Line 62: |
Line 62: |
| ==1.0 BACKGROUND== | | ==1.0 BACKGROUND== |
|
| |
|
| By letter dated December 16,1996, in accordance with 10 CFR Part 72, the Department of Energy (DOE) submitted an application for transfer of the existing Materials License for th St Vrain Independent Spent Fuel Storage installation (ISFSI). The Fort St Vrain ISFSI is a stand alone facility that houses spent fuel from the formerly licensed Fort St Vrain High Temperature Gas-Cooled Reactor. The NRC staff is performing a review of that applicat ensure the application meets the requirements of 10 CFR Part 72. The NRC staff will also perform inspections responsibilities as necessary of an NRC license. to verify the licensee's readiness to discharge the 2.0 OBJECTIVE A modification to the task is requested to revise the scope of work in order to obtain additional assistance in the preparation of the staff's safety evaluation report for the review of the DOE Fort St. Vrain license transfer application. | | By {{letter dated|date=December 16, 1996|text=letter dated December 16,1996}}, in accordance with 10 CFR Part 72, the Department of Energy (DOE) submitted an application for transfer of the existing Materials License for th St Vrain Independent Spent Fuel Storage installation (ISFSI). The Fort St Vrain ISFSI is a stand alone facility that houses spent fuel from the formerly licensed Fort St Vrain High Temperature Gas-Cooled Reactor. The NRC staff is performing a review of that applicat ensure the application meets the requirements of 10 CFR Part 72. The NRC staff will also perform inspections responsibilities as necessary of an NRC license. to verify the licensee's readiness to discharge the 2.0 OBJECTIVE A modification to the task is requested to revise the scope of work in order to obtain additional assistance in the preparation of the staff's safety evaluation report for the review of the DOE Fort St. Vrain license transfer application. |
| 3.0 LEVEL OF EFFORT The level of effort is estimated at 10.5 professional staff weeks. | | 3.0 LEVEL OF EFFORT The level of effort is estimated at 10.5 professional staff weeks. |
| 4.0 PERIOD OF PERFORMANCE The period 31,1998. of performance for the work specified in this SOW shall be extended until October i | | 4.0 PERIOD OF PERFORMANCE The period 31,1998. of performance for the work specified in this SOW shall be extended until October i |
Line 70: |
Line 70: |
| The contractor shall perform a review in accordance with NUREG-1567, " Standard Review Plan for Spent Fuel Dry Storage Facilities, Draft for Comment, | | The contractor shall perform a review in accordance with NUREG-1567, " Standard Review Plan for Spent Fuel Dry Storage Facilities, Draft for Comment, |
| * October 1996. Specifically, the contractor shall perform a review in accordance with Chapters 2 (Site Characteristics), 3 (Design Criteria),7 (Installation Design and Structural Evaluation) and 8 (Thermal Evaluation) of the October 1996 revision of NUREG-1567. | | * October 1996. Specifically, the contractor shall perform a review in accordance with Chapters 2 (Site Characteristics), 3 (Design Criteria),7 (Installation Design and Structural Evaluation) and 8 (Thermal Evaluation) of the October 1996 revision of NUREG-1567. |
| The contractor shall perform the above review on the applicant's December 1996 Safety Analysis Report and December 10,1997 revision to the Safety Analysis Report. The contractor may draw on previous staff review of the Fort St Vrain ISFSI as documented in the Safety Evaluation Report which accompanied the Fort St Vrain ISFSI license by letter dated November 4,1991. | | The contractor shall perform the above review on the applicant's December 1996 Safety Analysis Report and December 10,1997 revision to the Safety Analysis Report. The contractor may draw on previous staff review of the Fort St Vrain ISFSI as documented in the Safety Evaluation Report which accompanied the Fort St Vrain ISFSI license by {{letter dated|date=November 4, 1991|text=letter dated November 4,1991}}. |
| The contractor shall produce, upon completion of the review, a report that includes discrete sections corresponding to each of the SRP Sections listed above. Further, those discrete sections shall be prepared according to the outline presented in Appendix A-9 of the SRP. The report sections shall document the contractor's evaluation of the DOE FSV ISFSI SAR for compliance with the requirements of Part 72. The staff will use the contractor report to prepare the final safety evaluation of the license transfer application. | | The contractor shall produce, upon completion of the review, a report that includes discrete sections corresponding to each of the SRP Sections listed above. Further, those discrete sections shall be prepared according to the outline presented in Appendix A-9 of the SRP. The report sections shall document the contractor's evaluation of the DOE FSV ISFSI SAR for compliance with the requirements of Part 72. The staff will use the contractor report to prepare the final safety evaluation of the license transfer application. |
| 6.0 MEETINGS AND TRAVEL lt is anticipated that there may be one one-person trip to Rockville MD of one day duration excluding travel time. | | 6.0 MEETINGS AND TRAVEL lt is anticipated that there may be one one-person trip to Rockville MD of one day duration excluding travel time. |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205G8771999-03-26026 March 1999 Forwards Copy of Cover Page from Fort St-Vrain Welding Manual,Which Had Been Listed as Encl on Page 4 of 990325 Reply to EA 98-081.Cover Page Had Been Inadvertently Left Out with Original Reply ML20197H8811998-12-0101 December 1998 Forwards Proposed Change to Fsv ISFSI Physical Protection Plan in Which Commitment Is Made to Provide Feature to Security Posture for Facility ML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198K1931997-10-10010 October 1997 Provides Supplemental Info in Support of Util Proposed Rev to Physical Security Plan for Plant Plant Isfsi.Plan Withheld,Per 10CFR2.790(d) & 10CFR73.21 ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141F3521997-05-14014 May 1997 Forwards Proposed Issue 4 of Physical Security Plan for Fort St Vrain ISFSI for Review & Approval.Encl Withheld,Per 10CFR2.790(d) ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan ML20138G2701997-04-28028 April 1997 Provides Response to NRC Comments Re Proposed Sampling & Survey Plan for Fsv Effluent Pathway.Response Documents Fsv Liquid Effluent Discharge Pathway Areas Are Acceptable for Release for Unrestricted Use IAW Draft NUREG/CR-5849 ML20148D4651997-04-24024 April 1997 Forwards Revised Interim Ltr Rept Which Describes Procedures & Results of Confirmatory Survey of Group E Effluent Discharge Pathway Areas at Fsv Station NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20138B0511997-04-22022 April 1997 Forwards Copy of Proposed Amend to Fsv NPDES Permit, Wastewater Discharge Permit CO-0001121 Requested to Support Repowering Activities,Iaw Section 3.2.d of Fsv Non-Radiological Ts,App B to License DPR-34 ML20140E1061997-04-10010 April 1997 Forwards Confirmatory Survey of Group Effluent Discharge Pathway Areas for Fsv Nuclear Station,Platteville,Co ML20137S4481997-04-0808 April 1997 Informs That Decommissioning Activities at Fsv Are Complete & NRC Issued Exemption from Requirements of 10CFR50.54(w) in .Property Damage Insurance Policy Is Maintaned to Protect Fsv balance-of-plant Assets ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S5421997-04-0707 April 1997 Forwards Final Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Fort St Vrain Nuclear Station ML20148D5951997-04-0404 April 1997 Forwards Confirmatory Survey for Fsv Nuclear Station, Psc,Platteville,Co, Final Rept ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20148D5811997-03-26026 March 1997 Forwards Confirmatory Survey Plan for Group E Effluent Discharge Pathway Areas at Fsv Nuclear Station, Covered in Final Survey Rept,Vol 6 ML20137G7361997-03-25025 March 1997 Requests Addl Time for Util to Respond to NRC Comments in Re Financial Assurance Mechanism for Fort St Vrain Decommissioning Costs ML20137G9521997-03-24024 March 1997 Forwards Quarterly 10CFR50.59 Rept for Period 961201-970228 Re Changes,Tests & Experiments for Fort St Vrain Decommissioning ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20137C0181997-03-18018 March 1997 Documents That No Personnel Has Received Radiation Exposure at Fsv in 1997 or at Any Time Subsequent to ML20137C0061997-03-18018 March 1997 Documents That There Have Been No Activities Involving Release of Radioactive Matls from Fsv Nuclear Station That Potentially Could Have Affected Environ,Subsequent to Previous Radiological Envion Operating Rept ML20136G1201997-03-11011 March 1997 Forwards Annual Radioactive Effluent Release Rept for Jan- Dec 1996 & Jan-Mar 1997. All Effluent Releases Completed as of 960703.Repts on Activities After 960703 Reflect Disposal of Solid Waste ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135D7891997-02-27027 February 1997 Forwards Responses to Comments Re Fort St Vrain Final Survey Rept ML20135D9531997-02-27027 February 1997 Forwards Copy of Amend to Util Npdes,Wastewater Discharge Permit CO-0001121,which Clarifies That Monitoring of Farm Pond Outlet Required When Industrial Wastewater Being Discharged Through Upstream Goosequill Ditch ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20134D1551997-01-31031 January 1997 Forwards Util Responses to NRC Comments Provided in NRC Ltr Re Sampling & Survey Plan Used for Final Radiological Survey of Liquid Effluent Pathway at Ft St Vrain ML20134C8481997-01-30030 January 1997 Forwards Draft Confirmatory Survey Rept for Fsv Nuclear Station,Psc,Platteville,Co Providing Info on Essap Activities on 960930-1003 ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20133E0481997-01-0202 January 1997 Forwards Comments to Fsv Nuclear Station, Decommissioning Project Final Survey Rept (Volumes 4-11), for Consideration ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20132F2841996-12-19019 December 1996 Forwards Quarterly 10CFR50.59 Rept of Changes,Tests & Experiments Affecting Decommissioning of Plant,Covering Period of 960901-1130 ML20133A8591996-12-16016 December 1996 Forwards Original & Copy Transcripts of Public Hearing,Held on 961203 in Platteville,Co Re Decommissioning & License Termination of Util Ft Saint Vrain Nuclear Generating Station ML20133N0011996-12-0404 December 1996 Recommends That NRC Require License to Modify Submission of Unexecuted Draft Trust Agreement Remaining Decommissioning Costs for Ft St Vrain Nuclear Generating Station in Listed Ways ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20135A5861996-11-25025 November 1996 Submits Suppl Info Re Annual Environ Rept for 1995 Operation of Fsv ISFSI ML20135A6361996-11-20020 November 1996 Submits Copy of Describing Discharge Practices for Groundwater Seeping Into Fsv'S Reactor Building Sump ML20134L4721996-11-14014 November 1996 Notifies NRC That Util Adopted Fsv ISFSI Emergency Response Plan to Direct Emergency Response for Radiological Accidents Occuring at Site,Until 10CFR50 License Is Terminated ML20134F4351996-10-30030 October 1996 Forwards Sections 1,2,6 & 8 from Survey Packages F0015, F0039 & F0126 & Sections 1,2 & 6 from Survey Package F0115 to Support on-site NRC Insp ML20134G5991996-10-30030 October 1996 Forwards Volumes 1-12 to Final Survey Rept for Groups A,B,C Rev 1,D Rev 1,E,F Rev 1 & G-J for NRC Approval in Support of Forthcoming Request for Termination of Fsv 10CFR50 License ML20133D7691996-10-22022 October 1996 Forwards Preliminary Rept Re Orise Support of NRC License Insp at Fsv on 960930-1003 ML20136B1411996-10-15015 October 1996 FOIA Request for Documents Re NOV Addressed to Scientific Ecology Group Re NRC Insp Rept 50-267/94-03 & OI Investigation Repts 4-94-010 & 4-95-015 ML20128M6181996-10-0404 October 1996 Forwards Ltr from PSC to Co Dept of Public Health & Environ Describing Monitoring Practices at Plant ML20128G8041996-10-0101 October 1996 Forwards Fsv Decommissioning Fire Protection Plan Update 1999-03-26
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20236R9191998-07-20020 July 1998 Ltr Contract:Mod 4 to Task Order 27, Task Area No 4 of Basic Contract - Fort St Vrain Insp Under Contract NRC-02-95-003 ML20199H8141997-11-21021 November 1997 Responds to Requesting Clarification as to Whether Increase in Tritium & Iron-55 Contamination Limits That Were Approved for Plant Apply to All Licensees ML20198H5601997-09-16016 September 1997 Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20141C8611997-05-0909 May 1997 Informs of Approval of Fsv Final Survey Rept & Effluent Pathway Survey Plan & Supporting Analysis ML20141K9881997-05-0505 May 1997 Forwards Amend 89 to License DPR-34 & Supporting Safety Evaluation.Amend Designates All Elements of Approved Decommissioning Plan as License Termination Plan NUREG/CR-5849, Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-58491997-04-23023 April 1997 Requests That Licensee Provide Evidence That Average Contamination Levels in Group E Effluent Discharge Pathway Areas Meet Averaging Criteria in Draft NUREG/CR-5849 ML20137S1691997-04-0707 April 1997 Fifth Partial Response to FOIA Request for Documents. Forwards Documents Listed in App K ML20137S0821997-04-0707 April 1997 Forwards Insp Rept 50-267/97-01 on 970310-11.No Violations Noted ML20137R6921997-04-0404 April 1997 Informs of Approval for Request for Addl 45 Days to Remedy Deficiencies Identified in NRC Re Financial Assurance Mechanism for Fsv Decommissioning Costs ML20137J8051997-03-31031 March 1997 Third Partial Response to FOIA Request for Documents.Records in App F Encl & Will Be Available in Pdr.App G & H Records Withheld in Part (Ref FOIA Exemptions 5 & 7) ML20137H1131997-03-24024 March 1997 Second Partial Response to FOIA Request for Documents. Forwards Documents Listed in App D.Documents Also Available in Pdr.Documents Listed in App E Withheld in Part (Ref FOIA Exemption 6) ML20136B1331997-02-28028 February 1997 First Partial Response to FOIA Request for Documents. Documents Listed in App a Already Available in Pdr.Forwards App B Documents.App C Documents Being Withheld in Entirety (Ref FOIA Exemption 5) ML20135A8711997-02-14014 February 1997 Requests That Encl Deficiencies Identified in Financial Assurance Mechanism for Fort St Vrain Decommissioning Cost Be Addressed within 45 Days ML20133L4961997-01-0707 January 1997 Forwards Comments That Need to Be Resolved Before Final Approval of Util Submittal Entitled, Proposed Sampling & Survey Plan for Effluent Pathway,Ft St Vrain Final Survey Program ML20132G0421996-12-23023 December 1996 Forwards Insp Rept 50-267/96-05 on 961203-05.No Violations Noted ML20135B3861996-11-25025 November 1996 Informs That NRC Reviewed Util 961114 Submittal (P-96096) Entitled, Fort St Vrain Final Emergency Response Plan, & Meets Requirements of 10CFR50.54(q) ML20128G1421996-09-25025 September 1996 Advises NRC Approved Decommissioning Plan, Impact Of... Fsv Final Decommissioning, Satisfies All Elements of License Termination Plan as Required by Rev to Reactor Decommissioning Rule 10CFR50.82(a)(9) ML20136B2561996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Falsification of Radiation Survey Records.Revised NOV Encl ML20136B2731996-04-0202 April 1996 Informs That NOV Issued on 951030 Revised to Reflect NRC Reanalysis of Info Re Util Failure to Assure Compliance w/10CFR50.9 Concerning Accuracy of Radiation Survey Records. Revised NOV Encl ML20136B3241996-04-0202 April 1996 Informs That NRC Will Be Withdrawing NOV ,based on Reevaluation of Evidence Provided & Response to NOV ML20058G9671993-12-0707 December 1993 Ack Receipt of Ltrs of 931110,responding to Notice of Violation & Proposed Imposition of Civil Penalty Issued on 931013 IR 05000267/19930021993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Deviations Noted in Insp Rept 50-267/93-02. Deficiency Determined to Have Contributed to 930527 Crane Overload Event IR 05000267/19930011993-09-0303 September 1993 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/93-01 ML20056G0041993-06-25025 June 1993 Submits Info Re Implementation of Training Rule 10CFR50.120 for Licensees of Plant in Decommissioning Process ML20128D6931992-12-0101 December 1992 Forwards Exemption from Requirement in 10CFR50,app E,Section IV.F.2 to Change to Biennial Emergency Plan Exercise Rather than Annual Following Completion of Next Scheduled Exercise. EA & SE Also Encl ML20198C7511991-06-25025 June 1991 Suggests That Region Iv/Senior Util Executive Conference Be Held During Month of Sept 1991 in Arlington,Tx to Provide Open Forum for Candid Discussions Limited to Topics of General Interest & Not Pertain to Plant Specific Issues ML20058K0231990-11-30030 November 1990 Forwards Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted ML20062H8131990-11-29029 November 1990 Forwards Partially Withheld Insp Rept 50-267/90-18 on 901022-26 & Notice of Violation ML20062H2041990-11-21021 November 1990 Forwards Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted ML20058J0121990-11-16016 November 1990 Forwards Insp Rept 50-267/90-20 on 901029-1102.Violations Noted But Not Cited IR 05000267/19900161990-10-30030 October 1990 Discusses Insp Rept 50-267/90-16 on 900928 & 901018 Enforcement Conference & Forwards Notice of Violation ML20062B3971990-10-15015 October 1990 Forwards Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted ML20058A0941990-10-12012 October 1990 Confirms 901018 Enforcement Conference in Region IV Ofc Re Violations & Radiation Program Weakness Noted in Insp Rept 50-267/90-16.Proposed Agenda Encl ML20059N8231990-10-0303 October 1990 Forwards FEMA Final Radiological Emergency Preparedness Exercise Rept, for 891115 Exercise.One Deficiency & Several Areas Requiring Corrective Actions Identified ML20059C1381990-08-24024 August 1990 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 900605 Application,For Info ML20056B4021990-08-20020 August 1990 Forwards Insp Rept 50-267/90-11 on 900601-0728.No Violations or Deviations Noted ML20058M8681990-08-0808 August 1990 Forwards Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Identified.Licensee Commitment to Revise Manual Dose Assessment Procedure to Incorporate Appropriate Unit Conversion Factor,Noted ML20056A3601990-07-31031 July 1990 Forwards Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Actions Taken Re Previously Identified Insp Findings & Status Examined ML20055J3951990-07-31031 July 1990 Ack Receipt of 900713 Request for Exemption from FY90 Annual Fee Requirements of 10CFR171.Annual Fee Will Not Be Billed ML20059D1281990-07-30030 July 1990 Ack Receipt of 900713 Request for Full Exemption from FY90 Annual Fee Requirements of 10CFR171 for Plant.Annual Fee Will Not Be Billed While Request Under Review ML20055G5921990-07-19019 July 1990 Agrees W/Removal of B Helium Circulator,Per Requesting NRC Concurrence.Solution to Correct Leakage Problem by Removal of Circulator Acceptable ML20055D2031990-06-26026 June 1990 Ack Receipt of 900525 Response to 900402 Emergency Preparedness Insp Rept & 900427 Notice of Violation ML20055C8021990-06-18018 June 1990 Concludes That Financial Info Forwarded by Meets Requirements of 10CFR140.21 ML20248H7751989-10-0303 October 1989 Forwards Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted IR 05000267/19890081989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-08. Understands That Revised Flow Test Surveillance Procedures Performed on 890821 & 0921 & cross-connect Valves Stroked IR 05000267/19890171989-10-0202 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/89-17. Implementation of Corrective Actions Will Be Examined During Future Insps ML20248B2971989-09-26026 September 1989 Forwards Insp Rept 50-267/89-16 on 890716-0831 & Notice of Violation IR 05000267/19890121989-09-22022 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violation Noted in Insp Rept 50-267/89-12 ML20247K9051989-09-19019 September 1989 Advises That 890726 Request for Approval of Route to Transport Spent Reactor Fuel Approved.Route,From Facility to DOE Inel in Idaho,Encl ML20247L1381989-09-19019 September 1989 Advises That Request to Delete Requirement to Provide Status Repts on Performance Enhancement Program Approved.Updated List of Commitments Encl 1998-07-20
[Table view] |
Text
C.
bCD p rerg g & UNITED STATES l g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20666 4 001 e
l k . . . . . ,o l July 17,1998, l
l Science Applications international Corporation Energy and Environment Group ATTN: Ms. Niza Strike Contract Representative 11251 Roger Bacon Drive Reston,VA 22090 l
SUBJECT:
MODIFICATION NO. 4 TO TASK ORDER NO. 27 ENTITLED " TASK AREA PO. 4 OF BASIC CONTRACT - FORT ST. VRAIN INSPECTION" UNDER CONTRACT NO. NRC-02-95-003
Dear Ms. Strike:
In accordance with Subsection G.4, Task Order Procedures, of the subject contract, this letter definitizes Modifciation No. 4 to Task Order No. 27 which: (1) increases the task order ceiling amount by $40,631.00 from $22,035.00 to $62,666.00, and (2) extends the period of performance from June 30,1998 to October 31,1998. The efforts are to be performed in accordance with the contractor's proposal dated June 24,1998 and the enclosed revisions to the Statement of Work.
The Task Order ceiling amount is $62,666.00, of which the sum of $58,024,00 represents the reimbursable costs and the sum of $4,642.00 represents the fixed fee.
Accounting data for Modification No. 4 to Task Order No. 27 is as follows:
B & R N o.: 85015122005 Job Code: J5073 BOC: 252A A P P N N o.: 31X0200 Obligate: $36,510.00 i
A summary of obligations for the subject task order, from award date through the date of this l action is given below:
4
- FY97 Obligation Amount: $22.,035.00 FY98 Obligation Amount: $36,510.00 Cumulative Total of NRC Obligations: $58,545.00 The obligated amount shall, at no time, exceed the task order ceiling. When and if the amount (s) paid and payable to the Contractor hereunder shall equal the obligated amount, the ,
Contractor shall not be obligated to continue performance of the work unless and until the
)
Contracting Officer shall increase the amount obligated with respect to this task order. Any work undertaken by the Contractor in excess of the obligated amount specified above is done so at the Contractor's sole risk.
- 7) f a L 9807240015 980720 PDR CONTR NRC-02-95-OO3 PDR ta ;
j
,_ - y- - - ____.-___ -___ --- __ _ ________ -----__ _ _ _ - _ _ __ _ _ _ _ _ _
NRC-02-95-003; Mod 4, TO27 The following individuals are considered essential to the successful performance of the work hereunder: Steven Mirsky and John Stokley. The Contractor agrees that such personnel shall not be removed from the effort under the task order without compliance with Contract Clause H.5, Key Personnel.
Your contacts during the course of this task are:
Technical Matters: Joe Shea, Technical Monitor (301)415-1428 Penelope Kinney, Project Officer (301) 415-7805 Contractual Matters: Joyce Fields, Contracting Officer (301) 415-6564 The issuance of this task order does not amend any terms or conditions of the subject contract.
Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three (3) copies of this document in the space provided below and retum two (2) copies to the U.S. Nuclear Regulatory Commission, ATTN: Ms. Joyce Fields, Division of Contracts and Property Management, T-712, ADM/DCPM/CMB2, Washington, D.C. 20555.
You should retain the third copy for your records. ,
Sincerely, G
J Fields, Contracting Officer Contract Management Branch No. 2 l Division of Contracts and i Property l Office of Administration l
l
Enclosure:
As stated ACCqPT D:
M NA@AMTRIKE vt h SENIOR CONTRACT REPRESENTATIVE TITLE 7O T(M NM DATE
PROJECT TITLE:
TECHNICAL ASSISTANCE IN THE REVIEW OF THE DEPARTMENT OF ENERGY APPLICATION FOR TRANSFER LICENSE OF THE FORT ST VRAIN ISFSI MATERIALS JOB CODE: J5073 TASK ORDER NUMBER:
B&R NUMBER: MODIFICATION TO TASK ORDER 27 6015122005 NRC ISSUING OFFICE: NMSS NRC PROJECT MANAGER (PM): PENNY KINNEY, (301) 415-7805 NRC TECHNICAL MONITOR (TM): JOE SHEA, (301) 415-1428 FEE RECOVERABLE: YES TAC NUMBER:
L22300 DOCKET NUMBER: 72-09
1.0 BACKGROUND
By letter dated December 16,1996, in accordance with 10 CFR Part 72, the Department of Energy (DOE) submitted an application for transfer of the existing Materials License for th St Vrain Independent Spent Fuel Storage installation (ISFSI). The Fort St Vrain ISFSI is a stand alone facility that houses spent fuel from the formerly licensed Fort St Vrain High Temperature Gas-Cooled Reactor. The NRC staff is performing a review of that applicat ensure the application meets the requirements of 10 CFR Part 72. The NRC staff will also perform inspections responsibilities as necessary of an NRC license. to verify the licensee's readiness to discharge the 2.0 OBJECTIVE A modification to the task is requested to revise the scope of work in order to obtain additional assistance in the preparation of the staff's safety evaluation report for the review of the DOE Fort St. Vrain license transfer application.
3.0 LEVEL OF EFFORT The level of effort is estimated at 10.5 professional staff weeks.
4.0 PERIOD OF PERFORMANCE The period 31,1998. of performance for the work specified in this SOW shall be extended until October i
. , u l
2 5.0 SCOPE OF WORK The contractor shall review specific portions of DOE's application and determine compliance with the requirements of 10 CFR Part 72. The review is a multi disciplinary activity culminating in a written record that will cleadv demonstrate the applicant's compliance with the requirements of 10 CFR Part 72. The final ststf report shall be in the form of a Safety Evaluation Report.
The contractor shall perform a review in accordance with NUREG-1567, " Standard Review Plan for Spent Fuel Dry Storage Facilities, Draft for Comment,
- October 1996. Specifically, the contractor shall perform a review in accordance with Chapters 2 (Site Characteristics), 3 (Design Criteria),7 (Installation Design and Structural Evaluation) and 8 (Thermal Evaluation) of the October 1996 revision of NUREG-1567.
The contractor shall perform the above review on the applicant's December 1996 Safety Analysis Report and December 10,1997 revision to the Safety Analysis Report. The contractor may draw on previous staff review of the Fort St Vrain ISFSI as documented in the Safety Evaluation Report which accompanied the Fort St Vrain ISFSI license by letter dated November 4,1991.
The contractor shall produce, upon completion of the review, a report that includes discrete sections corresponding to each of the SRP Sections listed above. Further, those discrete sections shall be prepared according to the outline presented in Appendix A-9 of the SRP. The report sections shall document the contractor's evaluation of the DOE FSV ISFSI SAR for compliance with the requirements of Part 72. The staff will use the contractor report to prepare the final safety evaluation of the license transfer application.
6.0 MEETINGS AND TRAVEL lt is anticipated that there may be one one-person trip to Rockville MD of one day duration excluding travel time.
7.0 SCHEDULE The required completion schedule is as follows:
Perform review of applicant's December August 21,1998 1996 SAR and December 1997 SAR Revision in accordance with Sections 2,3 7, and 8 of NUREG 1567, October 1996 Revision. Provide draft report for Sections 3 and 8 to the NRC.
Provide draft report for Section 2 and 7 to the NRC September 18,1998 Provide firial report, addressing NRC comments Two weeks from receipt of on draft report. written NRC comments which will be provided within two weeks of receipt of the draft .
report. I
l 3
8.0 DELIVERABLES Technical Reporting Requirements: The contractor will prepare draft and final reports, containing discrete sections corresponding to the outline in NUREG-1567, as further described in the discussion of " Specific Work Review Required" and ' Schedule" above.
9.0 NRC FURNISHED MATERIAL The Technical Monitor will provide the performing organization with pertinent documents needed for the work described in section 5.
10.0 MONTHLY STATUS REPORTS The contractor shall submit a technical and financial status reports in accordance with Sections F.3 and F.4 of the basic contract. The reports are due within 15 calendar days after the end of the month and copies shall be provided to the Project Manager, the Technical Monitor, the Director of PMDA/NMSS, and the Contracting Officer.
11.0 TECHNICAL DIRECTION Project Manager: Penelope Kinney Technical Monitor: Joseph Shea The NMSS PM is the focal point for all contract related activities. All work assignments and program funding actions are initiated by the NMSS PM who submits all requests to the Division of Contracts and Property Management (DCPM) for processing. All proposed work scope or schedule changes must be submitted through the NMSS PM for DCPM.
The NMSS TM is responsible for providing technical guidance to the performing organization regarding staff interpretations of the technical a ,pects of regulatory requirements, along with copies of relevant documents when requested by the performing organization. All work products must be reviewed and approved by the NMSS TM before they are submitted as final documents.
All technical directions given to the performing organization must be consistent with the work scope and schedule. The NMSS TM is not authorized to unilaterally make changes to the approved work scope or schedule or give the performing organization may direction that would increase costs over approved levels. The Contracting Officer is the only individual authorized to make changes to this task.
l l