Category:CORRESPONDENCE-LETTERS
MONTHYEARML17355A4601999-10-26026 October 1999 Forwards Revised Epips,Including Revs to 0-EPIP-1102, 0-EPIP-1212,0-EPIP-20110,0-EPIP-20111,0-EPIP-20132, 0-EPIP-20133 & 0-EPIP-20201,per 10CFR50.54(q) & 10CFR50, App E.Epip 0-EPIP-20107,has Been Deleted ML18152B3571999-10-22022 October 1999 Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML17355A4301999-10-0808 October 1999 Forwards Rev 16 of Updated Fsar.Info Accurately Reflects Plant Changes Made Since Previous Submittal.Rev Incorporates Changes Completed Between 971015 & 990408.Summary of Accuracy Review Changes & Instructions,Included ML17355A4461999-10-0404 October 1999 Notifies NRC of Change in Commitment to Perform Periodic Testing of Critical Welds & Parts on Special Lifting Devices IAW NUREG-0612.Use of Ae Technology Will Provide Same Level of Testing Quality as Did NDE Methods Noted in ANSI Std ML17355A4291999-10-0404 October 1999 Forwards Response to NRC Telcon Questions Re License Amend Request Dtd 990727,proposing Amend on one-time Basis to Modify TS 3.8.1.1 & TS 3.4.3 & 3.5.2 to Extend Allowed Outage Time for EDG from 72 H to 7 Days L-99-208, Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included1999-10-0404 October 1999 Forwards Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408. Summary of PORV Actuations & Results of Plants SG Tube Insp,Which Occurred During That Time Included ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML17355A4251999-09-22022 September 1999 Forwards NRC Form 536 in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams, Issued 990820 ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML17355A4111999-09-0909 September 1999 Informs That Thermo-Lag Upgrades for Fire Zones 47,54,113, 114,115,116,118,119,120 & 143 Completed on 990726,per GL 92-08 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML17355A4131999-09-0707 September 1999 Forwards Revised Relief Request 20 Re Requirement to Perform Exams as Required by IWL-2524 & IWL-2525,Table IWL-2500-1 for Exempt Tendon Insp,Per Recent Discussions with NRC ML17355A4141999-09-0202 September 1999 Documents That Util Has No Concerns or Challenges Related to site-specific Written Exam Administered at Plant on 990830 ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML17355A4061999-08-23023 August 1999 Forwards Semiannual FFD Performance Rept for Period of Jan- June 1999,for Turkey Point Units 3 & 4.List of Events Reported & Summary of Mgt Actions Taken,Included ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML17355A4071999-08-23023 August 1999 Informs That FPL Has Completed Review of Info Listed in Reactor Vessel Integrity Database,Version 2 & Found Listed Discrepancies,Re Closure of GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity. ML17355A4041999-08-23023 August 1999 Forwards Info to Support Assessment of Potential Risks Associated with Proposed Civil Aircraft Operations at Former Homestead Air Force Base to FP&L Turkey Point Nuclear Facility Units 3 & 4 ML17355A4001999-08-20020 August 1999 Informs That on 990722,util Determined Blind Specimen Submitted to Smithkline Beecham Clinical Labs on 990721,was Reported Back with Unsatisfactory Results.Attachment 1 Is Summary of Investigation of Unsatisfactory Performance ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML17355A3941999-07-27027 July 1999 Submits Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for FY00 & FY01 ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML17355A3871999-07-16016 July 1999 Provides Supplement to FP&L Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML17355A3851999-07-14014 July 1999 Informs That Pages Missing from 1998 Annual Radiological Environ Operating Rept, Contain Info Unrelated to ODCM- Specified Sampling & Were Not Included as Part of Rept 1999-09-09
[Table view] Category:NRC TO STATE/LOCAL GOVERNMENT
MONTHYEARML20206C0631988-11-0707 November 1988 Responds to Re Enrichment of Naturally Occurring Radionuclides in Proposed Alchemie Facilities.Company Advised That Facilities Subj to State of Tn Regulations ML20205C3521988-09-23023 September 1988 Final Response to FOIA Request for Documents Re Plant. Forwards App D Documents.App D Documents Also Available in PDR ML20154M5051988-09-22022 September 1988 Responds to Re Rev to Info on Applicability of 10CFR50 Applications for Enriching Stable Isotopes.Listed Observations Provided Based on Info in Ltr & 880914 Telcon ML20236V7341987-12-0101 December 1987 Partial Response to FOIA Request for Documents.Forwards Documents Listed in App C ML20195G6881987-11-0202 November 1987 Responds to to Chairman Zech Re Plant Restart W/O Effective Radiological Emergency Response Plan.Improvements Currently Underway,Based on 870806 FEMA Rept Listing Six Areas of Concern.Plant Will Not Start Until Issues Resolved ML20236B8491987-10-21021 October 1987 Forwards Nrc/State of Nc Environ Monitoring Appraisal on 871005-06.State Met All Obligations in 1986 Contract W/ Exceptions of H-3 Analyses in Surface Waters & I-131 Analyses in Milk,Both Required Lower Detection Limits ML20235S6281987-10-0101 October 1987 Responds to Supporting Request from Smud That Commission Hold Hearing in Sacramento,Ca Re Safety of B&W Nuclear Plants.Response to Concerns Will Be Addressed When Response to Ucs Petition Issued ML20151W0201987-09-0909 September 1987 Summarizes 870521 Meeting W/Massachsetts Officials Re Restart of Facility.Understands That Prior to Decision on Restart,Further Public Meetings Will Be Held ML20238B2991987-08-24024 August 1987 Responds to Expressing Concern That Mgt & Safety Problems Recently Identified at Facility Could Endanger Constituents.Nrc Ready to Take Appropriate Action If Performance Degrades to Levels Endangering Public ML20235G2511987-06-16016 June 1987 Discusses Manner NRC Used to Select Sample of safety-related Concerns in Safeteam Files for Review,Per 870528 Request. Safety Concerns Properly Addressed.Applicable Insp Repts & Related Info Encl ML20213G5001987-03-26026 March 1987 Submits Comments Re Legislation Proposing Placement of Nuclear Safety Inspector at Facility.Mou May Not Be Necessary Due to Precision & Detail of Legislation ML20237C9261987-03-17017 March 1987 Responds to Questions Raised at 870116 Meeting in Bethesda,Md Re Emergency Response Data Sys (Erds).Daily Status Repts Cannot Be Provided Due to Limitations on NRC Computer Sys.Info on Status of SPDS for State Plants Encl ML20237D2331987-02-24024 February 1987 Responds to Questions Raised at 870116 Meeting in Bethesda,Md Re Emergency Response Data Sys.Implementation Status of SPDS for State Nuclear Power Plants Listed ML20215G2071987-02-20020 February 1987 Responds to Expressing Concerns Re 870104 Newsday Article on Plant Emergency Plan.Given Unwillingness of State & Local Govts to Participate in Development of Plan,Approved Util Offsite Emergency Plan Only Such Plan Available ML20211C5251987-02-0606 February 1987 Discusses NRC Analysis of Licensing Schedules for Facility, Per Util 870202 Request for NRC Statement to State of Ca. NRC Sept 1981 - Feb 1982 Monthly Repts to Congress Re Licensing Projections for Pending OL Applications Encl IA-86-699, Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR1986-12-0303 December 1986 Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR ML20214U1621986-12-0303 December 1986 Responds to FOIA Request to DOJ for Records Re DOJ Investigation of Util Role in Siting,Licensing & Constructing Diablo Canyon.Forwards App a & B Documents. Documents Also Available in PDR ML20206U8151986-10-0101 October 1986 Ack Receipt of in Response to NRC 851203 Acceptance Appraisal & Concerns.Responses Acceptable. Implementation of Corrective Actions Will Be Reviewed During Future Performance Appraisal ML20203N3241986-09-17017 September 1986 Responds to Re Mitchell Allegations Re as-built Drawings at Byron Station.Allegations Will Be Vigorously Pursued.Recommendation to Pursue Investigation at Byron 2 & Braidwood 1 & 2 Premature ML20209E3901986-09-0202 September 1986 Responds to 860815 Request That Perry Not Be Licensed for Full Power & Davis-Besse Not Be Permitted to Achieve Full Power Operation Until State of Oh Review of Emergency Evaluation Plans Completed ML20215B2851986-09-0202 September 1986 Requests Addl Info Clarifying State of Oh Position Re Participation in Perry Evacuation Plan Prior to 860905 Meeting to Consider Issuance of Full Power License ML20203J0071986-04-15015 April 1986 Addresses Questions & Concerns on Mod 4 to Agreement NRC-31-83-671 Re Interim Preoperational Environ Surveillance Programs at Facilities,Per Jf Thiel & Subsequent Telcons.Funding Levels Detailed ML20197F0381986-04-15015 April 1986 Forwards Population Density Map for Emergency Planning Zone. Map Developed by ORNL by Projecting from 1982 Census Data & Must Be Taken as Estimate.W/O Encl ML20197F8291986-04-15015 April 1986 Forwards Population Density Map for Emergency Planning Zone. Map Developed by ORNL by Projecting from 1982 Census Data & Must Be Taken as Estimate.W/O Encl ML20199J8471986-03-27027 March 1986 Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl ML20199J8951986-03-27027 March 1986 Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl ML20199J8971986-03-27027 March 1986 Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl ML20199J9021986-03-27027 March 1986 Forwards Population Density Maps for Facilities Emergency Planning Zones.Maps Developed by ORNL from 1980 Census Data & Must Be Taken as Estimate.W/O Encl ML20142A1111986-02-21021 February 1986 Forwards Appraisal of State of Nc Program for Performing Environ Monitoring Activities at Listed Plants,Including Assessment of Facilities,Equipment,Program Staffing & Personnel Qualification.Program Meets NRC Requirements ML20133P8001985-10-30030 October 1985 Forwards Hb Tucker & H Thompson Draft Ltrs & Environ Assessment Re Duke Power Co Request for Approval of Procedure for Disposal of Radioactively Contaminated Wood, for Review.W/O Encl ML20137E9531985-08-20020 August 1985 Responds to & 850809 Telcon Re Environ Surveillance Program Under Cooperative Agreement NRC-31-83-671.Program Satisfactory,Based on Accumulated Baseline Environ Data Collected During Jan 1984 - Aug 1985 ML20213F3811985-07-30030 July 1985 Responds to 850711 & 15 Requests for Suspension of Low Power Testing Program at Facility & Review of Training of Personnel & Condition of Equipment to Determine If Plant Safe to Test at Low Power.Plant Safely Operated by Util ML20133M1301985-07-0303 July 1985 Further Response to FOIA Request for Documents Re Drafting of IE Bulletins 79-14 & 80-11.Forwards App B Documents. Documents Also Available in Pdr.App C Documents Already in PDR ML20128Q5291985-06-18018 June 1985 Responds to FOIA Request for Documents Re Drafting of IE Bulletins 79-14 & 80-11.Forwards App a Documents.App a Documents Also Available in PDR ML20206H0951985-02-0505 February 1985 Forwards Insp Rept 50-482/84-18 in Response to Five Nonspecific Allegations Forwarded in .W/O Rept ML20128Q7451984-12-0707 December 1984 Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted IA-84-354, Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted1984-12-0707 December 1984 Discusses Util Program for Early Completion of Const & rate-setting Procedures.Danger in Speeding Up Const Noted ML20134M9201984-07-13013 July 1984 Forwards Certification of Pollution Control Facilities,Per Util 840529 & 0703 Submittals.Portions of Certification Abate or Control Atmospheric Pollutants or Contaminants ML20133M9961979-10-23023 October 1979 Ack Receipt of Requesting NRC Present Testimony on Me Puc Investigation of Facility.W Russell Will Meet W/Me Puc,Complainants & Util on 791025 in Augusta,Me to Discuss Issues Outlined ML20237J6771975-04-22022 April 1975 Forwards RW Caudle to GL Madsen & GL Madsen to Pg Brittain ML20134B4451975-04-0808 April 1975 Forwards Documents Listed on Encl a Re Facilities ML20237J7061975-04-0707 April 1975 Forwards GL Madsen Transmitting Insp Repts 50-445/75-05 & 50-446/75-05 ML20237J5401974-04-10010 April 1974 Forwards Pg Brittain Responding to Insp Repts 50-445/73-02 & 50-446/73-02 & EM Howard Forwarding Insp Repts 50-445/74-01 & 50-446/74-01 ML20237J6411974-01-28028 January 1974 Forwards EM Howard Transmitting Insp Repts 50-445/73-02 & 50-446/73-02 ML20234A9111971-10-21021 October 1971 Forwards Oct 1964 Rept to Aec,Entitled, Seismic Effects on Bodega Bay Reactor, AEC Press Announcement Issued at Same Time,Rept by ACRS on Proposed Bodega Bay Facility & Summary Analysis of Safety Aspects of Proposed Plant.W/O Encls ML20235C3291970-05-0404 May 1970 Forwards Listed Items for Info,Including Transmitting Repts on Proposed Inservice Insp Program & Proposed Containment Design Pressure for Brunswick Steam Electric Plant. Info Will Be Included in FSAR ML20234E5621964-12-0404 December 1964 Forwards Applicant of Withdrawal of Application for License to Construct & Operate Nuclear Reactor at Bogeda Bay,Ca & Related Notice.W/O Encls ML20234E6761964-12-0404 December 1964 Advises That,Per Encl PG&E & Notice,Util Has Withdrawn Application for License to Construct & Operate Reactor at Bodega Bay,Ca.W/O Encls ML20234E0061964-11-12012 November 1964 Forwards Matls Re Proposed Reactor at Bodega Head,Per Request.Press Release Has Encls Re ACRS Ltr Rept & Div of Reactor Licensing Hazards Analysis.W/O Encl ML20235A2791964-09-24024 September 1964 Forwards 640916 Amend 9 to License Application for Proposed Nuclear Reactor at Bodega Bay,Ca.W/O Encl 1988-09-23
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20217D6621999-05-14014 May 1999 Forwards NRC Operator Licensing Exams 50-280/99-301 & 50-281/99-301 (Including Completed & Graded Exams) for Tests Administered on 990329-0401 & 990412-15.Nine Candidates Passed (& One Failed) Exam ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML20205T1301999-04-0909 April 1999 Informs That on 990317,C Efin & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Y2K.Initial Exam Dates Scheduled for Wks of 000710 & 17 for Approx 13 Candidates ML20205B0571999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of Review of License Renewal Application for Ons,Units 1,2 & 3, That Staff Determines Has Generic Value to Industry ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20199D2291999-01-12012 January 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core of Over Safety-Related Equipment ML20198Q8871999-01-0707 January 1999 Responds to to Chairman SA Jackson Re Issues for Consideration for Commission During Oconee License Renewal Process.Commissioners Must Remain Impartial During Pendency of Case.Copy of Order LBP-98-33 Encl.Served on 990107 ML20198S8721999-01-0707 January 1999 Responds to Message to Marks Re Info Request on Appeal Deadline & Desire to Serve Appeal Either by e-mail or by Alternative Regular Mail DD-98-10, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-98-10 Has Expired.Decision Became Final on 981116.With Certificate of Svc.Served on 9811201998-11-19019 November 1998 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-98-10 Has Expired.Decision Became Final on 981116.With Certificate of Svc.Served on 981120 ML20155H8061998-10-29029 October 1998 Responds to Discussing NRC Initiatives & Efforts. Plans for Another Stakeholders Meeting Underway for 981113. Staff Will Continue to Solicit Feedback & Comments from Public on Initiatives ML20155D2651998-10-23023 October 1998 Expresses Appreciation for Supporting Commission Initiative in Issuing Recent Statement of Policy on Conduct of Adjudicatory Proceedings.Case-specific Orders Were Issued in Calvert Cliffs & Oconee License Renewal Proceedings ML20154B2531998-09-17017 September 1998 Responds to Stating Intention to Pursue License Renewal Application for Turkey Point,Units 3 & 4.Info Shared by Util Will Be Useful for NRC Resource Planning ML20153D1831998-09-17017 September 1998 Ack Receipt of of Duke Energy Co Inviting Reconsideration of Denial by NRC CFO of Duke Exemption Request from Annual Fee Requirements for General License Under 10CFR171.11(d) ML20151T9351998-08-27027 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept ML20237B0871998-08-11011 August 1998 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 981007.Sample Registration Ltr Encl ML20237B0001998-07-30030 July 1998 Confirms 980728 Telcon Between D Sommers & R Haag Re Meeting Scheduled for 980810 in Atlanta,Ga to Discuss Recent Mgt Changes & Items of Interest ML20236S7521998-07-20020 July 1998 Ltr Contract:Task Order 15, Turkey Point Safety Sys Enginering Insp, Under Contract NRC-03-98-021 ML20236P9451998-07-15015 July 1998 Forwards Emergency Response Data Sys Implementation Documents Including Data Point Library Updates for Oconee (Number 255),Dresden (Number 257) & Susquehanna (Number 258) ML20236Q6751998-07-13013 July 1998 Forwards Insp Repts 50-280/98-05 & 50-281/98-05 on 980503-0613.No Violations Were Identified.Conduct of Activities at Surry Facilities Was Generally Characterized by safety-conscious Operations,Sound Engineering & Maint ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety ML20249A7951998-06-12012 June 1998 Responds to from R Saunders & L Liberatori Requesting Waiver of Fee to Review 971031 Plant,Unit 1 Risk-Informed Inservice Insp Submittal ML20217P4601998-05-0101 May 1998 Forwards ERDS Implementation Documents Including Data Point Library Updates for Robinson (Number 248),Peach Bottom (Number 249),Surry (Number 250),Crystal River (Number 251), McGuire (Numbers 252 & 254) & Salem (Number 253).W/o Encl ML20199J7441998-02-0202 February 1998 Responds to NRC Bulletin 96-004 for NUHOMS-24P Sf Storage Sys Used at Plant Site.Nrc Reviewed Response & Found Response to Be Acceptable ML20199G0741998-01-23023 January 1998 Discusses 980116 Meeting W/Utility in Atlanta,Ga to Provide VEPCO Opportunity to Discuss Performance at Surry Facility. List of Attendees,Plant Self Assessment ,safety Culture Memo & Suppl Handout Encl ML20198K9321998-01-13013 January 1998 Ack Receipt of Requesting Exemption from 10CFR171 for ISFSI License SNM-2503 & General License Provisions of 72.214 ML20198M9361998-01-12012 January 1998 Responds to Request That rept,BAW-2303P,rev 3 Be Considered Exempt from Mandatory Public Disclosure.Determined That Info Sought to Be Withheld Contains Proprietary Commercial Info & Will Be Withheld from Public Disclosure ML20203C8481997-12-10010 December 1997 Forwards Emergency Response Data Sys Implementation Documents for Plants.W/O Encl ML20198Q6451997-11-10010 November 1997 Ack Receipt of & Check for $55,000 in Payment for Civil Penalty Proposed by NRC in .Corrective Actions Will Be Examined During Future Insps ML20211P1591997-10-17017 October 1997 Ack Receipt of & Check for $330,000 in Payment for Civil Penalty.Corrective Actions Will Be Examined During Future Insp ML20211N2701997-10-0707 October 1997 Forwards Insp Repts 50-280/97-11 & 50-281/97-11 on 970924. No Violations or Deviations Noted.Insp Determined Whether Activities Authorized by Licensee Were Conducted Safely & IAW NRC Requirements DD-97-20, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-97-20 Has Expired.Commission Declined Any Review.Decision Became Final on 971003.W/Certificate of Svc.Served on 9710071997-10-0707 October 1997 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision DD-97-20 Has Expired.Commission Declined Any Review.Decision Became Final on 971003.W/Certificate of Svc.Served on 971007 ML20217D7261997-10-0101 October 1997 Informs That Staff Intends to Use Working Draft SRP-LR as Aid in Reviewing License Renewal Submittals Received from Dpc,Other Licensees & Owners Groups.Policy Issues Will Be Referred to Commission for Resolution ML20217E5571997-09-26026 September 1997 Forwards Insp Repts 50-250/97-09 & 50-251/97-09 on 970826.No Violations or Deviations Noted ML20217D9341997-09-22022 September 1997 Informs That NRC Staff Has Accepted Deferral of Completion of Certain Actions Requested by Bulletin 96-03, Potential of Plugging of ECCS Strainers by Debris in Boiling Water Reactor ML20216G5821997-09-0404 September 1997 Informs That 970730 Submittal Re Oconee Nuclear Station, Units 1,2 & 3 Will Be Marked Proprietary & Being Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEC Act of 1954 IR 05000280/19970011997-08-29029 August 1997 Discusses Insp Repts 50-280/97-01 & 50-281/97-01 on 970113 & 17 & Forwards NOV & Proposed Imposition of Civil Penalty in Amount of $55,000 IR 05000269/19970071997-08-27027 August 1997 Discusses Insp Repts 50-269/97-07,50-270/97-07,50-287/97-07, 50-269/97-08,50-270/97-08 & 50-287/97-08 on 970606 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $330,000 ML20210N1531997-08-13013 August 1997 Confirms 970807 Telcon Between J Burchfield & R Carroll Re Management Meeting to Be Conducted at Oconee Nuclear Station on 970922.Purpose of Meeting to Discuss Oconee Emergency Power Project Initiatives ML20210M8381997-08-13013 August 1997 Confirms Conversation Between J Burchfield & R Carroll on 970807 Re Mgt Meeting to Be Conducted in Region II Ofc on 971113.Meeting to Discuss Status of Plant Performance Improvement Initiatives ML20210N1121997-08-12012 August 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 971008. Facililty Must Submit Either Ltr Indicating No Candidates Scheduled to Participate or Listing Names of Candidates ML20149H8551997-07-23023 July 1997 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in Pdr.App B Records Being Made Available in PDR ML20149E5281997-07-11011 July 1997 Final Response to FOIA Request for Documents.Forwards Documents Listed in App a Being Withheld in Part (Ref Exemptions 5 & 7C) ML20149E8491997-07-10010 July 1997 Forwards Operational Safeguards Response Evaluation Review Held on 970520-21.Evaluation Resulted from Feb 97 Insp That Indicated Changes in Site Protection Strategy or Capability Should Be Validated.Encl Withheld ML20148P5161997-06-30030 June 1997 Second Partial Response to FOIA Request for Documents.App B Records Being Made Available in PDR 1999-09-08
[Table view] |