Bodega Head,Per Request.Press Release Has Encls Re ACRS Ltr Rept & Div of Reactor Licensing Hazards Analysis.W/O Encl ML20235A2791964-09-24024 September 1964 Forwards 640916 Amend 9 to License Application for Proposed Nuclear Reactor at Bodega Bay,Ca.W/O Encl 1988-09-23 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217N1931999-10-22022 October 1999
[Table view]Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210D2541999-07-21021 July 1999 Forwards Insp Rept 50-298/99-02 on 990628-0702.Purpose of Insp Was Primarily to Evaluate Effectiveness of Licensed Operator Requalification Program.No Violations Were Identified ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209H8191999-07-15015 July 1999 Forwards Safety Evaluation on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Cooper Nuclear Station ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209E6951999-07-12012 July 1999 Discusses Response to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. Recommends Review of New Database Diskettes on Listed Website.Comments Due by 990901 or Data Entered Into Rvid for Plant Will Be Acceptable ML20209D8731999-07-0808 July 1999 Refers to 990707 Meeting Re Licensee Recent Maintenance Program self-assessment.Also Discussed How Licensee Incorporated Assessment Findings Into Rev of Maintenance Performance Improvement Plan.List of Attendees Encl ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl ML20196J2471999-06-29029 June 1999 Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps, ML20196F4931999-06-24024 June 1999 Discusses 990617 Public Meeting at Dana College,Blair,Ne Re Overview of Pilot Insp Program ML20196F7511999-06-24024 June 1999 Discusses 990622 Meeting with Public at Arbor Manor, Alburn,Ne to Provide Overview of Pilot Insp Program ML20196D2321999-06-21021 June 1999 Forwards Corrected Cover Ltr for Insp Rept 50-285/99-04. Original Cover Ltr Incorrectly Stated That Rept Contained Two Noncited Violations,When Rept Actually Documented Only One ML20196E1411999-06-16016 June 1999 Forwards Insp Rept 50-298/99-05 on 990502-29.Noncited Violations Identified ML20195J2121999-06-14014 June 1999 Ack Receipt of Ltr Dtd 990316,which Transmitted Rev 16B to Site Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 6 to Training & Qualification Plan for Plant,Under Provisions of 10CFR50.54(p) IR 05000285/19990041999-06-11011 June 1999 Corrected Ltr Forwarding Insp Rept 50-285/99-04 on 990425-0531.Insp Determined That One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation, Consistent with App C of Enforcement Policy ML20195J2481999-06-11011 June 1999 Forwards Insp Rept 50-285/99-04 on 990425-0531.Violations Identified & Being Treated as Noncited ML20195G3141999-06-10010 June 1999 Ack Receipt of & Encl Objectives for Facility Emergency Plan Exercise,Scheduled for 990810 1999-09-07 |
Text
. _ _ _ . . . _ _ . .__
OCT I 1986 Nebraska State Department of Health ATTN: Gregg F. Wright, M. D.
Director of Health 301 Centennial Mall, South Lincoln, Nebraska 68509 Gentlemen:
Thank you for your letter of February 25, 1986, in response to our acceptance appraisal and concerns dated December 3, 1985. We apologize for the delay in our response, but your original letter apparently was not received in this office. We appreciate your prompt response in sending a copy of the letter, which we received on September 18, 1986. We have reviewed your reply and find it responsive to the concerns raised in the accaptance appraisal. We will review the implementation of your corrective actions during a future performance appraisal to determine full agreement with the terms of the cooperative agreement.
Sincerely, l ORIGINAL. S!GNED BY ROBERT D. MARTIN Robert D. Martin Regional Administrator 1
cc w/ state's letter-James M. Taylor, Director !
Office of Inspection and Enforcement l Merle Dorsey, Contract Administrator Technical Contracts Branch Division of Contracts, ADM Robert J. Doda, RIV Nebraska State Department of Health ATTN: Harold R. Borchert, Director Divisien of Radiological Health 301 Centennial Mall, South 8610090396 861001 PDR ADOCK050002g7 PD Lincoln, Nebraska 68509 p (cc continued next page)
< s RIV:FR C:FRP C:R&SPB D:D RA AI
/jt[I 9 /IC /86 l JBNichol BMurr WLFishet RLB ng rt RD artin h :
l 9 //6/86 9 /99J86 (/g/86 /;/86 /
I
[f j
Nebraska State Department of Health .
Nebrasko State Department of Health ATTN: John D. Blosser, Director Division of Health Laboratories 3701 South 14th Street Lincoln, Nebraska 68502 Omaha Public Power District ATTN: R. L. Andrews, Division Manager Nuclear Production 1623 Harney Street Omaha, Nebraska 68102 Nebraska Public Power District ATTN: J. M. Pilant, Manager, Technical Staff-Nuclear Power Group P. O. Box 499 Columbus, Nebraska 68601 bcc w/ state's letter:
DMB (IE41)
R. D. Martin R. L. Bangart W. L. Fisher ,
D. Meyer '
B. Murray J. B. Nicholas RSTS MIS R&SPB RIV File l l