ML20128Q529

From kanterella
Jump to navigation Jump to search
Responds to FOIA Request for Documents Re Drafting of IE Bulletins 79-14 & 80-11.Forwards App a Documents.App a Documents Also Available in PDR
ML20128Q529
Person / Time
Site: Oconee, Surry, Turkey Point, 05000000
Issue date: 06/18/1985
From: Felton J, Feltonkm M
NRC OFFICE OF ADMINISTRATION (ADM)
To: Gilbert D, Herrmann W
ILLINOIS, STATE OF
Shared Package
ML20126K036 List:
References
FOIA-85-301 IEB-79-14, IEB-80-11, NUDOCS 8507270002
Download: ML20128Q529 (3)


Text

.

.I

[so u rg'o, gi. bite UNITED STATES E' I ,o NUCLEAR REGULATORY COMMISSION

$ .E WASHINGTON, D. C. 20555

%,...../

JUN 181985 William J. Herrmann, Esquire David G. Gilbert, Esquire Governor's Office of Consumer Services 160 North LaSalle Street IN RESPONSE REFER Chicago, IL 60601 TO F01A-85-301

Dear Messrs. Herrmann and Gilbert:

This is in response to your letter of April 23, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), copies of documents related to the drafting of I & E Bulletins 79-14 and 80-11.

We are placing copies of the 34 documents listed in the enclosed Appendix A in the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, for your inspection and copying. We are enclosing a copy of a notice that explains charges and procedures for obtaining copies of records from the PDR.

The search for.and review of documents subject to your request are continuing. We will notify you when additional documents are available.

Sincerely, J. M. Felton, Director Division of Rules and Records Office of Administration

Enclosure:

As stated 8507270002 850618 PDR FDIA HERRMAN05-301 PDR

) -

APPENDIX A to F0IA 85-301 Package A

1. 6/14/79 Memo to Files Re: preparation of bulletin (1page)
2. 7/2/79 Memo to Regional Administrators from N. C. Moseley, Director DROI

Subject:

IE Bulletin No. 7914 Seismic Analyses For As-Built SafetyREalted Piping Systems. (7 pages)

3. 7/10/79 Warnick & Danialson Telecon

Subject:

IEB 79-14. ( 1 page)

4. 7/16/79 Memo to Regional Administrators from E. L. Jordan, Asst. Dir.

for Tech Programs,

Subject:

Criteria For Evaluating Operability of Seismic Design Piping Supports Relating to IEB 7902 & 7914.

( 2 pages)

5. 7/20/79 Memo for E. L. Jordan, Asst. Dir. Tech. Programs from K. V.

Seyfrit, R IV

Subject:

Temporary Instruction Re IE Bulletin 7914. ( 2 pages)

6. 8/1/79 Memo for Files from L. Modenos,

Subject:

Duke Power Co. Meeting Re IE Bulletin 7914. (4 pages)

7. 8/3/79 Drawing - Seismic Analysis and As-Built Drawings Action Schedule.

(1page)

8. 8/6/79 Memo for Addressees from Samuel E. Bryan, A/D for Field Coordina-tion, DROI ,

Subject:

TI 2515/29 Inspection Requirements for IE Bulletin 79-14. ( 8 pages)

9. 8/15/79 Memo for Regional Administrators from N. C. Moseley, D/DROI Sub-ject: Supplement to IE Bulletin No. 79-14 Seismic Analyses for As-Built Safety-related Piping Systems. ( 4 pages) 10.8/28/79 Memo for N. C. Moseley, D/DPOI from D. G. Eisenhut, Acting Dir.

DOR /NRP,

Subject:

Recomrrendation Concerning Inspection and Imple-

. mer.tation Requiremeritt of IE Builetin 79-14. (2 pages) 11.8/30/79 Telecon, Feil, RI, Herdt & Modenos, RII, Danialson, RIII, Brickley, RIV, & Hutson, RV, (1 page).

12.9/6/79 Memo for Regional Administrators from N. C. Moseley, D/DROI

Subject:

Supplement 2 to IE Bulletin No. 79-14, Seismic Analyses For As-BuiltSafety-RelatedPipingSystems.(9pages)

Package B 6proposedrevisionwhichwasnotissuedandotherinfo.

13. NOTE Rene Li is handling 79-14 for Bosnak. (1 page) 14,3/18/80 Memo for Regional Directors from E. L. Jordan, Subject; IEB 79-14 Uniformity and Part 21 w/ att Memo for E. Jordan, A/D EP/DROI, from J. C. Bryant, Acting Chief RCESB, RIII

Subject:

Turkey Point IEB 79-14 Inspection - Potential Generic Items. (3 pages).

l

J -

15, 5/28/80 Memo for E. L. Jordan, AD/TP, DROI from Charles Murphy, RIII

Subject:

Proposed Revision to IEB 79-14, (3 pages).

16. 6/3/80 Note to Ed from Roger. (1 page)
17. 7/23/80 ACTION (1 page).
18. 7/29/80 Boznak, Tele. (1 page).
19. 7/29/80 Memo for C. E. MLurphy & U. Potapovs from E. L. Jordan,

Subject:

Seismic Analysis of Certain Small Diameter Lines. (2 pages).

Package C A proposal for interferrence analysis which was epipeted.

20. Undated RS-77-65 Oral Briefings . (3 pages).
21. 12/7/80 2-Way Memo to Roger Woodruff from E. Jordan,

Subject:

Develop Statement of Work for Computerized Interference Exam. (1 page).

22 4/11/80 Howard Rose, Tele. (1 page).

23. 4/11/80 Bob LaGrange, Tele. (1 page).
24. 5/9/80 Memo for H. D. Rose, M&A from E. L. Jordan, AD/TP/DROI

Subject:

Purchase of Services for Piping Interference Analysis. (4 pages).

25. 7/16/80 Memo for Roger W. Woodruff from Virginia Tolson,

Subject:

Task Order Information for Piping Interference Analysis. (8 pages).

26. 7/23/80 ACTION. (2 pages).

27,8/29/80 Memo for J. G. Keppler, RIII from E. L. Jordan, IE

Subject:

Pi ing Interference Analysis. (2 pages).

28 9/15/80 Jerry Smith, RIII, Telecon. (1 page).

29. 12/2/80 Memo for E. L. Jordan, IE from J. G. Keppler, RIII

Subject:

Pip-ing Interference Analysis. (1 page).

30 2/4/81 Telecon: Ed Moskel, Bechtel/Gburg. (1 page)

31. 2/13/81 Letter to S. R. Mitchell, Computerized Interference Elimination, Inc. from V. Stello, Draft. (2 page)
32. 2/24/81 Note To: Levi Baisden, ADM from Ed Jordan, IE, subject: Letter to to Schuyler Mitchell w/att 5/1/80 letter to Roger Woodruff from Schuyler Mitchell,

Subject:

Proposal for Interference Demonstra-tion. (6 pages).

33. 3/17/81 Letter to S. Mitchell from V. Stello w/att Note listed as No. 12.

(8 pages).

34.3/13/81 Memo for E. L. Jordan from R. W. Woodruff,

Subject:

Evaluation of A Proposal by CIE. (3 pages).

.