{{#Wiki_filter:Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 Docket No. 50-508 October 21, 1983 G03-83-832 Director of Nuclear Reactor Regulation Attention: George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555
 
==Subject:==
SUPPLY SYSTEM NUCLEAR PROJECT N0. 3 TRANSMITTAL OF DRAFT ENVIRONMENTAL DOCUMENTS
 
==Reference:==
: 1) Letter (G03-83-443), G. D. Bouchey (Supply System) to G. W. Knighton (NRC), dated June 2, 1983
: 2) Letter (G03-83-704), G. C. Sorensen (Supply System) to G. W. Knighton (NRC), dated August 31, 1983 Please find enclosed, two (2) draft documents which were requested by NRC staff in the course of the environmental review of the subject project.
Our commitment to provide these reports was included in our response to staff question 291.23 which was attached to the Reference 1. This commitment was reiterated in the attachment to Reference 2.
The first document is a draft program for ecological studies which will be formally submitted to the Energy Facility Site Evaluation Council (EFSEC), for review and concurrence, thirty (30) months prior to fuel i
load. We have had working-level discussions with EFSEC staff regarding l    this plan and do not anticipate substantial revisions of the program as i    drafted. The ecological monitoring plan is in the form of a partial attachment to the WNP-3 Site Certification Agreement issued by EFSEC.
(
i The second document is the draft final report of fish bioassays which were conducted under Condition G29 of the WNP-3 NPDES permit.              This report has received only internal review and is now, concurrent with this transmittal, being circulated for external peer review. At the
!    conclusion of that review it will be finalized for formal submittal to l      EFSEC.
l l                                                                              ..
8310310149 831021 PDR ADOCK 05000508 A                  PDR
(
l L
 
George W. Knighton Page two Please contact D. W. Coleman, Licensing Project Manager at WNP-3 (206/482-4428, Ext: 5436), if you require additional information.
Very truly yours, jh            , uw G. C. Sorensen, Acting Manager Nuclear Safety and Regulatory Programs JPC:mm
 
==Enclosures:==
: 1. Draft Preoperational/ Operational Ecological Monitoring Program
: 2. Draft Bioassay Report cc: WC Albert, NRC D Smithpeter, BPA - 762 A Vietti, NRC w/ encl
_                _}}

Latest revision as of 06:18, 14 May 2020

Forwards Draft Ecological Monitoring Preoperational/ Operational Program & Draft Rept on Fish Bioassays: Toxicity of Copper,Zinc & Chemical Forms to Coho Salmon & Steelhead Trout in Chehalis River,Wa
ML20081C209
Person / Time
Site: Satsop
Issue date: 10/21/1983
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Knighton G
Office of Nuclear Reactor Regulation
Shared Package
ML20081C212 List:
References
GO3-83-832, NUDOCS 8310310149
Download: ML20081C209 (2)


Text

Washington Public Power Supply System 3000 George Washington Way P.O. Box 968 Richland, Washington 99352-0968 (509)372-5000 Docket No. 50-508 October 21, 1983 G03-83-832 Director of Nuclear Reactor Regulation Attention: George W. Knighton, Chief Licensing Branch No. 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

SUPPLY SYSTEM NUCLEAR PROJECT N0. 3 TRANSMITTAL OF DRAFT ENVIRONMENTAL DOCUMENTS

Reference:

1) Letter (G03-83-443), G. D. Bouchey (Supply System) to G. W. Knighton (NRC), dated June 2, 1983
2) Letter (G03-83-704), G. C. Sorensen (Supply System) to G. W. Knighton (NRC), dated August 31, 1983 Please find enclosed, two (2) draft documents which were requested by NRC staff in the course of the environmental review of the subject project.

Our commitment to provide these reports was included in our response to staff question 291.23 which was attached to the Reference 1. This commitment was reiterated in the attachment to Reference 2.

The first document is a draft program for ecological studies which will be formally submitted to the Energy Facility Site Evaluation Council (EFSEC), for review and concurrence, thirty (30) months prior to fuel i

load. We have had working-level discussions with EFSEC staff regarding l this plan and do not anticipate substantial revisions of the program as i drafted. The ecological monitoring plan is in the form of a partial attachment to the WNP-3 Site Certification Agreement issued by EFSEC.

(

i The second document is the draft final report of fish bioassays which were conducted under Condition G29 of the WNP-3 NPDES permit. This report has received only internal review and is now, concurrent with this transmittal, being circulated for external peer review. At the

! conclusion of that review it will be finalized for formal submittal to l EFSEC.

l l ..

8310310149 831021 PDR ADOCK 05000508 A PDR

(

l L

George W. Knighton Page two Please contact D. W. Coleman, Licensing Project Manager at WNP-3 (206/482-4428, Ext: 5436), if you require additional information.

Very truly yours, jh , uw G. C. Sorensen, Acting Manager Nuclear Safety and Regulatory Programs JPC:mm

Enclosures:

1. Draft Preoperational/ Operational Ecological Monitoring Program
2. Draft Bioassay Report cc: WC Albert, NRC D Smithpeter, BPA - 762 A Vietti, NRC w/ encl