_

December 8,1998 Mr. J. P. O'Hanlon Senior Vice President Virginia Electric and Power Company 5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

NORTH ANNA POWER STATION UNIT 1 AND UNIT 2 - ASME SECTION XI RELIEF REQUEST, REVISION TO NDE SERVICE WATER SYSTEM LEAKS (TAC NOS. MA1222 AND MA1223)

Dear Mr. J. O'Hanlon:

By your letter dated February 24,1998, as supplemented November 2,1998, you submitted a revision to the original relief request NDE-32 of February 24,2997. This revision contained certain enhancements that were made to the original program.

The NRC found that the altemative contained in the revision is authorized pursuant to 10 CFR 50.55a(a)(3)(ii) because compliance with the requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. The staff's evaluation and conclusions were transmitted to you on December 3,1998. However, due to an administrative error, the transmittal letter was dated as November 3,1998.

We request that you make pen and ink changes to the dates that read as " November 3,1998,"

in the letter and at the end of the Safety Evaluation to " December 3,1998." By a copy of this letter, we are also requesting all the recipients of the letter to make the same changes. We regret any inconvenience this error has caused.

Sincerely, ORIGINAL SIGNED BY:

N. Kalyanam, Project Manager Project Directorate 11-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulations Docket Nos. 50-338 and 50-339 f

cc: See next page f

Distribution:

/

Docket File PUBLIC PDil/2 RF ACRS d

f)

J. Zwolinski OGC CJackson

/

FILENAME: g:\\noanna\\12221tr1.wpd OFFICE PM:PDil-2 LA:PDil-2 D:PDil-2 N

NKalyanam M EDunnington NAME HBer h /98 M /7 /98

/2/h/98 DATE

/

/98

[es/ho Q No Yes / No Yes / No COPY OFFICtKL RECORD COPY 9812100125 981200 l

PDR ADOCK 05000338 ynne c.errv: ar Wt i

P PDR gf

, L ; b
'w l

a g,g k

UNITED STATES g

NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 30086 0001 December 8, 1998 Mr. J. P. O'Hanlon i

Senior Vice President Virginia Electric and Power Company i

5000 Dominion Boulevard Glen Allen, VA 23060

SUBJECT:

NORTH ANNA POWER STATION UNIT 1 AND UNIT 2 - ASME SECTION XI RELIEF REQUEST, REVISION TO NDE SERVICE WATER SYSTEM 1

LEAKS (TAC NOS. MA1222 AND MA1223)

Dear Mr. J. O'Hanlon:

By your letter dated February 24,1998, as supplemented November 2,1998, you submitted a revision to the original relief request NDE-32 of February 24,2997. This revision contained certain enhancements that were made to the original program.

The NRC found that the alternative contained in the revision is authorized pursuant to 10 CFR 50.55a(a)(3)(ii) because compliance with the requirements would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. The staff's evaluation and conclusions were transmitted to you on December 3,1998. However, due to an administrative error, the transmittal letter was dated as November 3,1998.

We request that you make pen and ink changes to the dates that read as " November 3,1998,"

in the letter and at the end of the Safety Evaluation to " December 3,1998." By a copy of this letter, we are also requesting all the recipients of the letter to make the same changes. We

- regret any inconvenience this error has caused.

Sincerely, l

N. Kalyanam oject Manager Project Directorate ll 2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulations Docket Nos. 50-338 and 50-339 cc: See next page 1

(

j Mr. J. P. O'Hanlon North Anna Power Station Virginia E8ectric & Power Company Units 1 and 2 cc:

Mr. J. Jeffrey Lunsford Regional Administrator, Region 11 i

County Administrator U.S. Nuclear Regulatory Commission Louisa County Atlanta Federal Center P.O. Box 160 61 Forsyth SL, SW, Suite 23T85 Louisa, Virginia 23093 Atlanta, Georgia 30303

)

Mr. Donald P. Irwin, Esquire Mr. W. R. Matthews Hunton and Williams Site Vice President Riverfront Plaza, East Tower -

North Anna Power Station 951 E. Byrd Street P. O. Box 402 Richmond, Virginia 2321g Mineral, Virginia 23117

.I Dr. W. T. Lough Mr. R. C. Haag j

Virginia State Corporation U.S. Nuclear Regulatory Commission Commission Atlanta Federal Center l

Division of Energy Regulation 61 Forsyth St., SW, Suite 23T85 i

P. O. Box 1197 Atlanta, Georgia 30303 j

Richmond, Virginia 23209 Mr. E. S. Grecheck Old Dominion Electric Cooperative Site Vice President

,4201 Dominion Blvd.

Surry Power Station l

Glen Allen, Virginia 23060 Virginia Electric and Power Company 5570 Hog Island Road Mr. J. H. McCarthy, Manager Surry, Virginia 23883 Nuclear Licensing & Operations Support Robert B. Strobe, M.D., M.P.H.

~

Virginia Electric and Power Company State Health Commissioner Innsbrook Technical Center Office of the Commissioner 5000 Dominion Blvd.

Virginia Department of Health Glen Allen, Virgiria 23060 P.O. Box 2448 Richmond, Virginia 23218 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117 v