ML20198H895
| ML20198H895 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 12/22/1998 |
| From: | Kalyanam N NRC (Affiliation Not Assigned) |
| To: | Ohanlon J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML20198H900 | List: |
| References | |
| TAC-MA1222, TAC-MA1223, NUDOCS 9812300051 | |
| Download: ML20198H895 (3) | |
Text
-..
- n. -... - -.
h*
Dec mbep 22,:1998 Mr. J.' P. O'Hinion Senior Vice President-Nuclear Virginia Electric and Power Company -
5000 Dominion Blvd.
l Glen Allen, Virginia 23060 j
SUBJECT:
NORTH ANNA POWER STATION, UNIT 1 AND UNIT 2 - ASME SECTION XI
- RELIEF REQUEST, REVISION TO NDE SERVICE WATER SYSTEM LEAKS -
(TAC NOS. MA1222 AND MA1223) 1
]
Dear Mr. O'Hanlon:
i By your letter dated February 24,1998, as supplemented November 12,1998, you submitted a revision to the original relief request NDE-32 of February 24,2997.- This revision contained certain enhancements that were made to the original program. The staff found that the i
alternative is authorized pursuant to 10 CFR 50.55a(a)(3)(ii), because compliance with the requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The proposed alternative was authorized for the remainder of the f
second 10-year inspection interval for each unit.
' The authorization letter was issued on December 3,1998. Apart from the fact that this authorization letter was erroneously dated as November,3,1998, the end dates of the second 10-year inspection intervals for both units were also incorrect.
The corrected copies of the cover letter and the Safety Evaluation, with the change bars denoting the changes made, are enclosed.
If you have any questions, please call me at (301) 4151480.
Sincerely, Original signed by:
N. Kalyanam, Project Manager Project Directorate ll-2 9812300051 981222 Division of Reactor Projects - 1/11
)
PDR ADOCK 05000338 Office of Nuclear Reactor Regulation G
PDR Docket Nos. 50-338 and 50-339
Enclosure:
Corrected Cover letter and Safety Evaluation
. cc w/ encl: See next page LPlisco, Ril Docket File (
7e)
[
Distribution A O-/g OGC PUBLIC i
HBerkow -
] j)
EDunnington GHill(2)
PD 11-2 Rdg.
c NKalyanam ACRS-JZwolinski j
e-mail TLH SE only MTschiltz, EDO DOCUMENT NAME: G:\\NOANNA\\1222LTR.WPD AD:PDil-2 / j, g OFFICE.
PM:PDll-2 1.A:PDil-2 NKalyanam_ kc[
EDunnington/15 GEdison NAME DATE lA /.Riy98 :
& / J4/98 If/ M 8 COPY Yes / No
- M /No-
'[ YhlNo v
j r
D e
t@ GECy y*
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 20565-0001 o
- ..../
December 22, 1998 g
Mr. J. P. O'Hanlon Senior Vice President - Nuclear J
Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060
SUBJECT:
NORTH ANNA POWER STATION, UNIT 1 AND UNIT 2 - ASME SECTION XI RELIEF REQUEST, REVISION TO NDE SERVICE WATER SYSTEM LEAKS (TAC NOS. MA1222 AND MA1223) 1
Dear Mr,
O'Hanlon:
By your letter dated February 24,1998, as supplemented November 12,1998, you submitted a revision to the original relief request NDE-32 of February 24,2997. This revision contained certain enhancements that were made to the original program. The staff found that the alternative is authorized pursuant to 10 CFR 50.55a(a)(3)(ii), because compliance with the J
requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. The proposed alternative was authorized for the remainder of the second 10-year inspection interval for each unit.
The authorization letter was issued on December 3,1993. Apart from the fact that this authorization letter was erroneously dated as November,3,1998, the end dates of the second j
10-year inspection intervals for both units were also incorrect.
The corrected copies of the cover letter and the Safety Evaluation, with the change bars denoting the changes made, are enclosed.
If you have any questions, please call me at (301) 4151480.
Sincerely, N. Kalyanam, Project Manager Project Directorate 11-2 Division of Reactor Projects - l/II Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339
Enclosure:
Corrected Cover letter and Safety Evaluation cc w/ encl: See next page
=
~
?
9 e
Mr. J. P. O'Hanlon North Anna Power Station Virginia Electric & Power Company Units 1 and 2 cc:
Mr. J. Jeffrey Lunsford Regional Administrator, Region 11 County Administrator U.S. Nuclear Regulatory Commission Louisa County Atlanta Federal Center P.O. Box 160 61 Forsyth St., SW, Suite 23T85 Louisa, Virginia 23093 Atlanta, Georgia 30303 Mr. Donald P. Irwin, Esquire Mr. W. R. Matthews Hunton and Wnliams Site Vice President Riverfront Plaza, East Tower North Anna Power Station 951 E. Byrd Street P. O Box 402 Richmond, Virginia 23219 Mineral, Virginia 23117 Dr. W. T. Lough Mr. R. C. Haag Virginia State Corporation U.S. Nuclear Regulatory Commission Commission Atlanta Federal Center Division of Energy Regulation 61 Forsyth St., SW, Suite 23T85 P. O. Box 1197 Atlanta, Georgia 30303 Richmond, Virginia 23209 i
Mr. E. S. Grecheck Old Dominion Electric Cooperative Site Vice President 4201 Dominion Blvd.
Surry Power Station Glen Allen, Virginia 23060 Virginia Electric and Power Company 5570 Hog Island Road Mr. J. H. McCarthy, Manager Surry, Virginia 23883 Nuclear Licensing & Operations Support.
Robert B. Strobe, M.D., M.P.H.
Virginia Electric and Power Company State Health Commissioner Innsbrook Technical Center Office of the Commissioner 5000 Dominion Blvd.
Virginia Department of Health Glen Allen, Virginia 23060 P.O. Box 2448 j
i Richmond, Virginia 23218 l
Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident inspector North Anna Power Station U.S. Nuclear Regulatory Commission
]
3 1024 Haley Drive Mineral, Virginia 23117 4
)
i i
.