TOLEDO
TOLEDO
                                                                   % EDISDN LOV'ELi. ti. ROE Docket No. 50-346                                                va ern .~
                                                                   % EDISDN LOV'ELi. ti. ROE Docket No. 50-346                                                va ern .~
                                                                        '""*"**"'''""
License No. NPF-3                                                " * * " " "
License No. NPF-3                                                " * * " " "
Serial No. 541
Serial No. 541 October 3, 1979 Director of Nuclear Reactor Regulation Attention: Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555
            .
October 3, 1979 Director of Nuclear Reactor Regulation Attention: Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555


==Dear Mr. Reid:==
==Dear Mr. Reid:==
Line 36: Line 33:
Yours very cruly,                          j g              /
Yours very cruly,                          j g              /
                           - n                      l Enclosure bj c/9                                                          ,,    q      q li.              -
                           - n                      l Enclosure bj c/9                                                          ,,    q      q li.              -
                                    .
THE TOLEDO EDISON COMPANY  EDISON PLAZA  300 MADISON AVENUE  TOLEDO. OH:0 43652 9        79101603 b
THE TOLEDO EDISON COMPANY  EDISON PLAZA  300 MADISON AVENUE  TOLEDO. OH:0 43652 9        79101603 b


      '
  .
    -
.
APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE NO. NPF-3 FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are forty-three (43) copies of the requested change to the Davis-Besse Nuclear Power Station Unit No. 1 Facility Operating License No. NPF-3 tegether with the safety evaluation for the requested change.
APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE NO. NPF-3 FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are forty-three (43) copies of the requested change to the Davis-Besse Nuclear Power Station Unit No. 1 Facility Operating License No. NPF-3 tegether with the safety evaluation for the requested change.
The proposed changes include 1) deletion of the secondary water chem-istry specifications in Sections 3.7.1.6 and 4.7.1.6 of the Technical Specifications; and 2) add the proposed license condition 2.(F) regard-ing the implementation of a secondary water chemistry monitoring program.
The proposed changes include 1) deletion of the secondary water chem-istry specifications in Sections 3.7.1.6 and 4.7.1.6 of the Technical Specifications; and 2) add the proposed license condition 2.(F) regard-ing the implementation of a secondary water chemistry monitoring program.
By __    _
By __    _
_ _ _                  _
Vice President, Tacilities Development Sworn to and subscribed before me this third day of October 1979.
Vice President, Tacilities Development Sworn to and subscribed before me this third day of October 1979.
bct+-~              //          -
bct+-~              //          -
                                                  '
Notary Public WILLIAM L WINDNAGLE Nctary Public, State of Ohio My Commission Expires October 24.1980
Notary Public WILLIAM L WINDNAGLE Nctary Public, State of Ohio My Commission Expires October 24.1980
_
                                                                                                   ?
                                                                                                   ?
                                                                                              .,


    .
  .
.
PROPOSED LICENSE CONDITION 2.(F) Toledo Edison Company shall maintain in effect and implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. The program shall include:
PROPOSED LICENSE CONDITION 2.(F) Toledo Edison Company shall maintain in effect and implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. The program shall include:
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
: 1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
Line 65: Line 50:
: 5. Procedures defining corrective actions for off control point chemistry conditions; and
: 5. Procedures defining corrective actions for off control point chemistry conditions; and
: 6. A procedure identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
: 6. A procedure identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.
                                                    ;
                                                        " -  , ,
                                                                '
b s s}}
b s s}}

Latest revision as of 10:07, 22 February 2020

Advises That Application for Amend to License NPF-3 Is Being Forwarded Under Separate Cover.Amend Revises Tech Specs, App a Re Implementation of Secondary Water Chemistry Monitoring Program.Class III Fee Encl
ML19253B526
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/03/1979
From: Roe L
TOLEDO EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
541, NUDOCS 7910160366
Download: ML19253B526 (3)


Text

A .

TOLEDO

% EDISDN LOV'ELi. ti. ROE Docket No. 50-346 va ern .~

License No. NPF-3 " * * " " "

Serial No. 541 October 3, 1979 Director of Nuclear Reactor Regulation Attention: Mr. Robert N. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Reid:

Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for amendment to Facility Oper-ating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Besse Nuclear Power Station Unit No. 1 Technical Specifications be revised as described below. The proposed changes in Appendix A include: 1) deletion of secondary water chemistry specifications in Sections 3.7.1.6 and 4.7.1.6 of the Technical Specifications; and 2) add the proposed license condition 2.(F) icgarding impicmentation of a secondary water chemistry monitr ring program.

This amendment request is a Class III request. Enclosed is $4,000.00 as required by 10CFR170.

The attachment identifies the proposed change, its safety evaluation and schedule required to implement the change after NRC approval.

Yours very cruly, j g /

- n l Enclosure bj c/9 ,, q q li. -

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OH:0 43652 9 79101603 b

APPLICATION FOR AMENDMENT TO FACILITY OPERATING LICENSE NO. NPF-3 FOR DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 Enclosed are forty-three (43) copies of the requested change to the Davis-Besse Nuclear Power Station Unit No. 1 Facility Operating License No. NPF-3 tegether with the safety evaluation for the requested change.

The proposed changes include 1) deletion of the secondary water chem-istry specifications in Sections 3.7.1.6 and 4.7.1.6 of the Technical Specifications; and 2) add the proposed license condition 2.(F) regard-ing the implementation of a secondary water chemistry monitoring program.

By __ _

Vice President, Tacilities Development Sworn to and subscribed before me this third day of October 1979.

bct+-~ // -

Notary Public WILLIAM L WINDNAGLE Nctary Public, State of Ohio My Commission Expires October 24.1980

?

PROPOSED LICENSE CONDITION 2.(F) Toledo Edison Company shall maintain in effect and implement a secondary water chemistry monitoring program to inhibit steam generator tube degradation. The program shall include:

1. Identification of a sampling schedule for the critical parameters and control points for these parameters;
2. Identification of the procedures used to quantify para-meters that are critical to control points;
3. Identification of process sampling points;
4. Procedure for the recording and management of data;
5. Procedures defining corrective actions for off control point chemistry conditions; and
6. A procedure identifying the authority responsible for the interpretation of the data, and the sequence and timing of administrative events required to initiate corrective action.

b s s