{{#Wiki_filter:\~L NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3                                                             CHANGE TYPE:
* ' . ..,,,.. NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE: ON-THE-SPOT CHANGE ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS. *TEMPORARY (ORANGE) [XJ UNIT 1 PROCEDURENO.
~
__
                                                                                                                                                                *TEMPORARY ON-THE-SPOT CHANGE                                                                                               (ORANGE)
__
"......... *. ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.
REV. No. ____ o ____ CHANGE No._--'---
[XJ     UNIT 1         PROCEDURENO. __           ~\_'V_'D  __--~_\_8_._~~--c_o-"-5~~~--              REV. No. ____             o____  CHANGE     No._--'---
DSJ UNIT 2 PROCEDURE NO. ?.._ (->Q -\ 'C,
DSJ     UNIT 2         PROCEDURE NO.                 ?.._ (->Q -   \ 'C,
* i.\' CO 5 REV, NO. _ _,O..._ __ CHANGE NO._...;._
* i.\' CO 5               REV, NO. _             _,O...___ CHANGE NO._...;.__ _
__ PROPOSED CHANGE:
PROPOSED CHANGE:               tf\~e... 7. ~~-<!.f S.\           ~Os.\.*.    (s.R.   '4. '\}. ~\cc..:~            c. \,l\
: 7.
f\~~      \     &#xa3;~  -  -,
S.\ (s.R. '4. '\}.  
: s. a.,..\       (\~+          vv~<'<!..S ~      ~\ti',.._,    ~ c..
.. c. \,l \  
                                                                                                                    '     ..., c:i
\ s. a.,..\ c.. ' ..., c:i _.., , , --, "-' \.::> "' ' \ e. i' Ml Q.
                                                                                                                    \.::> " ' '
:  
                                                                                                                                      \
....,\<; ( &deg;SC'Vv&"-
: e. i' Ml ~ ~
\''f.I. I) *.... \ 1  
                                                                                                                                                        ~
<.'..\. S.l REASON FOR CHANGE: Sc c:;;;;:c \\,'c, h  
Q. ~v...~ *0..v : \enn:~ ....,\<;
&#xa3;\...v...\-
0
\)ou;:.t-.l  
( &deg;SC'Vv&"-     ~""-""''je....
\ ACTION TAKEN FOR OTHER UNIT: cs AUTHORIZATION:  
                  \''f.I.I) .... \ 1
**SIGNATURE ALSO VERIFIES THAT APPLICABILITY .TO BOTH UNITS HAS BEEN CONSIDERED.
                  \\~~I            $"<\.-~ <.'..\. S.l REASON FOR CHANGE:
            .                                                                                                                                            W\ \\              \:.~
  ..,,,..      Sc c:;;;;:c v....-r~ ~'f'w..;e* ~            \\,'c,-~ h \::\~~ ~\...- &#xa3;\...v...\-     \)ou;:.t-.l                                               l'.'.:*C \-
                                                                                                                                                          <i\s.'+x~l~~ .
                                                      \
ACTION TAKEN FOR OTHER UNIT:
cs p,~x..
AUTHORIZATION:                                                                                                                                 11),~Ja-k-r DdTE
              **SIGNATURE ALSO VERIFIES THAT APPLICABILITY .TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPTABLE:
ACCEPTABLE:
YES NO MEETING NO.
YES               NO MEETING NO.
I 7 f I I RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE. FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN: B3031605SS--830314 PDR ADOCK 05000272 S PDR PERFORMED BY: \ SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE. W\ \\ l'.'.:*C \-.
cg]~                                                                                                                              fht6fz_
r DdTE fht6fz_
I     7     f I             I                                                                                                 &#xa5;i2/~z...ATE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
ATE DATE FORM AP*l*t REV. 9 .
FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:
* * @; ' -* \..... NOTE: PRESS HARD YOU ARE MAKING FIVE (!5) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE PROCEDURE TITLE \<_e.s; CHANGE TYPE: rY1 PERMANENT D (GREENJ *EXPIRES:
B3031605SS--830314                                         \
BILITY TO BOTH UNITS. *TEMPORARY (ORANGEJ UNITt 1x1 UNITZ PROCEDURE NO. __
PDR ADOCK 05000272 S                               PDR PERFORMED BY:
____ . REV. NO. Q CHANGE NO. _ _._ __ PROCEDURENo.
SIGNATURE                                                           DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
__
FORM AP*l*t REV. 9 .
REV. NO. Q PROPOSED CHANGE:  
 
;J..5 s*-\-"'i'
NOTE: PRESS HARD YOU ARE MAKING FIVE (!5) COPIES ADMINISTRATIVE PROCEDURE 3 D
:5.:i... SS S'-\lo 6 d..\a -aC\ C.Y-.."""'.....,C\  
CHANGE TYPE:
"2...  
ON-THE-SPOT CHANGE                                                                         rY1 PERMANENT      *TEMPORARY
-\.\ "\ \B-=l..\-8 e, s -1.\ d-lc  
                                                                                                                                ~    (GREENJ        (ORANGEJ PROCEDURE TITLE \<_e.s;                                                                                                 *EXPIRES:
'2.\o S\."-f "\ '(,  
BILITY TO BOTH UNITS.
\"'\:) -8 REASON FOR CHANGE: ACTION TAKEN FOR OTHER UNIT: AUTHO"R IZATION:  
        ~    UNITt     PROCEDURE NO. _ _\:......;.~_b=-_-___;\_<t:'.,""'-._..\"""'-"'.-'o.._;c::;.*....;;s;;.___ _ _ _ . REV. NO. Q     CHANGE NO. _ _.__ _
**SUPERVISOR IN CHARGE L\ \le
1x1  UNITZ    PROCEDURENo. _ _=t---"'-"-~-S?-------\....;:~--*-~-'_...;;;.o~c~$-------- REV. NO.                           Q     CHANGE NO. _ _.__ _
\o -**SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH .UNITS HAS BEEN CONSIDERED.
PROPOSED CHANGE:
ACCEPTABLE:
                            ~ "-~e..      ;J..5         s*-\-"'i'   :5.:i... ~
POST CHANGE-REVIEW/APPROVAL YES NO D D MEETING NO. ls2_ 01 I RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE. FOLLOW*UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN: PERFORMED BY: SIGNATURE RETURN TO DEPARTMENT HEAC FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE. CHANGE NO. _ _._ __
C..\.-.~5~                SS       S'-\lo       6
/ TE CATE FORM AP*J-t REV, 9
                              ?~~~              d..\a       S-\-~ -aC\
* ** -** \..: .. .* PROCEDURE TITLE NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 ON-THE-SPOT CHANGE CHANGE TYPE: m PERMANENT D l3J (GREEN) *EXPIRES:
C.Y-.."""'.....,C\ "2...   ~'Si.  - \.\   ~ "\                                 ~:S  L\ \le
TY TO BOTH UNITS. *TEMPORARY (ORANGE)
                                                              \B- =l..\-8                                           "\~- -~+L\
[31UNIT2 PROCEDURE NO. _\ ........ \?_D ___
e, s -1.\ d-lc                                       ~S- ~''-\
....... *-0_0__..s:;;...._*
                                  ~f'o.~"L '2.\o                 S\."-f         "\ '(,
_____ REV. NO. __ o __ CHANGE No._.....__
REASON FOR CHANGE:
___ _ REV. No: __ o _____ CHANGE No. _ __.\ __ PROPOSED CHANGE:
Q..\-,,-..~L                \"'\:) ~ - 'l~ 8
s  
                                                                                                                  \o ACTION TAKEN FOR OTHER UNIT:
<\. \ J,_
AUTHO"R IZATION:   &kiJrn~
C.-c.-...;  
                                **SUPERVISOR IN CHARGE
.\-'f'c \.-REASON FOR CHANGE: *----'5  
        **SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH .UNITS HAS BEEN CONSIDERED.
<" $\...\ '&deg;"
ACCEPTABLE:                                       POST CHANGE-REVIEW/APPROVAL YES       NO D
s'-'*, \->r-c::; ......... ..... *C\J\
D MEETING NO.
ACTION TAKEN FOR OTHER UNIT: AUTHORIZATION:  
ls2_ I~
**SIGNATURE ALSO VERIFIES THAT APPL,ICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
01               I                                                                                                           .-,,1/z.~
ACCEPTABLE:
                                                                                                                                          /      TE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
YES NO D D MEETING NO. POST CHANGE-REVIEW/APPROVAL a
FOLLOW*UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN:
/I I I MANAGER* SALEM GENERATING STATION RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE. FOLLOW-UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN: PERFORMED BY: SIGNATURE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE. . ;""*-**,* DATE FORM AP-3*1 REV. 9
\.....
* SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATED PROCEDURE:
PERFORMED BY:
lPD-18.4.005  
SIGNATURE                                                     CATE RETURN TO DEPARTMENT HEAC FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
-RESPONSE TIME TEST OF SSPS LOGIC -R'EMARKS:
FORM AP*J-t REV, 9
Rx 'l'RIP ; TRAIN II B II
 
* EEO QA PERF. ENGR. SORC STA. SUPT. REV SUBMITTED APPROVED REVIEWED APPROVED REVIEWED APPROVED _  
        .*                                       NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3                                                                               CHANGE TYPE:
'7/'2.1/8'2.
D ON-THE-SPOT CHANGE                                                                             m l3J PERMANENT (GREEN)
-:!_ .A L..I.  
                                                                                                                                                                *TEMPORARY (ORANGE)
&#xa5;$ffl,-*-WA ... 0 i'i..  
PROCEDURE TITLE                                                                                                                  *EXPIRES:
"";v\. c .. n. " ' . * --*-**-*---**-*-**-*"'"*'!"':OC*-::-..,......-,..,..  
TY TO BOTH UNITS.
... ...-..-..  
        ~UNIT1        PROCEDURE NO. _ \........             \?_D___-~\__..4(?...._.='.......*-0_0__..s:;;...._*_ _ _ _ _          REV. NO. _ _  o__ CHANGE No._.....__
...............
[31UNIT2      PROCEDURENO.__;.;l.,.;__\)_..;~~--'..;......;~;:;_"l\.....:....._;:o~o.;;.....:S:::;.__ _ __                REV. No: _ _ o_____  CHANGE No. _ __.\_ _
_... ... -......... ......  
PROPOSED CHANGE: \>P..~<!.... \.~
..... *-*"--** --* **-----*---
                      ~Q..Q.        s ~~i'            <\. \ J,_
-----*.. ....__ ,-... J x * **
                                                                                                      ~v......_.,...,_{"        -\-c.."("\-1&deg;\\~~\.-S
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE . NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE --=l __ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -* Rx Trip, Train B 1.0 Purpose: 1.1 To obtain the response time from the Hagan bistable switches and other inputs through the SSPS Logic to the reactor trip breaker UV.coil. 1. 2 1. 3 To obtain the response from the UV coil to the opening of the reactor trip breakers
                                  \~\
                                                                                                    ...\.\.-..~    C.-c.-...; .\-'f'c \.- C,~.,,z_r'>A ~{
                                            '5 ~~~-u <" $\...\ ~ '&deg;"                 &#xa3;v....~ ~T".hsocJ s'-'*, \- >r- c::; . . . . . ~ ..... *C\J\ ~-er REASON FOR CHANGE:
**      ACTION TAKEN FOR OTHER UNIT:
AUTHORIZATION:
        **SIGNATURE ALSO VERIFIES THAT APPL,ICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.
ACCEPTABLE:                                             POST CHANGE-REVIEW/APPROVAL YES D
NO a~t/wLb___
D MEETING NO.
cru~                                                                                                                                    /f/:#~
              /I I               I                         MANAGER* SALEM GENERATING STATION
                                                                                                                                                    ~/;;jj~*
RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.
FOLLOW-UP TO REJECTED ON*THE*SPOT CHANGE
\..: ..
ACTION TAKEN:
PERFORMED BY:
SIGNATURE                                                             DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.
FORM AP-3*1 REV. 9
 
SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET                       SAFETY RELATED PROCEDURE:                                                                   lPD-18.4.005 - RESPONSE TIME TEST OF SSPS LOGIC -
R'EMARKS:                                                                   Rx 'l'RIP ; TRAIN                             II B II EEO                       QA         PERF. ENGR.               SORC     STA. SUPT.
REV                         SUBMITTED                                                           APPROVED                 REVIEWED         APPROVED           REVIEWED     APPROVED _
l!?JJ~ -:!_ yO!~ 1,~ ~JV....-~yz.:l
                                                                                                                                                                            ~  L..I. ~
I~A>r/ i'i.. ~..?-73 &#xa5;$ffl,-
                                                                                                                                                                        .A                                    *- WA ...
                                                                                            *ui.~                                '7/'2.1/8'2.
0            "";v\.                   c .. n.                                           ~/fl\
                                                                                                                                -~                                                                    lkrf/*-~ ... J
*-**-*---**-*-**-*"'"*'!"':OC*-::-..,......-,..,.. ......-..-.. ..............._......-......... ._~- . . . ....--~.....*-*"--** - -* **-----*--- --- -- *..
 
x
* SALEM GENERATING STATION                     NUMBER -     lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE        5/3/82 TEST PROCEDURE .
PAGE --=l__ OF 28 TITLE   RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* Rx Trip, Train B
 
==1.0 Purpose==
1.1   To obtain the response time from the Hagan bistable switches and other inputs through the SSPS Logic to the reactor trip breaker UV.coil.
: 1. 2 To obtain the response   tim~ from the UV coil to the
**                  1. 3 opening of the reactor trip breakers
* To be used in conjunction with other procedures for the total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.
* To be used in conjunction with other procedures for the total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.
2.0  
2.0  


==References:==
==References:==


2.1 2.2  
                                *~..-
... Performance Department Manual. Reactor Protectio'n System Logic Diagrams -221050 thru 221065. 2.3 Westinghouse Instruction Manual -Solid State Protection.  
2.Performance Department Manual.
2.2  Reactor Protectio'n System Logic Diagrams - 221050 thru 221065.
2.3 Westinghouse Instruction Manual - Solid State Protection.
2.4  Hagan Interconnection Diagrams - 220000 thru 220092 .
1111 c -001


===2.4 Hagan===
x lPD-18.4.005 SALEM GENERATING STATION                                                       NUMBER -
Interconnection Diagrams -220000 thru 220092 . 1111 c -001 x
REV. NO.              0 PERFORMANCE DEPARTMENT (I & C)
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TESTPROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE _2 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 3.0 Precautions:
DATE                   5/3/82 TESTPROCEDURE PAGE _2__ OF         28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B


===3.1 Special===
==3.0 Precautions==
care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.
3.1                     Special care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.
3.2 Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive
3.2                     Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive
* paper is wasted. 4.0 Limitations and Actions: 4.1 None stated *
* paper is wasted.
4.0                   Limitations and Actions:
4.1                     None stated
* I & C
* I & C
* 001 . . **.:*o..J--::**.-*r*_.**<."'!*;:**'""" ....  
* 001
.. -... . .; .. , , ..
        . .**.:*o..J--::**.-*r*_.**<."'!*;:**'""" .... "*'T.""**'*.**-*********~* .. - ... -~-        . ~ .; .. , , ..
 
x
x
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO.
* SALEM GENERATING STATION                                                                                                 NUMBER -     lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)                                                                                          REV.NO.   ~O~~~~~~~
DATE 5/3/82 PAGE 3 OF 28 ---TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B *
DATE         5/3/82
* I & C -001 5.0 Test Equipment:
                                                                                                                                                  ~~~~~~~~
Device Visicorder Model 1912 Test Leads & Jumpers Test Resistor for Hagan Input Signals . Toggle Switches (4) Latern Type 6VDC Battery (2) or Equiv. *** -* ., ..,.-* ** * "<'".; '*' '-.r,*.,-***,-*  
TEST PROCEDURE PAGE
\ ...
                                                                                                                                                    - OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
__ .,,.-.,._,, ,. ,**r-* *",-* ** "'"* *** *
Rx Trip, Train B 5.0               Test Equipment:
* PD No. Recal. D*ate N/A N/A N/A N/A N/A N/A N/A N/A x * *
Device
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMSER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx. Trip, Train B 6.0 Prerequisites:
* PD No.        Recal. D*ate Visicorder Model 1912 Test Leads & Jumpers                                                                       N/A              N/A Test Resistor for Hagan Input Signals                                                                       N/A              N/A
6.1 The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6). Senior Shift Supervisor/Shift Supervisor Date/Time 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.
                                    . Toggle Switches (4)                                                                         N/A              N/A Latern Type 6VDC Battery (2) or Equiv.                                                                     N/A              N/A I & C - 001
Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The individual assigned to perform this procedure is qualified-to do so in accordance with the Solid State Protection System Qualification Card
  *** -   * ., ..,.-*** * "<'".; '*' '-.r,*.,-***,-* -~'"* \ ... *-~-,* __ .,,.- .,._,, ~ ,. ,**r-* *",-* ** "'"* *** * ~ ~
* Job Supervisor I & C -001 ** * ** -... *,** .... -. * * ,,_ .. !""_,,..  
 
**:r-.... ,.----.. ---*--. . . . *' ...... .. -._,. .. * .. **-** . ....... . . -..
x SALEM GENERATING STATION                                                                                             NUMSER -                         lPD-18.4.005 REV. NO.                          0 PERFORMANCE DEPARTMENT (I & C)
X' * *
DATE                              5/3/82 TEST PROCEDURE PAGE ~4~- OF           28 TITLE                     RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE  
Rx. Trip, Train B
.. NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE -"'5 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx.Trip, Train B 6.0 Prerequisites: (Continued) 6.4 The Control Operator responsible for the portion of the plant to be tested is aware of all the alarms and cations which will be affected by the i?erformance of this procedure.
 
Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant Pressure read from the Loop Hot Leg Indication, Pressurizer Level from the Cold Calibration Channel . Indication, and Steam Generator Level from the Wide Range Indication.
==6.0 Prerequisites==
Control Operator 6.5 Have the Control Operator place the pressurizer level controller in Manual. Control Operator 6.6 Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions
6.1                     The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6).
Senior Shift Supervisor/Shift Supervisor Date/Time 6.2                     The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.
Senior Shift Supervisor/Shift Supervisor Date/Time 6.3                     The individual assigned to perform this procedure is qualified- to do so in accordance with the Solid State Protection System Qualification Card *
* Job Supervisor I & C -001
        ** * ** - ... ~ *,** .... -. * * ,,_ .. !""_,,.. *;~-**. **:r- .... ,.- -- -.. ---*-- . . . . *' ...... .. -       ._,. .. *.. **-** . ....... .. ~;, - ..
 
X'
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV. NO.
DATE lPD-18.4.005 0
5/3/82 PAGE -"'5__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx.Trip, Train B
 
==6.0 Prerequisites==
(Continued) 6.4   The Control Operator responsible for the portion of the plant to be tested is aware of all the alarms and indi-cations which will be affected by the i?erformance of this procedure. Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant Pressure read from the Loop Hot Leg Indication, Pressurizer Level from the Cold Calibration Channel
                        . Indication, and Steam Generator Level from the Wide Range Indication.
Control Operator 6.5   Have the Control Operator place the pressurizer level controller in Manual.
Control Operator 6.6   Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions *
* Job Supervisor I & C
* Job Supervisor I & C
* 001 x .. * *
* 001
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER-REV. NO. 0 DATE 5/3/82 PAGE OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 7.0 System Line-up: 7.1 None stated
* I & C -001 *r ' . * .* ., ,* ** . ' * . * * ** ---
x *
* c. ** SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE*
OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 8.0 Instructions:
8.1 Lift the following leads at the NIS cabinet: 8.1.1 Rack 78 -TB123-l 8.1.2 Rack 79 TB223-l (.s.R, \.\, '-'. \oc. 't:... T) 8.2 Install a jumper across TB507-4 and TB507-5 in both Train A and Train B. C \.. . -.-, .
* c*1-, ,
Y1\I\.'\
.._1:.."'j \..:, C\-
oQ r .,a..__, *
''-*TY't"\\1\i
.:::;; G
-\<.. 1c:,...c\
&deg;T"-T-m:'N'A.\....
'll;li;;..
C\ 0Q\.'-.'("C..,._
\:>-,.\-'$\.,....,,,,' ?-.\,.:1,_.l'M)


===8.3 Place===
.. x SALEM GENERATING STATION                    NUMBER- __;l=P_D_-~1~8~*~4~*~0~0~5~
the Input Error Inhibit switch for Train A in the "Inhibit" position.  
PERFORMANCE DEPARTMENT (I & C)
REV. NO.                            0 DATE                                5/3/82 TEST PROCEDURE PAGE _.;..6~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B 7.0  System Line-up:
7.1  None stated
* I & C - 001
                                                    *r ' . * .* ., ,* ** . ' * ~ *~ . * * **


===8.4 Place===
x SALEM GENERATING STATION                                                                                                                                NUMBER -                  lPD-18.4.005 REV. NO.                0 PERFORMANCE DEPARTMENT (I & C)
the Train B Mode Selector switch in the position.
DATE                      5/3/82 TEST PROCEDURE PAGE* _..7~- OF                            28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B
 
==8.0 Instructions==
Initial 8.1                        Lift the following leads at the NIS cabinet:
8.1.1                                          Rack 78 - TB123-l 8.1.2                                          Rack 79                  TB223-l
(.s.R, \.\, '-'. ~ \oc. 't:... ~v-T)
* c.
8.2                        Install a jumper across TB507-4 and TB507-5 in both Train A and Train B.
C
                                                                                                                                  ~~ 'c~:
                                                                                                                                            \.. .
                                                                                                                \..:, C\- \J;:)~\'~<;;; ~ \1~~.,.;::i-
                                                                                                                                                            -.-, . *        ~
                                                                                                                                                              , '"''{""'""'~\~ Y1\I\.'\    lo~ eN~""j~"L~~- ~s*e oQ r .,a..__,
                                                                                                                                                                                    ~=le.:*.,..,-*
                                                                                                                                                                                                                        /~:<;*,,.pC...
                                                                                                                                                                                                            ''-*TY't"\\1\i ~\.--
                                                                                                                                                                                                                                ~c c*1-,
                                                                                                                                                                                                                                            .._1:.."'j ~-
A G \~~.-~ -          \<.. 1c:,...c\    &deg;T"-T-m:'N'A.\....    'll;li;;.. C\                B 0Q\.'-.'("C..,._ ~~,..,;,~,.:>- ~'j~ \=\~~                                                  \:>-,.\- '$\.,....,,,,' "0*~-.-.1 ~~~ ?-.\,.:1,_.l'M) 8.3                        Place the Input Error Inhibit switch for Train A in the "Inhibit" position.
8.4                        Place the Train B Mode Selector switch in the
                                                                                                ~Test"                            position.
8.5
8.5
* Clear all Reactor Trip Signals by installing test jumpers or resistors as specified in Table I. *8.6 Connect Visicorder Channel 1 to the output terminals.
* Clear all Reactor Trip Signals by installing test jumpers or resistors as specified in Table I.
of the Bistable Switch under test as shown in Table 2 (115 VAC)
                                                                *8.6                           Connect Visicorder Channel 1 to the output terminals.
of the Bistable Switch under test as shown in Table 2
**                                                                                            (115 VAC)
* I & C
* I & C
* 001 ., .*. *-*. .. * ........ -...  
* 001
'-"""'.-
., .*. *-*. .. *........ -... *.*~:: '-"""'.- ~;r.~:':'*... *?<*:*:~..-.* *:?. :***,.*:~ .... -.- .... : ... ---... *----.:-- ~ *-** - *** - *. --.. - -~-;- ~
...  
*:?.  
.... -.-.... : ... ---... *----.:--*-** -*** -*. --.. -Initial A B x ** *
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE OF 28 TITLE RESPONSE TIME -TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip,* Train B 8.0 Instructions: (Continued)


===8.7 Connect===
Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in the SSPS Train B Output*Cabinet.
8.8 8.9 Place the coincident bistable switch or switches as listed in Table 2* to the TRIP position
* Adjust the visicorder to obtain a good quality step function trace. 8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY. 8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.
Initial 8.12 Stop the visicorder after the UV coils are de-energized.
Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value. Label all visicorder traces, and store visicorder paper for future reference
* 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4. I & C -001 . *,
x
x
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE __;;_9 __ OF 2 8 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued) 8.14 For 5 through 48 in Table 2, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch *to the Detector A and B position on power range drawers N41 and N42 and increase wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE light energizes
**        SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* (Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when power range* test signals are above the P7 perI!lissive and reset the rate trip as necessary.)
TEST PROCEDURE NUMBER -
8.14.1 . 8.14.2 For Steps 25 through 36, connect channel 3 of the visicorder to coil contacts 5 and 6 on K633. For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634. NOTE: The UV Coil will remain de-energized for this step. 8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36. I & C
REV. NO.
* 001 Initial x .. * * ** SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. lPD-18.4.005 0 DATE PAGE 10 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip,* Train B B.0 Instructions: (Continued)
DATE lPD-18.4.005 0
B.16 For Steps 37 through 4B in Table 2, the PB permissive must pe present. Actuate PB by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase (clockwise) the Detector A and Detector B Test Signal 'until the POWER RANGE PB PERMISSIVE light energizes. (Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when .the power range test signals are above the P7 permissive and reset the rate trip as necessary.)
5/3/82 PAGE -=8~- OF 28 TITLE RESPONSE TIME -TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
B.17 Repeat Step 8.6 through 8.12 for the bistablesas indicated in Table 2, Steps 37 through 48. B.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase . .
Rx Trip,* Train B
* the Detector A and Detector B Test Signal* until the POWER RANGE PlO PERMISSIVE light energizes. (Note: Depress BLOCK POWER .RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test signals are above the P7 permissive and reset the rate trip as necessary.)
 
==8.0 Instructions==
(Continued)                                   Initial 8.7  Connect Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in the SSPS Train B Output*Cabinet.
8.8  Place the coincident bistable switch or switches as listed in Table 2* to the TRIP position
* 8.9  Adjust the visicorder to obtain a good quality step function trace.
8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY.
8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.
8.12 Stop the visicorder after the UV coils are de-energized.
Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value. Label all visicorder traces, and store visicorder paper for future reference *
* 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4.
I & C -001
    ~
 
x SALEM GENERATING STATION                   NUMBER-     lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)
DATE         5/3/82 TEST PROCEDURE                                PAGE __;;_9__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B
 
==8.0 Instructions==
(Continued)                                     Initial 8.14 For St~ps 5 through 48 in Table 2, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch *to the Detector A and B position on power range drawers N41 and N42 and increase (clock-wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE light energizes *
(Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when power range* test signals are above the P7 perI!lissive and reset the rate trip as necessary.)
8.14.1    For Steps 25 through 36, connect channel 3 of the visicorder to coil contacts 5 and 6 on K633.
                      . 8.14.2    For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634.
NOTE:  The UV Coil will remain de-energized for this step.
8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36.
I & C
I & C
* 001 Initial x * *
* 001
* NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE PAGE-11 OF 28 TITLE RESPONSE TIME-TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 8.0 (Continued) 8.19 CAUTION: Terminals may be energized (115VAC).
 
Connect channel 3 of visicorder to coil contacts 5 and 6 on Short terminal 1 to 5 on A.R. timer. 1 8.20 Disconnect the field wires connected to the terminals in Table 3, Steps 37 through 40
.. x SALEM GENERATING STATION                    NUMBER -       lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
* 8.21 Connect a toggle 'switch across each terminal. (Toggle switch in OFF position will produce a trip.) 8.22 Connect visicorder channel 1 across the terminals.
DATE        ~=5~/3=-<....;/8=2,._~~~
8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40. (For a coincident channel trip, place the toggle switch to OFF.) 8.24 Remove the" toggle switches from of Table 3, Steps 37 through 40 and reconnect the field wires. 8.25 Disconnect the field wires connected to the terminals listed in Table 3, Steps 41 through 44. 8.26 Connect a toggle switch across each terminal. (Toggle switch in OFF position will produce a trip.) '8.27 Connect visicorder Channel 1 across the terminals.
TEST PROCEDURE PAGE     10    OF     28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip,* Train B B.0   Instructions:      (Continued)                                             Initial B.16 For Steps 37 through 4B in Table 2, the PB permissive must pe present. Actuate PB by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase (clockwise) the Detector A and Detector B Test Signal 'until the POWER RANGE PB PERMISSIVE light energizes.         (Note:
Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when .the power range test signals are above the P7 permissive and reset the rate trip as necessary.)
B.17 Repeat Step 8.6 through 8.12 for the bistablesas indicated in Table 2, Steps 37 through 48.
B.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42.
Increase
                                                                              .(cloc~wise)
* the Detector A and Detector B Test Signal* until the POWER RANGE PlO PERMISSIVE light energizes.         (Note:
Depress BLOCK POWER .RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test
**                          signals are above the P7 permissive and reset the rate trip as necessary.)
I & C
I & C
* 001 Initial I*--x ..
* 001
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -* lPD-18. 4. 005 REV.NO.
 
DATE PAGE 12 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued) 8.28 Repeat Steps 8.7 through 8.12 for Table 3, Steps 41 through 44. (For a coincident channel trip, place the toggle switch to OFF.)* 8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the Initial
x SALEM GENERATING STATION                  NUMBER -     lPD-18.4.005 REV. NO.     0 PERFORMANCE DEPARTMENT (I & C)
DATE          5/3/82 TEST PROCEDURE PAGE-  11  OF  28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B 8.0  Instruction~:  (Continued)                                      Initial 8.19 CAUTION:  Terminals may be energized (115VAC).      Connect channel 3 of visicorder to coil contacts 5 and 6 on K632~  Short terminal 1 to 5 on A.R. timer.
1 8.20 Disconnect the field wires connected to the terminals liste~ in Table 3, Steps 37 through 40 *
* 8.21 Connect a toggle 'switch across each terminal.
(Toggle switch in OFF position will produce a trip.)
8.22 Connect visicorder channel 1 across the terminals.
8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40.  (For a coincident channel trip, place the toggle switch to OFF.)
8.24 Remove the" toggle switches from termin~ls    of Table 3, Steps 37 through 40 and reconnect the field wires.
8.25 Disconnect the field wires connected to the terminals listed in Table 3, Steps 41 through 44.
8.26 Connect a toggle switch across each terminal.      (Toggle
* switch in OFF position will produce a trip.)
                '8.27 Connect visicorder Channel 1 across the terminals.
I & C
* 001
 
I*--
    .. x SALEM GENERATING STATION                  NUMBER -
* lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)            REV.NO.   ~O"--~~~~~~
DATE       --=5~/~3~/~8~2~~~~
TEST PROCEDURE PAGE   12   OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B
 
==8.0 Instructions==
(Continued)                                       Initial 8.28 Repeat Steps 8.7 through 8.12 for Table 3, Steps 41 through 44.   (For a coincident channel trip, place the toggle switch to OFF.)*
8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the
* field wires.
* field wires.
* I & C -001 NOTE: For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the .Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the trip light energizes on the drawer. 8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test. Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55. 8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56
NOTE:   For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the .Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the requir~d  trip light energizes on the drawer.
* x * *
: 8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test.       Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55.
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued)
8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56
: 8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged: No *. 11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power* Supply M-G Breaker on No. lG 460 VAC bus
* I & C -001
 
x SALEM GENERATING STATION                                                                                             lPD-18.4.005 NUMBER -
REV. NO.            0 PERFORMANCE DEPARTMENT (I & C)
DATE               5/3/82 TEST PROCEDURE PAGE   13   OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -
Rx Trip, Train B
 
==8.0 Instructions==
(Continued)                                                     Initial
: 8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged:                   No *.11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power*
Supply M-G Breaker on No. lG 460 VAC bus *
* Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.
* Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.
Connect the spare conductors of cable RP364-BT (located in the bypass breaker terminal cabinet) to TB7 terminals 11 & 12 in the Trip Breaker terminal cabinet. 8.35 Connect the spare conductors of cable RP364-BT (located in the SSPS Train B Logic Cabinet) to the visicorder. (Note: In series with one conductor, connect a 6VDC latern-type battery.)
8~34          Connect the spare conductors of cable RP364-BT (located in the bypass breaker terminal cabinet) to TB7 terminals 11 & 12 in the Trip Breaker terminal cabinet.
Initial I & C -001 -.  
8.35 Connect the spare conductors of cable RP364-BT (located in the SSPS Train B Logic Cabinet) to the
.. .. .... -.... ,,, ... _.,,_ .. -.********-***"*  
* visicorder.
****** .... _______ *::.....*
connect a 6VDC latern-type battery.)
x (_ * *
(Note:        In series with one conductor, I & C - 001
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE
    -. **::.****-.:-,***,*:~"'**::: .   .
-. NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE. 14 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM Rx Trip, Train B 8.0 Instructions: (Continued)
                                      ~- ~,, ....-.... ,,,..._.,,_..-.********-***"* ****** . . . . _______     *::.....*_.....:....___,___~-------------
Initial 8.36 Close Reactor Trip Breaker B from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 56. To close the trip breaker, place *the Mode Selctor Switch in Operate. Response Time of Reactor*Trip Breaker B 8.37 Remove the connections made in Step 8.33. Place the Mode Selector Switch in Test. 8. 38 CAUTION: Terminals may be energized
 
_( llSVAC) Disconnect the field wires connected to the terminals listed in Table 3, Steps 57 through 59.
x (_
8.39 Connect a toggle switch across each terminal. (Toggle switch in OFF position will produce a trip.) 8.40 Connect visicorder Channel 1 across the terminals.
SALEM GENERATING STATION                       NUMBER -     lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59. (For a coincident channel trip, place the toggle switch to OFF.) 8.42 Remove the toggle switches from the terminals of Table 3, Steps 57 through 59 and reconnect the field wires. I & C -001 x .. * *
DATE        5/3/82 TEST PROCEDURE                                    PAGE. 14   OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC*-
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO.
Rx Trip, Train B
DATE 5/3/82 PAGE 15 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM* LOGIC -Rx Trip, Train B 8.0 Instructions: (Continued) 8.43 Disconnect the field wires connected to the terminals listed in Table 3, Steps 60 through 63. 8.44.Connect a toggle switch across each terminal. (Toggle switch in OFF position will produce a trip.) 8.4.5 Connect visicorder Channel 1 across the terminals.
 
8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63. (For a coincident channel trip, place the toggle switches to OFF.) 8.47 Remove the toggle switches from terminals of Table 3, Steps 60 through 63 and reconnect the field wires
==8.0 Instructions==
(Continued)                                       Initial 8.36 Close Reactor Trip Breaker B from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 56.
To close the trip breaker, place *the Mode Selctor Switch in Operate.
Response Time of Reactor*Trip Breaker B 8.37 Remove the connections made in Step 8.33.           Place the Mode Selector Switch in Test.
: 8. 38 CAUTION: Terminals may be energized _( llSVAC)
Disconnect the field wires connected to the terminals listed in Table 3, Steps 57 through 59.
                                      -~
                                        ~*:r:
8.39 Connect a toggle switch across each terminal.
(Toggle switch in OFF position will produce a trip.)
8.40 Connect visicorder Channel 1 across the terminals.
8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59.     (For a coincident channel trip, place the toggle switch to OFF.)
* 8.42 Remove the toggle switches from the terminals of Table 3, Steps 57 through 59 and reconnect the field wires.
I & C -001
 
.. x SALEM GENERATING STATION                 NUMBER -     lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)            REV.NO.   ~O~~~~~~~
DATE         5/3/82
                                                                  ~~~~~~~~
TEST PROCEDURE PAGE   15   OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM* LOGIC -
Rx Trip, Train B
 
==8.0 Instructions==
(Continued)                                     Initial 8.43 Disconnect the field wires connected to the terminals listed in Table 3, Steps 60 through 63.
8.44.Connect a toggle switch across each terminal.       (Toggle switch in OFF position will produce a trip.)
* 8.4.5 Connect visicorder Channel 1 across the terminals.
8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63.   (For a coincident channel trip, place the toggle switches to OFF.)
8.47 Remove the toggle switches from terminals of Table 3, Steps 60 through 63 and reconnect the field wires
* I & C
* I & C
* 001 Initial x * *
* 001
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 16 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 9.0 Return To Normal: 9.1 Remove visicorder Channels 1 through*3 from the SSPS Equipment Cabinets.


===9.2 Remove===
x
test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I
* SALEM GENERATING STATION                  NUMBER-'-    lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
* 9.3 Remove test equipment and jumpers from reactor trip breaker terminal cabinet. 9.4 Return NIS power range drawers to normal and clear any associated alarms. 9.5 Place the Input Error Inhibit switch for Train B in "Inhibit".  
DATE          5/3/82 TEST PROCEDURE PAGE  16  OF  28 TITLE  RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B 9.0  Return To Normal:                                              Initial 9.1  Remove visicorder Channels 1 through*3 from the SSPS Equipment Cabinets.
9.2   Remove test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I
* 9.3   Remove test equipment and jumpers from reactor trip breaker terminal cabinet.
9.4   Return NIS power range drawers to normal and clear any associated alarms.
9.5   Place the Input Error Inhibit switch for Train B in "Inhibit".
9.6  Place the Mode Selector switch for Train B in the "Operate" position
* I& c* - 001


===9.6 Place===
  .x
the Mode Selector switch for Train B in the "Operate" position
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* I & c* -001 Initial 
TEST PROCEDURE NUMBER -
.x * *
REV.NO.
* I Iii C
DATE PAGE lPD-18. 4. 005
* 001 SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO.
____;O~~~~~~
DATE PAGE 17 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 9.0 Return To Normal: (Continued)  
___;;5~/~3~/8~2;;__~~~
17             OF           28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B 9.0             Return To Normal:                                       (Continued)                                                                                                 Initial 9.7              Initiate the Safety Injection Blocks*for both TRAIN A and TRAIN B from the Control Bezel.
Stearn Line S.I. Block A
* Pressurizer S.I. Block B
A B
9.8              Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.
                                                                                      *                      *                                                  '          /.J..j1:z.S".;.., ~ n c.~~-"-o~ ~ \"""-:\1,""''&deg;N*\.\::.                    "'f\T-'\  ~.:... ~,-.:;<!~*':)''-'"-~ ~ *; c ~c ;"'-                                  A C\.&#xa3;.\
* Re.c.cv...>n.:i I!.'--'\- '-.::i~ ..... <_;                  :        \'.:\ ,,.~*,~      --  o~?> \..?~...u, '"''-<t<\~w~*1-.~              e B
El \n:..~,..;;, -      \<._ li"J....C\  Tet"r"'~N~\...*'l:r-.L\
9.9              Remove the jumper from TB507-4 and TB507-5 in both TR~IN A and TRAIN B.
9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT .
*                                                                                                                                                                                                                  /
I Iii C
* 001
_ _*_*'_:._** ... *.*::"*~-*-* ,, ...,,.,.:
                                                                                              *****~-'*--_            .. *_~


===9.7 Initiate===
                                                                                                            ~  : '*
the Safety Injection Blocks*for both TRAIN A and TRAIN B from the Control Bezel. Stearn Line S.I. Block Pressurizer S.I. Block 9.8 Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.  
x
* * ' /.J..j1:z.S".;.., n \"""-:\1,""''&deg;N*\.\::.  
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
"'f\T-'\ *; c ;"'-C\.&#xa3;.\
TEST PROCEDURE NUMBER -
* Re.c.cv...>n.:i I!.'--'\-
REV. NO.
..... <_; : \'.:\  
DATE PAGE lPD-18.4.005 0
--. ..u, e El
5/3/82 18            OF          28 TITLE                        RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
-\<._ li"J....C\
Rx Trip, Train B 9.0                      Return To Normal:                                                    (Continued)                                                                                                  Initial 9.11 Reconnect the Leads lifted at the following locations:
9.11.1                            NIS Rack 78, TB 123-1 .
9.11.2                            NIS Rack 79, TB 223-1
* C\.\~                        i+
S~\:~ \.~ Iv-.; ~-c.C ~\CN
                                                          - ~n,~~'"'....._\s
                                                                                        \-"'-.~              5-y;,\:\-
                                                                                                              ~ ~'N~ ~
                                                                                                                              ~
                                                                                                                              \.\cc_\l--..
t f . ._, \i \ s 1:'
C:\'..\      \~
l-          \..>-J -M.~o,j \.. ~
                                                                                                                                                        \e_ \ N-:O ~\.. ~ .-C.-L 0
                                                                                                                                                          'Ce'' c.s\;o;\\~ ~-)
                                                                                                                                                                      \           P-.-;-..;,i i
                                                                                                                                                                                                        -\-"'  '<!_.
                                                                                                                                                                                                          ')....,.,.,.,~,.;.\
v,.\l.*<i<::...    ~\r,.~
Cc"'.:;-\~c \-. 0                          \H,. r-.f** ~c'<      d:< ~**n.s,.                      \,\""o.J.L            ~ .~. ~s-.:..\-
I & C - 001
      - ***.****-*,.*..o:*.****":"-,-.- *.--~*~~---***.---- .. -.... **-~---........... - ' ___ ,, - -.* ~---**
                                                                                                                                                                      -~-    -~


===9.9 Remove===
x SALEM GENERATING STATION               NUMBER -     lPD-18.4.005 REV. NO.     0 PERFORMANCE DEPARTMENT (I & C)
the jumper from TB507-4 and TB507-5 in both A and TRAIN B. 9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT . Initial A B A B A B / **-* . . . ..... ** .. -* .. *;*** *.; .. -. __ *_* '_:._** ... _ ...
DATE         5/3/82 TEST PROCEDURE PAGE   19   OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
,, ... ,,.,.: .. --.,--.... -. ,. ... ' ..... *--.... --.......
Rx T~ip, Train B 10.0 Remarks:                           I.O
..... _ .. _ ... .:__ .. ___ ::_____...:.:......:.._--'--------------
x * * * : '* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 18 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B 9.0 Return To Normal: (Continued) 9.11 Reconnect the Leads lifted at the following locations:
9.11.1 NIS Rack 78, TB 123-1 . 9.11.2 NIS Rack 79, TB 223-1 i+ Iv-.;
t <;. '--'-f .... _, \i \ s 1:' l-\..>-J -M.
\.. -\-"' '<!_. \e_ \0 N-:O .-C.-L ' i ' \.\cc_\l--..
'Ce'
-C:\'..\ \ P-.-;-..;,i v,.\l.*<i<::...
\-. 0 \H, .. r-.f**
d:<
\,\""o.J.L
-------------------------I & C -001 -***.****-*,.* . .o:*.****":"-,-.-
*.
.. -....
...........
-' ___ ,, --.*
...............
., .... ... Initial x * *
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 19 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Train B 10.0 Remarks: I.O
* 11.0 Completion:
* 11.0 Completion:
11.1 Completed Technician
11.1 Completed By:~~~~~~~~
* Date Time 11.2 Approved By:
Technician
Date Time I & C -001 I x * *
* Date         Time
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO. _o ______ _ DATE 5/3/82 PAGE 20 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B. TABLE I A. Test Resistors installed in the following Test Jacks and the CT switch placed in TEST: I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2 TJ-412-1 Rack 2 TJ-421-1 Rack 6 TJ-422-1 Rack 6 TJ-431-1 Rack 13 TJ-432-1 Rack 13 TJ-441-1 Rack 15 TJ-442-1 Rack 15 NOTE: To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks. II. REACTOR COOLANT FLOW TJ-414 Rack 3 TJ-424 Rack 3 TJ-415 Rack 7 TJ-425 Rack 7 TJ-416 Rack 12 TJ-426 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack l TJ-456 Rack 10 IV. STEAM GENERATOR LEVEL TJ-517 Rack 31 TJ-527 Rack 31 TJ-518 Rack 11 TJ-528 Rack 11. TJ-519 Rack 8 TJ-529 Rack 4 TJ-434 *Rack 3 TJ-435 Rack 7 TJ-436 Rack 12 TJ-457 Rack 12 TJ-537 Rack 31 TJ-538 Rack 11 TJ-539 Rack 4 TJ-444 Rack 3 TJ-445 Rack 7 TJ-446 Rack 12 TJ-474 Rack 14 TJ-547 Rack 31 TJ-548 Rack 11 TJ-549 Rack 8 I & C
* 11.2 Approved By: ~~~~~~~~-
* 001 x * *
Date         Time I & C -001 I
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 21 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE I (Continued)
 
B. Install the following Jumpers in SSPS INPUT RELAY BAY: I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2 TB-308-1 to TB-308-2 II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4 TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9 to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C
x
* 001   
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
.X
TEST PROCEDURE NUMBER -
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV. NO. 0 --------DATE 5/3/82 _ _,___ _________
REV.NO.
_ PAGE 22 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL OVERTEMPERA TURE DELTA T 1 BS-411C 2 TB 1-11&12 BS-441C 15 2 BS-421C 6 TB 2-5&6 BS-441C 15 3 BS-431C 13 TB 3-3&4 BS-441C 15 .4 BS-441C* 15 TB 3-3&4 BS-431C 13 ESSURIZER PRESSURE/LOW (ABOVE P7) 5 BS-455C 1 TB 1-7&8 BS-474A 14 6 BS-456C 10 TB 2-9&10 BS-474A 14 7 BS-*457C 12 TB 4-1&2 BS-474A 14 8 BS-474A 14 3-1&2 BS-457C 12 PRESSURIZER PRESSURE HIGH 9 BS-455A
DATE PAGE lPD-18. 4. 005
* 1 TB 1-1&2 BS-474C 14 10 BS-45 fiA 10 TB 2-3&4 BS-474C 14 11 BS-457A 12 TB 3-7&8 BS-474C 14 12 BS-474C 14 TB 2-11&12 BS-457A 12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8) 13 BS-414 3 TB 2-7&8 BS-416 12 *BS-424 3 BS-425 7 -14 BS-415 7 TB 2"".'7&8 BS-416 12 BS-424 3 BS-425 7 .5 BS-416 12 TB 2-3&4 BS-414 3 BS-424 3 BS-425 7 I & C -001 -  
_o_______
5/3/82
                                                                ~~~-----
20   OF   28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B.
TABLE I A. Test Resistors installed in the following Test Jacks and the CT switch placed in TEST:
I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2     TJ-421-1 Rack TJ-431-1 Rack 13      TJ-441-1 Rack 15 TJ-412-1 Rack 2    TJ-422-1 Rack TJ-432-1 Rack 13      TJ-442-1 Rack 15 NOTE:   To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks.
II. REACTOR COOLANT FLOW TJ-414 Rack 3       TJ-424 Rack 3    TJ-434 *Rack 3        TJ-444 Rack 3 TJ-415 Rack 7       TJ-425 Rack 7    TJ-435 Rack 7        TJ-445 Rack 7 TJ-416 Rack 12     TJ-426 Rack 12    TJ-436 Rack 12        TJ-446 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack l       TJ-456 Rack 10   TJ-457 Rack 12        TJ-474 Rack 14 IV. STEAM GENERATOR LEVEL
* TJ-517 Rack 31 TJ-518 Rack 11 TJ-519 Rack 8 TJ-527 Rack 31 TJ-528 Rack 11.
TJ-529 Rack 4 TJ-537 Rack 31 TJ-538 Rack 11 TJ-539 Rack 4 TJ-547 Rack 31 TJ-548 Rack 11 TJ-549 Rack 8 I & C
* 001
 
x SALEM GENERATING STATION                   NUMBER -     lPD-18.4.005 REV. NO.      0 PERFORMANCE DEPARTMENT (I & C)
DATE          5/3/82 TEST PROCEDURE PAGE   21   OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE I (Continued)
B. Install the following Jumpers in SSPS INPUT RELAY BAY:
I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2
* TB-308-1 to TB-308-2 II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4 TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9 to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C
* 001
 
  .X
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
TEST PROCEDURE NUMBER -
REV. NO.
DATE PAGE lPD-18. 4. 005 5/3/82 22   OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE II STEP         BISTABLE     RACK   TERMINALS     COINCIDENT   RACK             TIME RESPONSE UNDER TEST           HAGAN RACK       CHANNEL               UV COIL OVERTEMPERA TURE DELTA T 1       BS-411C       2   TB 1-11&12       BS-441C     15 2       BS-421C       6   TB 2-5&6         BS-441C     15 3       BS-431C       13   TB 3-3&4         BS-441C     15
.4           BS-441C*     15   TB 3-3&4         BS-431C     13 ESSURIZER PRESSURE/LOW (ABOVE P7) 5       BS-455C       1   TB 1-7&8         BS-474A     14 6       BS-456C       10   TB 2-9&10       BS-474A     14 7       BS-*457C     12   TB 4-1&2         BS-474A     14 8       BS-474A       14   ~B  3-1&2       BS-457C     12 PRESSURIZER PRESSURE HIGH 9       BS-455A
* 1   TB 1-1&2         BS-474C     14 10         BS-45 fiA     10   TB 2-3&4         BS-474C     14 11         BS-457A       12   TB 3-7&8         BS-474C     14 12         BS-474C       14   TB 2-11&12       BS-457A     12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8) 13         BS-414         3   TB 2-7&8         BS-416       12
                                                  *BS-424       3 BS-425       7 14         BS-415         7   TB 2"".'7&8     BS-416       12 BS-424       3 BS-425       7
    .5       BS-416       12   TB 2-3&4         BS-414       3 BS-424       3 BS-425       7 I & C -001
 
                                                                                                              -- .. .............. ~*- *..... -*._ ...*---- _...... ***-**** .. - _.,_ --**-* -- -* .. ** *-*- -* . . .*  .
.x
.x
* STEP 16 17
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* 18 19 20 21 22 24 .. *-.... *--* -. -*-*-.... --*---**--* -*******-.
TEST PROCEDURE NUMBER -
-... _ -*-* *'-'**-, ...... --... *, -,_ --.. -.............. * ..... -*._ ... *----_ ...... ***-**** .. -_.,_ --**-* ---* .. ** *-*--* ... * . . -SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE 23 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL BS-424 3 TB 2-11&12 BS-426 12 BS-414 3 . BS-415 7 BS-425 7 TB 2-11&12 BS-426 12 BS-414 3 BS-415 7 BS-426 12. TB 2-7&8 BS-424 3 BS-414 3 BS-415 7 BS-434 3 TB 3-3&4 BS-436 12 BS-414 3 -BS-415 7 BS-435 7 TB 3-3&4 BS-436 12 BS-414 3 BS-415 7 BS-436 12 TB 2-11&12 BS-434 3 BS-414 3 BS-415 7 BS-445 7 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7 BS-444 3 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7 BS-446 12 TB 3-3&4 BS-444 3 BS-414 3 I & C -001 -
REV. NO.
x !
DATE PAGE 0
* STEP STEAM 25 26 27 8 29 30 31 32 33 34 35 36
lPD-18.4.005 5/3/82 23    OF  28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -REV. NO. DATE lPD-18.4.005 0 5/3/82 PAGE. 24 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B .rr'ABLE II BISTABLE RACK TERMINALS RACK TIME RESPONSE , UNDER TEST HAGAN RACK CHANNEL UV COIL K633 BS-415 7 GENERATOR WATER LEVEL LOW-LOW BS-517B 31 TB 1-9&10 BS-519B 8 BS-518B 11 TB 1-3&4 BS-519B 8 BS-519B 8 TB Bs...:.511B 31 BS-527B 31 TB 2-3&4 BS-529B 4 BS-528B 11 TB 1-11&12 BS-529B 4 BS-529B 4 TB 1-3&4 BS-527B 31 BS-537B 31 TB 2-9&10 BS-539B 4 BS-538B 11 TB 2-7&8 BS-539B 4 BS-539B 4 TB 1-7&8 BS-537B 31 BS-547B 31 TB 3-3&4 BS-549B 8 BS-548B 11 TB 3-3&4 BS-549B 8 BS-549B 8 TB 2-9&10 BS-547B 31 I & C
Rx          Trip, Train B TABLE II STEP          BISTABLE                                  RACK                          TERMINALS                                            COINCIDENT                                        RACK                            TIME RESPONSE UNDER TEST                                                                HAGAN RACK                                                      CHANNEL                                                            UV COIL 16            BS-424                                            3                    TB 2-11&12                                                    BS-426                                      12 BS-414                                          3 BS-415
* 001 { I 
                                                                                                                                                                                  .                   7 17          BS-425                                              7                    TB 2-11&12                                                    BS-426                                      12
.* "-*-..* -...*.. *--****** *******-.:."-
*18          BS-426                                          12.                      TB 2-7&8 BS-414 BS-415 BS-424 BS-414 3
...* *. '**-"'"'*. ** .: . __ .,_ ..... _ ....... -.
7 3
.:.-.... ..:. .......
3 BS-415                                          7 19          BS-434                                              3                    TB 3-3&4                                                      BS-436                                      12 BS-414                                          3                    -
._::_;._, ** _.,, *.
BS-415                                          7 20          BS-435                                              7                    TB 3-3&4                                                      BS-436                                      12 BS-414                                          3 BS-415                                          7 21          BS-436                                          12                      TB 2-11&12                                                    BS-434                                          3 BS-414                                          3 BS-415                                          7                                      -
:...., .*.
22          BS-445                                              7                    TB 3-7&8                                                      BS-446                                      12 BS-414                                           3 BS-415                                         7
.***. .... ._ .... -.*** :.* ..
~
* x
BS-444                                              3                  TB 3-7&8                                                        BS-446                                      12 BS-414                                         3 BS-415                                           7 24          BS-446                                          12                     TB 3-3&4                                                        BS-444                                          3 BS-414                                           3 I & C -001
* STEP -. STEAM 25A
 
* 6A 27A 28A 29A 3*0A 31A ., SALEM GENERATING STATION -PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-1 S. 4. 005 REV.NO. _o ______ _ DATE 5/3/82 --------PAGE 25 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL K634 GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX FEED PUMP BS-517B *31 TB 1-9&10 BS-519B 8* BS-549B* 8 BS-548B 11 BS-518B 11 TB 1-3&4 BS-519B 8 BS-549B 8 BS-548B 11 BS-519B 8 TB 2-5&6 BS-Sl 7B 31 BS-549B 8 BS-548B 11 BS-527B 31 TB 2-3&4 BS-529B 4 BS-549B* 8 BS-548B 11 BS-528B 11 TB 1-11&12 BS-529B 4 BS-549B 8 BS-548B 11 BS-5.29B 4 TB 1-3&4 BS-527B 31 BS-549B 8 BS-548B 11 BS-537B 31 TB 2-9&10 BS-539B 4 BS-549B 8 BS-548B 11 BS-538B 11 TB 2-7&8 BS-539B 4 BS-549B 8 BS 546B 11 I & C -001 
x    !
* 'x
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)
* STEP STEAM 33A 34A 35A 36A SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER-lPD-18.4.005 REV.NO. _O ______ _ DATE __
TEST PROCEDURE NUMBER -
______ __ PAGE 26 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -* Rx Trip, Train B TABLE II BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK .CHANNEL UV COIL K634 GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP BS-539B 4 TB 1-7&8 BS-537B 31 BS-549B 8 BS-548B 11 BS-54 7B 31 TB 3-3&4 BS-549B 8 BS-529B 4 BS-528B 11 BS-548B 11 TB 3-3&4 BS-549B 8 BS-529B 4 BS-528B 11 BS-549B 8 TB 2-9&10 BS-547B 31 BS-529B 4 BS-528B 11 RC LOSS OF FLOW SINGLE LOOP (ABOVE PS) 37 BS-414 3 TB 2-7&8 BS-416 12 38 BS-415 7 TB 2-7&8 BS-416 12 39 BS -.A-2-4-"'.
REV. NO.
L\ I le 12 TB 2-7-&'S' 3-t L.
DATE lPD-18.4.005 0
3 40 BS-424 3 TB 2-11&12 BS-426 12 41 BS-425 7 TB 2-11&12 BS-426 12J 42 BS-426 12 TB 2-7&8 BS-424 3 43 Bp-434 3 TB 3-3&4 BS-436 12 44 BS-435 7 TB 3-3&4 BS-436 12 5 BS-436 12 TB 2-11&12 BS-434 3 BS-444 3 TB 3-7&8 BS-446 12 47* BS-445 7 TB 3-7&8 BS-446 12 48 BS-446 12 TB 3 -t&-B:-3-\.\
5/3/82 PAGE. 24    OF  28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
BS-444 3* \?-..J c I & C *001 <!.
Rx Trip, Train B
* c\-\ \ .. , ..... _ ....... -**-**:****-*--*-----
                                        .rr'ABLE II STEP        ,
------** ____ ... .:_ .. *------... --* ---._. 
BISTABLE    RACK  TERMINALS      COINCIDE~T      RACK          TIME RESPONSE UNDER TEST            HAGAN RACK        CHANNEL                    UV COIL      K633 BS-415            7 STEAM GENERATOR WATER LEVEL LOW-LOW 25          BS-517B      31    TB 1-9&10        BS-519B          8 26          BS-518B      11    TB 1-3&4          BS-519B          8 27          BS-519B        8    TB 2~s&6        Bs...:.511B      31 8        BS-527B      31    TB 2-3&4          BS-529B          4 29          BS-528B      11    TB 1-11&12        BS-529B          4 30          BS-529B        4    TB 1-3&4          BS-527B          31 31          BS-537B      31    TB 2-9&10        BS-539B          4 32          BS-538B      11    TB 2-7&8          BS-539B          4 33          BS-539B        4    TB 1-7&8          BS-537B          31 34          BS-547B      31    TB 3-3&4         BS-549B          8 35          BS-548B      11    TB 3-3&4          BS-549B          8 36          BS-549B        8    TB 2-9&10        BS-547B          31
.. :x
{
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO. _o ______ _ DATE
I & C
______ _ PAGE 27 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE III ---* STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL K632 RCP UNDER VOLTAGE (ABOVE P7) 37 Bus R TB 109-5 TB 109-6 Channel 3 (F) 38 Bus E TB 209-5 TB 209-6 Channel 3 (F) 39 Bus F TB 308-5 TB 308-6 Channel 1 (H) 40 Bus G TB 407-5 TB 407-6 Channel 1 (H) UNDER FREQUENCY (ABOVE P7) Bus H TB 108-9 TB 108-10 Channel 3 (F) 42 Bus E TB 208-9 TB 208-10 Channel 3 ( F) 43 Bus F TB 307-9 TB 307-10 Channel 1 (H) 44 Bus G TB 409-1 TB 409-2 Channel 1 (H) POWER RANGE LOW FLUX LEVEL TRIP 45 N41 TB 102-7 TB 102-8 N42 46 N42 TB 202..:7 TB 202-8 N41 47 N43 TB 301-7 TB 301-8 N41 48 N44 TB 401-7 TB 401-8 N41 POWER RANGE HIGH FLUX LEVEL.TRIP 49 N41 TB 102-9 TB 102-10 N42 so N42 TB 202-9 TB 202-10 N41 51 N43 TB 301-9 TB 301-10 N41 52 N44 TB 401-9 TB 401-10 N41
* 001        I
* I & C--001
 
* SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C) TEST PROCEDURE NUMBER -lPD-18. 4. 005 REV.NO. _o ______ _ DATE 5/3/82 --------PAGE' 28 OF 28 TITLE RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL POWER RANGE NEGATIVE RATE TRIP 53 N41 TB 106-7 TB 106-8 N42 54 N42 TB 207-1
    .* "-*- ..* - ...*.. *-- ****** *******-.:."-...**. '**- "'"'*. ** .: . ~ __ .,_..... _ ....... -~ - . ---~*****--~ .:.-.... ..:. .......:.-~.~ ._::_;._, ** _.,, *.'--~'-~>: :...., .*. *-~-:...:. .***. ~.... ._ .... -.** *:.*
* TB 207-2 N41 55 N43 TB 304-11 TB 304-12 N41 56 N44 TB 405-9 TB 405-10 N41 REINE AUTO STOP OIL PRESSURE SWITCHES 57 1 TB 109-1 TB 109-2 2 58 2 TB 209-1 TB 209-2 3 59 3 TB 308-1 TB 308-2 1 TURBINE STEAM STOP VALVES 60 1 TB 109-3 TB 109-4 2, 3, 4 61 2 TB 209-3 TB 209-4 1, 3, 4 62 3 TB 308-3 TB 308-4 1, 2, 4 63 4 TB 407-3 TB 407-4 1, 2, 3
  .*x
* I & C *001 . -.. -* ' ----****-*--**--***-***--------
* SALEM GENERATING STATION -
--. --*-': ----.. --------**-***  
PERFORMANCE DEPARTMENT (I & C)
....... -* _,,.. -----..... -.-.:**. .. . .. . . .. .}}
TEST PROCEDURE NUMBER -
REV.NO.
DATE PAGE lPD-1 S. 4. 005
_o_______
5/3/82 25    OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE II STEP                    BISTABLE                                        RACK                              TERMINALS                                                        COINCIDENT                                            RACK          TIME RESPONSE
                                                                                                                                                                                                                                              ~
UNDER TEST                                                                            HAGAN RACK                                                                  CHANNEL                                              UV COIL      K634
-. STEAM GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX FEED PUMP 25A
* BS-517B                                          *31                             TB 1-9&10                                                                    BS-519B                                    8*
BS-549B*                                   8 BS-548B                                    11 6A                  BS-518B                                            11                              TB 1-3&4                                                                    BS-519B                                    8 BS-549B                                    8 BS-548B                                    11 27A                    BS-519B                                                8                          TB 2-5&6                                                                    BS-Sl 7B                                  31 BS-549B                                    8 BS-548B                                    11 28A                    BS-527B                                            31                              TB 2-3&4                                                                    BS-529B                                    4 BS-549B*                                   8 BS-548B                                    11 29A                    BS-528B                                            11                              TB 1-11&12                                                                  BS-529B                                      4 BS-549B                                    8 BS-548B                                    11 3*0A                    BS-5.29B                                                4                          TB 1-3&4                                                                    BS-527B                                    31 BS-549B                                    8 BS-548B                                    11 31A                     BS-537B                                            31                              TB 2-9&10                                                                    BS-539B                                    4
.,                         BS-538B                                            11                              TB 2-7&8 BS-549B BS-548B BS-539B BS-549B BS 546B 8
11 4
8 11 I & C -001
 
  'x
* SALEM GENERATING STATION                                            NUMBER-      lPD-18.4.005 REV.NO. _O_ _ _ _ _ __
PERFORMANCE DEPARTMENT (I & C)
DATE      __5~/~3/~8_2________
TEST PROCEDURE                                                      PAGE   26    OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
* Rx Trip, Train B TABLE II STEP          BISTABLE                     RACK   TERMINALS           COINCIDENT   RACK             TIME RESPONSE UNDER TEST                             HAGAN RACK           .CHANNEL               UV COIL         K634 STEAM GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP 33A          BS-539B                          4  TB 1-7&8              BS-537B      31 BS-549B       8 BS-548B     11 34A          BS-54 7B                        31  TB 3-3&4             BS-549B      8 BS-529B      4 BS-528B      11 35A          BS-548B                          11  TB 3-3&4              BS-549B      8 BS-529B      4 BS-528B      11 36A          BS-549B                          8  TB 2-9&10            BS-547B      31 BS-529B     4 BS-528B      11 RC LOSS OF FLOW SINGLE LOOP (ABOVE PS) 37          BS-414                            3  TB 2-7&8              BS-416      12 38            BS-415                          7  TB 2-7&8             BS-416      12 39            BS -.A-2-4-"'. L\ I le          12  TB 2- 7-&'S' 3-t L. BS-~'-h</    3 40          BS-424                            3  TB 2-11&12            BS-426      12 41            BS-425                          7  TB 2-11&12            BS-426      12J 42          BS-426                          12  TB 2-7&8             BS-424        3 43            Bp-434                          3  TB 3-3&4             BS-436      12 44          BS-435                            7  TB 3-3&4              BS-436      12 5          BS-436                          12  TB 2-11&12            BS-434        3 BS-444                          3  TB 3-7&8              BS-446      12 47*           BS-445                          7  TB 3-7&8              BS-446      12 48            BS-446                          12  TB 3 -t&-B:-3-\.\    BS-444        3*
I & C *001              \?- <!.
                                    ..J  c
* c\-\ \ ..,
 
:x SALEM GENERATING STATION                    NUMBER -       lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)
REV.NO.      _o_______
DATE        _5~/_3~/_8_2_______
TEST PROCEDURE PAGE      27    OF  28 TITLE  RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE III STEP        CHANNEL      SSPS INPUT  SSPS INPUT      COINCIDENT                  TIME RESPONSE UNDER TEST      TERMINALS    TERMINALS        CHANNEL                UV COIL    K632 RCP UNDER VOLTAGE (ABOVE P7) 37           Bus R      TB 109-5    TB 109-6        Channel 3 (F) 38           Bus E      TB 209-5    TB 209-6        Channel 3 (F) 39           Bus F      TB 308-5    TB 308-6        Channel 1 (H) 40          Bus G      TB 407-5    TB 407-6        Channel 1 (H)
~
UNDER FREQUENCY (ABOVE P7)
Bus H      TB 108-9    TB 108-10      Channel 3 (F) 42          Bus E      TB 208-9    TB 208-10      Channel 3 ( F) 43          Bus F      TB 307-9    TB 307-10      Channel 1 (H) 44          Bus G      TB 409-1    TB 409-2        Channel 1 (H)
POWER RANGE LOW FLUX LEVEL TRIP 45          N41        TB 102-7     TB 102-8         N42 46          N42        TB 202..:7  TB 202---~-   N41 47          N43        TB 301-7     TB 301-8          N41 48          N44        TB 401-7    TB 401-8          N41 POWER RANGE HIGH FLUX LEVEL.TRIP 49          N41        TB 102-9    TB 102-10        N42 so          N42        TB 202-9    TB 202-10        N41 51          N43        TB 301-9    TB 301-10        N41 52          N44        TB 401-9    TB 401-10        N41 I & C--001
 
SALEM GENERATING STATION                                                                                    NUMBER -                               lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)
REV.NO.                             _o_______
TEST PROCEDURE DATE
                                                                                                                                                            -5/3/82 PAGE'              28  OF  28 TITLE  RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -
Rx Trip, Train B TABLE III STEP         CHANNEL     SSPS INPUT                                       SSPS INPUT                           COINCIDENT                                               TIME RESPONSE UNDER TEST     TERMINALS                                           TERMINALS                             CHANNEL                                           UV COIL POWER RANGE NEGATIVE RATE TRIP 53           N41         TB 106-7                                         TB 106-8                                 N42 54           N42         TB 207-1
* TB 207-2                                 N41 55           N43         TB 304-11                                       TB 304-12                               N41 56           N44         TB 405-9                                         TB 405-10                               N41 REINE AUTO STOP OIL PRESSURE SWITCHES 57             1         TB 109-1                                         TB 109-2                                       2 58             2         TB 209-1                                         TB 209-2                                       3 59             3         TB 308-1                                         TB 308-2                                       1 TURBINE STEAM STOP VALVES 60             1         TB 109-3                                         TB 109-4                                       2, 3, 4 61             2         TB 209-3                                         TB 209-4                                       1, 3, 4 62             3         TB 308-3                                         TB 308-4                                       1, 2, 4 63             4       TB 407-3                                         TB 407-4                                       1, 2, 3 I & C *001
                                                                                    ': -- - .. ----- ---**-*** ....... -* _,,.. ---- - ..... -.-.:**. .. . .. . ... .}}

Latest revision as of 12:45, 23 February 2020

Safety-related, Response Time Test of Solid State Protection Sys Logic-Reactor,Train B.
ML18087A738
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/24/1982
From:
Public Service Enterprise Group
To:
Shared Package
ML18087A720 List:
References
1PD-18.4.005, NUDOCS 8303160585
Download: ML18087A738 (32)


Text

\~L NOTE: PRESS HARO YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:

~

  • TEMPORARY ON-THE-SPOT CHANGE (ORANGE)

"......... *. ALL ON-THE-SPOT CHANGES TO BE CONSIDERED FOR APPLICABILITY TO BOTH UNITS.

[XJ UNIT 1 PROCEDURENO. __ ~\_'V_'D __--~_\_8_._~~--c_o-"-5~~~-- REV. No. ____ o____ CHANGE No._--'---

DSJ UNIT 2 PROCEDURE NO.  ?.._ (->Q - \ 'C,

  • i.\' CO 5 REV, NO. _ _,O...___ CHANGE NO._...;.__ _

PROPOSED CHANGE: tf\~e... 7. ~~-<!.f S.\ ~Os.\.*. (s.R. '4. '\}. ~\cc..:~ c. \,l\

f\~~ \ £~ - -,

s. a.,..\ (\~+ vv~<'<!..S ~ ~\ti',.._, ~ c..

' ..., c:i

\.::> " ' '

\

e. i' Ml ~ ~

~

Q. ~v...~ *0..v : \enn:~ ....,\<;

0

( °SC'Vv&"- ~""-""je....

\f.I.I) .... \ 1

\\~~I $"<\.-~ <.'..\. S.l REASON FOR CHANGE:

. W\ \\ \:.~

..,,,.. Sc c:;;;;:c v....-r~ ~'f'w..;e* ~ \\,'c,-~ h \::\~~ ~\...- £\...v...\- \)ou;:.t-.l l'.'.:*C \-

<i\s.'+x~l~~ .

\

ACTION TAKEN FOR OTHER UNIT:

cs p,~x..

AUTHORIZATION: 11),~Ja-k-r DdTE

    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY .TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE:

YES NO MEETING NO.

cg]~ fht6fz_

I 7 f I I ¥i2/~z...ATE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON-THE-SPOT CHANGE ACTION TAKEN:

B3031605SS--830314 \

PDR ADOCK 05000272 S PDR PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

FORM AP*l*t REV. 9 .

NOTE: PRESS HARD YOU ARE MAKING FIVE (!5) COPIES ADMINISTRATIVE PROCEDURE 3 D

CHANGE TYPE:

ON-THE-SPOT CHANGE rY1 PERMANENT *TEMPORARY

~ (GREENJ (ORANGEJ PROCEDURE TITLE \<_e.s; *EXPIRES:

BILITY TO BOTH UNITS.

~ UNITt PROCEDURE NO. _ _\:......;.~_b=-_-___;\_<t:'.,""'-._..\"""'-"'.-'o.._;c::;.*....;;s;;.___ _ _ _ . REV. NO. Q CHANGE NO. _ _.__ _

1x1 UNITZ PROCEDURENo. _ _=t---"'-"-~-S?-------\....;:~--*-~-'_...;;;.o~c~$-------- REV. NO. Q CHANGE NO. _ _.__ _

PROPOSED CHANGE:

~ "-~e.. ;J..5 s*-\-"'i' :5.:i... ~

C..\.-.~5~ SS S'-\lo 6

?~~~ d..\a S-\-~ -aC\

C.Y-.."""'.....,C\ "2... ~'Si. - \.\ ~ "\ ~:S L\ \le

\B- =l..\-8 "\~- -~+L\

e, s -1.\ d-lc ~S- ~-\

~f'o.~"L '2.\o S\."-f "\ '(,

REASON FOR CHANGE:

Q..\-,,-..~L \"'\:) ~ - 'l~ 8

\o ACTION TAKEN FOR OTHER UNIT:

AUTHO"R IZATION: &kiJrn~

    • SUPERVISOR IN CHARGE
    • SIGNATURE ALSO VERIFIES THAT APPLICABILITY TO BOTH .UNITS HAS BEEN CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL YES NO D

D MEETING NO.

ls2_ I~

01 I .-,,1/z.~

/ TE RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW*UP TO REJECTED ON*THE*SPOT CHANGE ACTION TAKEN:

\.....

PERFORMED BY:

SIGNATURE CATE RETURN TO DEPARTMENT HEAC FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

FORM AP*J-t REV, 9

.* NOTE: PRESS HARD YOU ARE MAKING FIVE (S) COPIES ADMINISTRATIVE PROCEDURE 3 CHANGE TYPE:

D ON-THE-SPOT CHANGE m l3J PERMANENT (GREEN)

  • TEMPORARY (ORANGE)

PROCEDURE TITLE *EXPIRES:

TY TO BOTH UNITS.

~UNIT1 PROCEDURE NO. _ \........ \?_D___-~\__..4(?...._.='.......*-0_0__..s:;;...._*_ _ _ _ _ REV. NO. _ _ o__ CHANGE No._.....__

[31UNIT2 PROCEDURENO.__;.;l.,.;__\)_..;~~--'..;......;~;:;_"l\.....:....._;:o~o.;;.....:S:::;.__ _ __ REV. No: _ _ o_____ CHANGE No. _ __.\_ _

PROPOSED CHANGE: \>P..~<!.... \.~

~Q..Q. s ~~i' <\. \ J,_

~v......_.,...,_{" -\-c.."("\-1°\\~~\.-S

\~\

...\.\.-..~ C.-c.-...; .\-'f'c \.- C,~.,,z_r'>A ~{

'5 ~~~-u <" $\...\ ~ '°" £v....~ ~T".hsocJ s'-'*, \- >r- c::; . . . . . ~ ..... *C\J\ ~-er REASON FOR CHANGE:

    • ACTION TAKEN FOR OTHER UNIT:

AUTHORIZATION:

    • SIGNATURE ALSO VERIFIES THAT APPL,ICABILITY TO BOTH UNITS HAS BEEN CONSIDERED.

ACCEPTABLE: POST CHANGE-REVIEW/APPROVAL YES D

NO a~t/wLb___

D MEETING NO.

cru~ /f/:#~

/I I I MANAGER* SALEM GENERATING STATION

~/;;jj~*

RETURN COMPLETED OR REJECTED FORM TO DEPARTMENT REQUESTING CHANGE.

FOLLOW-UP TO REJECTED ON*THE*SPOT CHANGE

\..: ..

ACTION TAKEN:

PERFORMED BY:

SIGNATURE DATE RETURN TO DEPARTMENT HEAD FOR ROUTING THROUGH POST CHANGE-REVIEW/APPROVAL CYCLE.

FORM AP-3*1 REV. 9

SALEM NUCLEAR GENERATING STATION PUBLIC SERVICE ELECTRIC & GAS COMPANY ELECTRIC GENERATION DEPARTMENT PROCEDURE APPROVAL COVER SHEET SAFETY RELATED PROCEDURE: lPD-18.4.005 - RESPONSE TIME TEST OF SSPS LOGIC -

R'EMARKS: Rx 'l'RIP ; TRAIN II B II EEO QA PERF. ENGR. SORC STA. SUPT.

REV SUBMITTED APPROVED REVIEWED APPROVED REVIEWED APPROVED _

l!?JJ~ -:!_ yO!~ 1,~ ~JV....-~yz.:l

~ L..I. ~

I~A>r/ i'i.. ~..?-73 ¥$ffl,-

.A *- WA ...

  • ui.~ '7/'2.1/8'2.

0 "";v\. c .. n. ~/fl\

-~ lkrf/*-~ ... J

  • -**-*---**-*-**-*"'"*'!"':OC*-::-..,......-,..,.. ......-..-.. ..............._......-......... ._~- . . . ....--~.....*-*"--** - -* **-----*--- --- -- *..

x

  • SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE .

PAGE --=l__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

  • Rx Trip, Train B

1.0 Purpose

1.1 To obtain the response time from the Hagan bistable switches and other inputs through the SSPS Logic to the reactor trip breaker UV.coil.

1. 2 To obtain the response tim~ from the UV coil to the
  • To be used in conjunction with other procedures for the total response time of the Reactor Trip signal from sensor to the opening of the reactor trip breakers.

2.0

References:

  • ~..-

2.1 Performance Department Manual.

2.2 Reactor Protectio'n System Logic Diagrams - 221050 thru 221065.

2.3 Westinghouse Instruction Manual - Solid State Protection.

2.4 Hagan Interconnection Diagrams - 220000 thru 220092 .

1111 c -001

x lPD-18.4.005 SALEM GENERATING STATION NUMBER -

REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TESTPROCEDURE PAGE _2__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

3.0 Precautions

3.1 Special care should be taken in the removal and handling of wire, connections, and test equipment on energized equipment.

3.2 Care should be taken in the use of the visicorder, such that a minimum quantity of the light sensitive

  • paper is wasted.

4.0 Limitations and Actions:

4.1 None stated

  • I & C
  • 001

. .**.:*o..J--::**.-*r*_.**<."'!*;:**'""" .... "*'T.""**'*.**-*********~* .. - ... -~- . ~ .; .. , , ..

x

  • SALEM GENERATING STATION NUMBER - lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C) REV.NO. ~O~~~~~~~

DATE 5/3/82

~~~~~~~~

TEST PROCEDURE PAGE

- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 5.0 Test Equipment:

Device

  • PD No. Recal. D*ate Visicorder Model 1912 Test Leads & Jumpers N/A N/A Test Resistor for Hagan Input Signals N/A N/A

. Toggle Switches (4) N/A N/A Latern Type 6VDC Battery (2) or Equiv. N/A N/A I & C - 001

      • - * ., ..,.-*** * "<'".; ~ '*' '-.r,*.,-***,-* -~'"* \ ... *-~-,* __ .,,.- .,._,, ~ ,. ,**r-* *",-* ** "'"* *** * ~ ~

x SALEM GENERATING STATION NUMSER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE ~4~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx. Trip, Train B

6.0 Prerequisites

6.1 The Reactor will be shut down and the plant will be in the refueling mode of operation (Modes 5 or Mode 6).

Senior Shift Supervisor/Shift Supervisor Date/Time 6.2 The Senior Shift Supervisor/Shift Supervisor has granted permission to perform this procedure.

Senior Shift Supervisor/Shift Supervisor Date/Time 6.3 The individual assigned to perform this procedure is qualified- to do so in accordance with the Solid State Protection System Qualification Card *

  • Job Supervisor I & C -001
    • * ** - ... ~ *,** .... -. * * ,,_ .. !""_,,.. *;~-**. **:r- .... ,.- -- -.. ---*-- . . . . *' ...... .. - ._,. .. *.. **-** . ....... .. ~;, - ..

X'

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE -"'5__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx.Trip, Train B

6.0 Prerequisites

(Continued) 6.4 The Control Operator responsible for the portion of the plant to be tested is aware of all the alarms and indi-cations which will be affected by the i?erformance of this procedure. Specifically, Coolant Temperatures must be determined from Loop Wide Range Indication, Coolant Pressure read from the Loop Hot Leg Indication, Pressurizer Level from the Cold Calibration Channel

. Indication, and Steam Generator Level from the Wide Range Indication.

Control Operator 6.5 Have the Control Operator place the pressurizer level controller in Manual.

Control Operator 6.6 Instrumentation shall have been energized and operating for at least one half hour to attain equilibrium conditions *

  • Job Supervisor I & C
  • 001

.. x SALEM GENERATING STATION NUMBER- __;l=P_D_-~1~8~*~4~*~0~0~5~

PERFORMANCE DEPARTMENT (I & C)

REV. NO. 0 DATE 5/3/82 TEST PROCEDURE PAGE _.;..6~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 7.0 System Line-up:

7.1 None stated

  • I & C - 001
  • r ' . * .* ., ,* ** . ' * ~ *~ . * * **

x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE* _..7~- OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

Initial 8.1 Lift the following leads at the NIS cabinet:

8.1.1 Rack 78 - TB123-l 8.1.2 Rack 79 TB223-l

(.s.R, \.\, '-'. ~ \oc. 't:... ~v-T)

  • c.

8.2 Install a jumper across TB507-4 and TB507-5 in both Train A and Train B.

C

~~ 'c~:

\.. .

\..:, C\- \J;:)~\'~<;;; ~ \1~~.,.;::i-

-.-, . * ~

, '"{""'""'~\~ Y1\I\.'\ lo~ eN~""j~"L~~- ~s*e oQ r .,a..__,

~=le.:*.,..,-*

/~:<;*,,.pC...

-*TY't"\\1\i ~\.--

~c c*1-,

.._1:.."'j ~-

A G \~~.-~ - \<.. 1c:,...c\ °T"-T-m:'N'A.\.... 'll;li;;.. C\ B 0Q\.'-.'("C..,._ ~~,..,;,~,.:>- ~'j~ \=\~~ \:>-,.\- '$\.,....,,,,' "0*~-.-.1 ~~~ ?-.\,.:1,_.l'M) 8.3 Place the Input Error Inhibit switch for Train A in the "Inhibit" position.

8.4 Place the Train B Mode Selector switch in the

~Test" position.

8.5

  • Clear all Reactor Trip Signals by installing test jumpers or resistors as specified in Table I.
  • 8.6 Connect Visicorder Channel 1 to the output terminals.

of the Bistable Switch under test as shown in Table 2

    • (115 VAC)
  • I & C
  • 001

., .*. *-*. .. *........ -... *.*~:: '-"""'.- ~;r.~:':'*... *?<*:*:~..-.* *:?. :***,.*:~ .... -.- .... : ... ---... *----.:-- ~ *-** - *** - *. --.. - -~-;- ~

x

    • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE -=8~- OF 28 TITLE RESPONSE TIME -TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip,* Train B

8.0 Instructions

(Continued) Initial 8.7 Connect Visicorder Channel 2 to UV coil terminals TB508-l and TB508-2 (+43 VDC) in the SSPS Train B Output*Cabinet.

8.8 Place the coincident bistable switch or switches as listed in Table 2* to the TRIP position

  • 8.9 Adjust the visicorder to obtain a good quality step function trace.

8.10 Verify the UV coil voltage at approximately 43 VDC on the LOGIC TEST PANEL meter (UV COIL VOLTAGE) in the SSPS OUTPUT LOGIC BAY.

8.11 Start the visicorder and immediately place the bistable switch under test to the TRIP position.

8.12 Stop the visicorder after the UV coils are de-energized.

Record on Table 2 the elapsed time from the trip signal to the time the UV coil voltage decays to 30% of its initial value. Label all visicorder traces, and store visicorder paper for future reference *

  • 8.13 Repeat Steps 8.5 through 8.12 for the bistables as indicated in Table 2, Step 1 through 4.

I & C -001

~

x SALEM GENERATING STATION NUMBER- lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE __;;_9__ OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) Initial 8.14 For St~ps 5 through 48 in Table 2, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch *to the Detector A and B position on power range drawers N41 and N42 and increase (clock-wise) the Detector A and Detector B Test Signal until the POWER RANGE PlO PERMISSIVE light energizes *

(Note: Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when power range* test signals are above the P7 perI!lissive and reset the rate trip as necessary.)

8.14.1 For Steps 25 through 36, connect channel 3 of the visicorder to coil contacts 5 and 6 on K633.

. 8.14.2 For Steps 25A through 36A, connect channel 3 of the visicorder to coil contacts 5 and 6 on K634.

NOTE: The UV Coil will remain de-energized for this step.

8.15 Repeat Step 8.6 through 8.12 for the bistable as indicated in Table 2, Step 5 through 36.

I & C

  • 001

.. x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE ~=5~/3=-<....;/8=2,._~~~

TEST PROCEDURE PAGE 10 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip,* Train B B.0 Instructions: (Continued) Initial B.16 For Steps 37 through 4B in Table 2, the PB permissive must pe present. Actuate PB by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42. Increase (clockwise) the Detector A and Detector B Test Signal 'until the POWER RANGE PB PERMISSIVE light energizes. (Note:

Depress BLOCK POWER RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when .the power range test signals are above the P7 permissive and reset the rate trip as necessary.)

B.17 Repeat Step 8.6 through 8.12 for the bistablesas indicated in Table 2, Steps 37 through 48.

B.18 For Steps 37 through 63 in Table 3, the P7 permissive must be present. Actuate P7 by placing the Operation Selector switch to the Detector A and B position on power range drawers N41 and N42.

Increase

.(cloc~wise)

  • the Detector A and Detector B Test Signal* until the POWER RANGE PlO PERMISSIVE light energizes. (Note:

Depress BLOCK POWER .RANGE "A" and BLOCK POWER RANGE "B" at the control bezel when the power range test

    • signals are above the P7 permissive and reset the rate trip as necessary.)

I & C

  • 001

x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE- 11 OF 28 TITLE RESPONSE TIME- TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 8.0 Instruction~: (Continued) Initial 8.19 CAUTION: Terminals may be energized (115VAC). Connect channel 3 of visicorder to coil contacts 5 and 6 on K632~ Short terminal 1 to 5 on A.R. timer.

1 8.20 Disconnect the field wires connected to the terminals liste~ in Table 3, Steps 37 through 40 *

  • 8.21 Connect a toggle 'switch across each terminal.

(Toggle switch in OFF position will produce a trip.)

8.22 Connect visicorder channel 1 across the terminals.

8.23 Repeat Steps 8.7 through 8.12 for Table 3, Steps 37 through 40. (For a coincident channel trip, place the toggle switch to OFF.)

8.24 Remove the" toggle switches from termin~ls of Table 3, Steps 37 through 40 and reconnect the field wires.

8.25 Disconnect the field wires connected to the terminals listed in Table 3, Steps 41 through 44.

8.26 Connect a toggle switch across each terminal. (Toggle

  • switch in OFF position will produce a trip.)

'8.27 Connect visicorder Channel 1 across the terminals.

I & C

  • 001

I*--

.. x SALEM GENERATING STATION NUMBER -

  • lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C) REV.NO. ~O"--~~~~~~

DATE --=5~/~3~/~8~2~~~~

TEST PROCEDURE PAGE 12 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) Initial 8.28 Repeat Steps 8.7 through 8.12 for Table 3, Steps 41 through 44. (For a coincident channel trip, place the toggle switch to OFF.)*

8.29 Remove the toggle switches from the terminals of Table 3, Steps 41 through 44 and reconnect the

  • field wires.

NOTE: For Steps 45 through 56 in Table 3, the channel under the coincident channel bistables are actuated by placing the operations selector switch to the .Detector A and B position on the power range drawers in the NIS cabinets, ahd *increasing (clockwise) the Detector A and Detector B Test Signal potentiometeri until the requir~d trip light energizes on the drawer.

8. 30 Conn*ect visicorder Channel 1 to the terminals listed in Table 3 for the channel under test. Repeat Steps 8.7 through 8.12 for Table 3, Steps 45 through 55.

8.31 Connect visicorder Channel 1 to the terITlinals listed in Table 3 Step 56

  • I & C -001

x SALEM GENERATING STATION lPD-18.4.005 NUMBER -

REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE 13 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYST.EM LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) Initial

8. 32 The Senior Shift. s*upervisor/Shift Supervisor has verified the following breakers are cleared and tagged: No *.11 Control Rod Power Supply M-G breaker on No. lE 460VAC bus and No. 12 Control Rod Power*

Supply M-G Breaker on No. lG 460 VAC bus *

  • Senior Shift Supervisor/Shift Supervisor Date/Time 8.33 Connect Channel 3 of the visicorder to the Spare "B" contact of the auxiliary switch of Reactor Trip Breaker B.

8~34 Connect the spare conductors of cable RP364-BT (located in the bypass breaker terminal cabinet) to TB7 terminals 11 & 12 in the Trip Breaker terminal cabinet.

8.35 Connect the spare conductors of cable RP364-BT (located in the SSPS Train B Logic Cabinet) to the

  • visicorder.

connect a 6VDC latern-type battery.)

(Note: In series with one conductor, I & C - 001

-. **::.****-.:-,***,*:~"'**::: . .

~- ~,, ....-.... ,,,..._.,,_..-.********-***"* ****** . . . . _______ *::.....*_.....:....___,___~-------------

x (_

SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE. 14 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC*-

Rx Trip, Train B

8.0 Instructions

(Continued) Initial 8.36 Close Reactor Trip Breaker B from the control console and repeat Steps 8.7 through 8.12 for Table 3, Step 56.

To close the trip breaker, place *the Mode Selctor Switch in Operate.

Response Time of Reactor*Trip Breaker B 8.37 Remove the connections made in Step 8.33. Place the Mode Selector Switch in Test.

8. 38 CAUTION: Terminals may be energized _( llSVAC)

Disconnect the field wires connected to the terminals listed in Table 3, Steps 57 through 59.

-~

~*:r:

8.39 Connect a toggle switch across each terminal.

(Toggle switch in OFF position will produce a trip.)

8.40 Connect visicorder Channel 1 across the terminals.

8.41 Repeat Steps 6.7 through 6.12 for Table 3, Steps 57 through 59. (For a coincident channel trip, place the toggle switch to OFF.)

  • 8.42 Remove the toggle switches from the terminals of Table 3, Steps 57 through 59 and reconnect the field wires.

I & C -001

.. x SALEM GENERATING STATION NUMBER - lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C) REV.NO. ~O~~~~~~~

DATE 5/3/82

~~~~~~~~

TEST PROCEDURE PAGE 15 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM* LOGIC -

Rx Trip, Train B

8.0 Instructions

(Continued) Initial 8.43 Disconnect the field wires connected to the terminals listed in Table 3, Steps 60 through 63.

8.44.Connect a toggle switch across each terminal. (Toggle switch in OFF position will produce a trip.)

  • 8.4.5 Connect visicorder Channel 1 across the terminals.

8.46 Repeat Steps 6.7 through 6.12 for Table 3, Steps 60 through 63. (For a coincident channel trip, place the toggle switches to OFF.)

8.47 Remove the toggle switches from terminals of Table 3, Steps 60 through 63 and reconnect the field wires

  • I & C
  • 001

x

  • SALEM GENERATING STATION NUMBER-'- lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE 16 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal: Initial 9.1 Remove visicorder Channels 1 through*3 from the SSPS Equipment Cabinets.

9.2 Remove test resistors, jumpers, and reland leads in the Hagan and SSPS cabinets as indicated in Table I

  • 9.3 Remove test equipment and jumpers from reactor trip breaker terminal cabinet.

9.4 Return NIS power range drawers to normal and clear any associated alarms.

9.5 Place the Input Error Inhibit switch for Train B in "Inhibit".

9.6 Place the Mode Selector switch for Train B in the "Operate" position

  • I& c* - 001

.x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-18. 4. 005

____;O~~~~~~

___;;5~/~3~/8~2;;__~~~

17 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal: (Continued) Initial 9.7 Initiate the Safety Injection Blocks*for both TRAIN A and TRAIN B from the Control Bezel.

Stearn Line S.I. Block A

  • Pressurizer S.I. Block B

A B

9.8 Place the Input Error Inhibit switch for both TRAIN A and TRAIN B in the "NORMAL" position.

  • * ' /.J..j1:z.S".;.., ~ n c.~~-"-o~ ~ \"""-:\1,""°N*\.\::. "'f\T-'\ ~.:... ~,-.:;<!~*':)-'"-~ ~ *; c ~c ;"'- A C\.£.\
  • Re.c.cv...>n.:i I!.'--'\- '-.::i~ ..... <_;  : \'.:\ ,,.~*,~ -- o~?> \..?~...u, '"-<t<\~w~*1-.~ e B

El \n:..~,..;;, - \<._ li"J....C\ Tet"r"'~N~\...*'l:r-.L\

9.9 Remove the jumper from TB507-4 and TB507-5 in both TR~IN A and TRAIN B.

9.10 Verify that the Green and the Amber General Warning Test LED's in both TRAINS are LIT .

  • /

I Iii C

  • 001

_ _*_*'_:._** ... *.*::"*~-*-* ,, ...,,.,.:

          • ~-'*--_ .. *_~

~  : '*

x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE lPD-18.4.005 0

5/3/82 18 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B 9.0 Return To Normal: (Continued) Initial 9.11 Reconnect the Leads lifted at the following locations:

9.11.1 NIS Rack 78, TB 123-1 .

9.11.2 NIS Rack 79, TB 223-1

  • C\.\~ i+

S~\:~ \.~ Iv-.; ~-c.C ~\CN

- ~n,~~'"'....._\s

\-"'-.~ 5-y;,\:\-

~ ~'N~ ~

~

\.\cc_\l--..

t f . ._, \i \ s 1:'

C:\'..\ \~

l- \..>-J -M.~o,j \.. ~

\e_ \ N-:O ~\.. ~ .-C.-L 0

'Ce c.s\;o;\\~ ~-)

\ P-.-;-..;,i i

-\-"' '<!_.

')....,.,.,.,~,.;.\

v,.\l.*<i<::... ~\r,.~

Cc"'.:;-\~c \-. 0 \H,. r-.f** ~c'< d:< ~**n.s,. \,\""o.J.L ~ .~. ~s-.:..\-

I & C - 001

- ***.****-*,.*..o:*.****":"-,-.- *.--~*~~---***.---- .. -.... **-~---........... - ' ___ ,, - -.* ~---**

-~- -~

x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE 19 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx T~ip, Train B 10.0 Remarks: I.O

  • 11.0 Completion:

11.1 Completed By:~~~~~~~~

Technician

  • Date Time
  • 11.2 Approved By: ~~~~~~~~-

Date Time I & C -001 I

x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-18. 4. 005

_o_______

5/3/82

~~~-----

20 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B.

TABLE I A. Test Resistors installed in the following Test Jacks and the CT switch placed in TEST:

I. REACTOR COOLANT TEMPERATURE TJ-411-1 Rack 2 TJ-421-1 Rack 6 TJ-431-1 Rack 13 TJ-441-1 Rack 15 TJ-412-1 Rack 2 TJ-422-1 Rack 6 TJ-432-1 Rack 13 TJ-442-1 Rack 15 NOTE: To clear LOW TAVG signals, open states block connections 1, 2, 3, 4, 6, 7, 8 and 9 in the above racks.

II. REACTOR COOLANT FLOW TJ-414 Rack 3 TJ-424 Rack 3 TJ-434 *Rack 3 TJ-444 Rack 3 TJ-415 Rack 7 TJ-425 Rack 7 TJ-435 Rack 7 TJ-445 Rack 7 TJ-416 Rack 12 TJ-426 Rack 12 TJ-436 Rack 12 TJ-446 Rack 12 III. PRESSURIZER PRESSURE TJ-455 Rack l TJ-456 Rack 10 TJ-457 Rack 12 TJ-474 Rack 14 IV. STEAM GENERATOR LEVEL

  • TJ-517 Rack 31 TJ-518 Rack 11 TJ-519 Rack 8 TJ-527 Rack 31 TJ-528 Rack 11.

TJ-529 Rack 4 TJ-537 Rack 31 TJ-538 Rack 11 TJ-539 Rack 4 TJ-547 Rack 31 TJ-548 Rack 11 TJ-549 Rack 8 I & C

  • 001

x SALEM GENERATING STATION NUMBER - lPD-18.4.005 REV. NO. 0 PERFORMANCE DEPARTMENT (I & C)

DATE 5/3/82 TEST PROCEDURE PAGE 21 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE I (Continued)

B. Install the following Jumpers in SSPS INPUT RELAY BAY:

I. TURBINE AUTO STOP OIL TB-109-1 to TB-109-2 TB-209-1 to TB-209-2

  • TB-308-1 to TB-308-2 II. TURBINE STEAM STOP VALVES TB-109-3 to TB-109-4 TB-209-3 to TB-209-4 TB-308-3 to TB-308-4 TB-407-3 to TB-407-4 III. REACTOR COOLANT PUMP BREAKERS TB-109-9 to TB-109-10 TB-209-9 to TB-209-10 TB-308-9 to TB-308-10 TB-407-9 to TB-407-10 I & C
  • 001

.X

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE lPD-18. 4. 005 5/3/82 22 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL OVERTEMPERA TURE DELTA T 1 BS-411C 2 TB 1-11&12 BS-441C 15 2 BS-421C 6 TB 2-5&6 BS-441C 15 3 BS-431C 13 TB 3-3&4 BS-441C 15

.4 BS-441C* 15 TB 3-3&4 BS-431C 13 ESSURIZER PRESSURE/LOW (ABOVE P7) 5 BS-455C 1 TB 1-7&8 BS-474A 14 6 BS-456C 10 TB 2-9&10 BS-474A 14 7 BS-*457C 12 TB 4-1&2 BS-474A 14 8 BS-474A 14 ~B 3-1&2 BS-457C 12 PRESSURIZER PRESSURE HIGH 9 BS-455A

  • 1 TB 1-1&2 BS-474C 14 10 BS-45 fiA 10 TB 2-3&4 BS-474C 14 11 BS-457A 12 TB 3-7&8 BS-474C 14 12 BS-474C 14 TB 2-11&12 BS-457A 12 LOSS OF FLOW TWO LOOP (ABOVE P-7 AND BELOW P-8) 13 BS-414 3 TB 2-7&8 BS-416 12
  • BS-424 3 BS-425 7 14 BS-415 7 TB 2"".'7&8 BS-416 12 BS-424 3 BS-425 7

.5 BS-416 12 TB 2-3&4 BS-414 3 BS-424 3 BS-425 7 I & C -001

-- .. .............. ~*- *..... -*._ ...*---- _...... ***-**** .. - _.,_ --**-* -- -* .. ** *-*- -* . . .* .

.x

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE PAGE 0

lPD-18.4.005 5/3/82 23 OF 28 TITLE RESPONSE TIME. TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL 16 BS-424 3 TB 2-11&12 BS-426 12 BS-414 3 BS-415

. 7 17 BS-425 7 TB 2-11&12 BS-426 12

  • 18 BS-426 12. TB 2-7&8 BS-414 BS-415 BS-424 BS-414 3

7 3

3 BS-415 7 19 BS-434 3 TB 3-3&4 BS-436 12 BS-414 3 -

BS-415 7 20 BS-435 7 TB 3-3&4 BS-436 12 BS-414 3 BS-415 7 21 BS-436 12 TB 2-11&12 BS-434 3 BS-414 3 BS-415 7 -

22 BS-445 7 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7

~

BS-444 3 TB 3-7&8 BS-446 12 BS-414 3 BS-415 7 24 BS-446 12 TB 3-3&4 BS-444 3 BS-414 3 I & C -001

x  !

  • SALEM GENERATING STATION PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV. NO.

DATE lPD-18.4.005 0

5/3/82 PAGE. 24 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B

.rr'ABLE II STEP ,

BISTABLE RACK TERMINALS COINCIDE~T RACK TIME RESPONSE UNDER TEST HAGAN RACK CHANNEL UV COIL K633 BS-415 7 STEAM GENERATOR WATER LEVEL LOW-LOW 25 BS-517B 31 TB 1-9&10 BS-519B 8 26 BS-518B 11 TB 1-3&4 BS-519B 8 27 BS-519B 8 TB 2~s&6 Bs...:.511B 31 8 BS-527B 31 TB 2-3&4 BS-529B 4 29 BS-528B 11 TB 1-11&12 BS-529B 4 30 BS-529B 4 TB 1-3&4 BS-527B 31 31 BS-537B 31 TB 2-9&10 BS-539B 4 32 BS-538B 11 TB 2-7&8 BS-539B 4 33 BS-539B 4 TB 1-7&8 BS-537B 31 34 BS-547B 31 TB 3-3&4 BS-549B 8 35 BS-548B 11 TB 3-3&4 BS-549B 8 36 BS-549B 8 TB 2-9&10 BS-547B 31

{

I & C

  • 001 I

.* "-*- ..* - ...*.. *-- ****** *******-.:."-...**. '**- "'"'*. ** .: . ~ __ .,_..... _ ....... -~ - . ---~*****--~ .:.-.... ..:. .......:.-~.~ ._::_;._, ** _.,, *.'--~'-~>: :...., .*. *-~-:...:. .***. ~.... ._ .... -.** *:.*

.*x

  • SALEM GENERATING STATION -

PERFORMANCE DEPARTMENT (I & C)

TEST PROCEDURE NUMBER -

REV.NO.

DATE PAGE lPD-1 S. 4. 005

_o_______

5/3/82 25 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE

~

UNDER TEST HAGAN RACK CHANNEL UV COIL K634

-. STEAM GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX FEED PUMP 25A

  • BS-517B *31 TB 1-9&10 BS-519B 8*

BS-549B* 8 BS-548B 11 6A BS-518B 11 TB 1-3&4 BS-519B 8 BS-549B 8 BS-548B 11 27A BS-519B 8 TB 2-5&6 BS-Sl 7B 31 BS-549B 8 BS-548B 11 28A BS-527B 31 TB 2-3&4 BS-529B 4 BS-549B* 8 BS-548B 11 29A BS-528B 11 TB 1-11&12 BS-529B 4 BS-549B 8 BS-548B 11 3*0A BS-5.29B 4 TB 1-3&4 BS-527B 31 BS-549B 8 BS-548B 11 31A BS-537B 31 TB 2-9&10 BS-539B 4

., BS-538B 11 TB 2-7&8 BS-549B BS-548B BS-539B BS-549B BS 546B 8

11 4

8 11 I & C -001

'x

  • SALEM GENERATING STATION NUMBER- lPD-18.4.005 REV.NO. _O_ _ _ _ _ __

PERFORMANCE DEPARTMENT (I & C)

DATE __5~/~3/~8_2________

TEST PROCEDURE PAGE 26 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

  • Rx Trip, Train B TABLE II STEP BISTABLE RACK TERMINALS COINCIDENT RACK TIME RESPONSE UNDER TEST HAGAN RACK .CHANNEL UV COIL K634 STEAM GENERATOR WATER LEVEL LOW-LOW AND START MOTOR DRIVEN AUX F.W. PUMP 33A BS-539B 4 TB 1-7&8 BS-537B 31 BS-549B 8 BS-548B 11 34A BS-54 7B 31 TB 3-3&4 BS-549B 8 BS-529B 4 BS-528B 11 35A BS-548B 11 TB 3-3&4 BS-549B 8 BS-529B 4 BS-528B 11 36A BS-549B 8 TB 2-9&10 BS-547B 31 BS-529B 4 BS-528B 11 RC LOSS OF FLOW SINGLE LOOP (ABOVE PS) 37 BS-414 3 TB 2-7&8 BS-416 12 38 BS-415 7 TB 2-7&8 BS-416 12 39 BS -.A-2-4-"'. L\ I le 12 TB 2- 7-&'S' 3-t L. BS-~'-h</ 3 40 BS-424 3 TB 2-11&12 BS-426 12 41 BS-425 7 TB 2-11&12 BS-426 12J 42 BS-426 12 TB 2-7&8 BS-424 3 43 Bp-434 3 TB 3-3&4 BS-436 12 44 BS-435 7 TB 3-3&4 BS-436 12 5 BS-436 12 TB 2-11&12 BS-434 3 BS-444 3 TB 3-7&8 BS-446 12 47* BS-445 7 TB 3-7&8 BS-446 12 48 BS-446 12 TB 3 -t&-B:-3-\.\ BS-444 3*

I & C *001 \?- <!.

..J c

  • c\-\ \ ..,
x SALEM GENERATING STATION NUMBER - lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)

REV.NO. _o_______

DATE _5~/_3~/_8_2_______

TEST PROCEDURE PAGE 27 OF 28 TITLE RESPONSE TIME TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL K632 RCP UNDER VOLTAGE (ABOVE P7) 37 Bus R TB 109-5 TB 109-6 Channel 3 (F) 38 Bus E TB 209-5 TB 209-6 Channel 3 (F) 39 Bus F TB 308-5 TB 308-6 Channel 1 (H) 40 Bus G TB 407-5 TB 407-6 Channel 1 (H)

~

UNDER FREQUENCY (ABOVE P7)

Bus H TB 108-9 TB 108-10 Channel 3 (F) 42 Bus E TB 208-9 TB 208-10 Channel 3 ( F) 43 Bus F TB 307-9 TB 307-10 Channel 1 (H) 44 Bus G TB 409-1 TB 409-2 Channel 1 (H)

POWER RANGE LOW FLUX LEVEL TRIP 45 N41 TB 102-7 TB 102-8 N42 46 N42 TB 202..:7 TB 202-8 --~- N41 47 N43 TB 301-7 TB 301-8 N41 48 N44 TB 401-7 TB 401-8 N41 POWER RANGE HIGH FLUX LEVEL.TRIP 49 N41 TB 102-9 TB 102-10 N42 so N42 TB 202-9 TB 202-10 N41 51 N43 TB 301-9 TB 301-10 N41 52 N44 TB 401-9 TB 401-10 N41 I & C--001

SALEM GENERATING STATION NUMBER - lPD-18. 4. 005 PERFORMANCE DEPARTMENT (I & C)

REV.NO. _o_______

TEST PROCEDURE DATE

-5/3/82 PAGE' 28 OF 28 TITLE RESPONSE TIMg TEST OF SOLID STATE PROTECTION SYSTEM LOGIC -

Rx Trip, Train B TABLE III STEP CHANNEL SSPS INPUT SSPS INPUT COINCIDENT TIME RESPONSE UNDER TEST TERMINALS TERMINALS CHANNEL UV COIL POWER RANGE NEGATIVE RATE TRIP 53 N41 TB 106-7 TB 106-8 N42 54 N42 TB 207-1

  • TB 207-2 N41 55 N43 TB 304-11 TB 304-12 N41 56 N44 TB 405-9 TB 405-10 N41 REINE AUTO STOP OIL PRESSURE SWITCHES 57 1 TB 109-1 TB 109-2 2 58 2 TB 209-1 TB 209-2 3 59 3 TB 308-1 TB 308-2 1 TURBINE STEAM STOP VALVES 60 1 TB 109-3 TB 109-4 2, 3, 4 61 2 TB 209-3 TB 209-4 1, 3, 4 62 3 TB 308-3 TB 308-4 1, 2, 4 63 4 TB 407-3 TB 407-4 1, 2, 3 I & C *001