ML17208A449: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/05/1980
| issue date = 04/05/1980
| title = Monthly Operating Repts for Mar 1980
| title = Monthly Operating Repts for Mar 1980
| author name = CHILSON V T
| author name = Chilson V
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 15: Line 15:
| page count = 9
| page count = 9
}}
}}
=Text=
{{#Wiki_filter:AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
Turkey Point COMPLETED 8Y          V. T. C'liason TELEPHONE MONTH            MAR H        1 80 DAY        AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL IMWe.Net)                                                    (MWe.Net)
I                          668                                  17 670                                  18 56'8                                19 5 2                                20                        656 672                                21 669 668                                23 6  7                                '15, 10                          664                                26                        657 665                                '>7 12                          662                                28                        662 13                          661                                '>9                      666 14                          6 2                                30                        666 15                                                              31                        664 16                          672                                NOTE:      Average        daily power level greater than 666    >%le  due    to cooler condenser cooling water.
INSTRUCTIONS On this format. !ist the average daily onit pi>wer level in MWe Net for each day in the reporting mi>nth. Ci>mpute to rhe nearest whole megawatt.
(o/771
OPERATiiVG DATA REPORT DOCKET NO.
DATE COMPLETED BY        V.T. Chilson TELEPHONE      ~~3824 OPERATING STATUS I. Unit Name:                Turke    Point Unit No.      3            Notes  - Unit No. 3 operated
  '2.
at approximately 100X R.P.,
Reporting Period:                                                    except for outage of
: 3. Licensed Thermal Power (MWt):              2200 March 3-4, 1980.
: 4. Nameplate Rating (Gross MWe):                760
: 5. Design Eiectrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):          700
: 7. Maximum Dependable Capacity (iVet MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWc):        NONE
: 10. Reasons For Restrictions, If Any:
This Month            Yr:to-Date            Cumulative I I. Hours In Reporting Period                            744. 0            2  184.0            64 185. 6
: 12. Number Of Hours Reactor Was Critical                  742.9              1  379.6            48 649.1
: 13. Reactor Reserve Shutdown Hours                                                                  213-  3
: 14. Hours Generator On. Line                              738.2              1  250.3            46 940.5
: 15. Unit Reserve Shutdown Hours                                                                    121.8
: 16. Gross Thermal Energy Generated (MWH)                1 612 394              2 645 998            94 114 632
: 17. Gross Electrical Energy Generated (MWH)                513 485                848 545          29 929 545 Ig. Net Electrical Energy Generated (MWH)                  488 351                800 363          28 322 457
: 19. Unit Service Factor                                      99.2.                  57~ o                  73.1
: 20. Unit Availability Factor                                99.2                  57.2                    73.3 66.8
: 22. Unit Capacity Factor (Using DER Net)                                            52.9                  '63.7
: 23. Unit Forced Outage Rate                                    0.8                  2.5                    2.6
: 24. Shutdowns Scheduled Over iVext 6 Months I Type. Date. and Duration    of Each):
Steam Generator Tube          Insnection Pro ram        -  Sent. 15  -  Oct. 13    1980
: 25. IfShut Down At End Of Report Period, Estimated Date      of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                        Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
{'>/77 )
DOCKET NO. 50              250 UNIT SIIUTDO1VNS AND POlVER REDUCTIONS                                                        it No. 3 REPORT hIONTII                0 L
rg g          Llccltscc                                    Cause    Sc Corrective Nii.                                    IA                  Event                                              Action lo 0j
                                                ~Q CA        Report ~                                      Prevent Rccurrcnce
                                      '                                                          Unit  was removed from          service due to 80-03-03 1?        5.8                              N/A      CB        HOTORX low  oil level    $ .n  reactor coolant pump  motor No.      3C.'orrective actions included adding            oil.
(Nuclear system)
I                                                                        3                                4 F: Forced          Reason:                                              hI ethod:                          Exhibit G Instruct ions
                                                                                                                            ~
S: Scheduled        A.Equipment Failure (Explain)                        I -hIanual                          I'or Preparation of Data B hlaintenance or Test  ~
2-hlanual Scram.                    Entry Sltects I'or I.iccnsee C-Refueling                                          3-Automat ic Sera tn.              Event Report (LER) File (NUREG-D Regulatory Restriction                            4.Other (Explaut)                  016I )
E.Operator Training k. Liccnsc Exantination F.Administrative G Operational Error (Explain)                                                            Exhtbtt I - Sante Source I'>/77)                II Other (Exl)lain)
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO          50  251 Turkey Point UNIT COMPLETED QY            V. T. Chilson MONTH DAY        AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL (MWe.Net)                                                    (MWe-iVet )
I                        664                                  17                      660 IS                      542 669                                  l9 10 21                      648 55 23 24                      660
                                                                '>5                      657 Ip                                                              26                      651 27 l2                        652                                  28                      651 l3                        650-                                99 l4                                                              30 l5                                                              31                      651 l6                          62                                NOTE:        Average        daily power level greater, than 666 NWe due            to cooler condenser cooling                .
INSTRUCTIONS water.
On this format. list the average daily unit p>>wer level in MWe Net for each day in the rept>rtinlt tn>>nth. Ci>n>pute to the nearest whole megawatt.
(9/77 l
OPERATING DATA REPORT DOCKET NO. 50              -    251
                                                                                                              ~~~1980 OPERATING STATUS DATE COMPLETED BY TELEPHONE            ~~
                                                                                                              ~~hilson3824 I. Unit Name:                          P  int Unit    No. 4            Notes  -  Unit No. 4 operated
: 2. Reporting Period:        March 1980                                at approximately 100% R.P.,
: 3. Licensed Thermal Power (MWt):                2200                    ex'cept.for outage
: 4. Nameplate Rating (Gross MWe}:                  760                              4-5, and load reduc-of'arch S. Design Electrical Rating (Net MWe):
tion of      March 18-19, 1980.
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Yr.-to.Date              Cumulative
: 11. Hours In Reporting Period                            744.0              2  184.0            57          913.0
: 12. Number    Of Hours Reactor  Was Critical                                                                        .9
: 13. Reactor Reserve Shutdown Hours                                                12.3                        166.5
: 14. Hours Generator On. Line                                9.8                                  41 178.4
: 15. Unit Reserve Shutdown Hours                                                                                31. 2 4 686                                85 529 730
: 17. Gross Electrical Energy Generated (MWH)              503 170            1 364 755            27 268 233 1 294 788            25 824 784
: 19. Unit Service Factor                                        .4                91.4                          71.1
: 20. Unit Availability Factor                                                      92.0                          71.2 6.5                  89.0                          67.4
: 22. Unit Capacity Factor (Using DER Net)                    92.8                  85.5                      "'64.3'.0
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration    of Each}:
Scheduled maintenance          and    inspections    - April 26      June 17, 1980
: 25. If Shut Down At End Of Report Period, Estimated Date    of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                      Forecast            Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 }
DOCKET NO.        50  251 UNIT SIIUTDOWNS AND POIVER REDUCTIONS REPORT h{ONTII MARCII    1980 C$
                                    ~ A            c        Ln:ellscc                                    Cause  Ec Correclive No.          Dale            C$        ~ A Event                                              Action o1 0
Report ~                                      Prevent Recurrence
                                                ~  CA 80-03-04              4.2-      B                    N/A      CB      >iOTOMC    Unit  was removed from        service due to high  oil level in    reactor coolant pump motor No. 4B.. Corrective-actions included draining oil to norma]:  level.
(Nuclear System) 10        80-03-18                                        N/A      llc    HTEXCII    Load  reduction to repair condenser (D)      tube leak.    (Non-nuclear system) 3                                4 F: Forced        l{eason:                                            hiethod:                            Exhibit G - Instructions S. Scheduled      A-Equipmenl Failure (Explain)                        I-Manual                            for Preparation ol Data B-Maintenance oi Test-                              2-Manual Scram.                    Entry Sheets I'or Licensee C-Refueling                                          3-Automatic Secant.                Event Report (LER) File {NUREG-D-Regulatocy Reslciction                            4-Other (Explain)                  OI6I )
E-Opeca toe Tcaining 8c License Examinaliun F-Administrative G-Operational Error (Explain)                                                            Exhibit I - Same Source
{I)/77)              I I-Otlccr (Explaicc)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
St. Lucie COMPLETED BY TELEPHONE MONTH          MARCH          19 8 0 DAY        AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL
{MWe Net)                                                    tMWe-Net) 77                                  17 18 780                                19 20 21 22 777                                23
                            -777 77                                25 10                          6  0                              26 77 77 13 14                          776                                30 IS                          578                                31 16                                                              NOTE:        Average      daily power level greater than 777 MNe due          to cooler condenser cooling INSTRUCTIONS water.
Qn this format. !ist the average daily unit power level in vIWe Nct for each day in the rePorting tnonth. Cotnputc to the nearest whole megawatt.
{o/77 1
OPERATING DATA REPORT DOCKET NO.
DATE COMPLETED BY
                                                                                                          ~il
                                                                                                          ~watson 5  1980 TELEPHONE    Q~~-3824 OPERATING STATUS St. Lucie Unit No.        1            Notes      Unit operated at
: 1. Unit Name:                                                          approx~ately 100% R.P.
: 2. Reporting Period:                                                    until    March 15, 1980;      when
: 3. Licensed Thermal Power (MWt):                                        the  unit    was removed    from
: 4. Nameplate Rating (Gross MWe):                  8 0                  service      for scheduled    refue'1
: 5. Design Electrical Rating (Net MWe):            802                  ing,    maintenance, and        inspec
: 6. Maximum Dependable Capacity (Gross MWe):                              tions.
: 7. Maximum Dependable Capacity (Net MWe):                  777
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month            Yr:to.Date            Cumulative
                                                                            ~
: 11. Hours In Reporting Period                            744.0              2  184.0            28 728.0
: 12. Number Of Hours Reactor Was Critical                  356. 7              1  783.1            23 292.9
: 13. Reactor Reserve Shutdown Hours                                                                  12 .5
: 14. Hours Generator On-Line                              356.7              1  780.6            22 610.6
: 15. Unit Reserve Shutdown Hours
: 16. Gross Thermal Energy Generated (MWH)
: 17. Gross Electrical Energy Generated (MWH)
: 18. Net Electrical Energy Generated (MWH)
                                                      ~f10 ..
892 672 269 058 4 487 283 1 368 836 54 746 849 16 696 732
: 19. Unit Service Factor                                    47.9                    81.5                  78.7
: 20. Unit Availability Factor                                47.9                    81.5                  78.8
: 22. Unit Capacity Factor (Using DER Net)                    45.1                    78. 1                '72.5
: 23. Unit Forced Outage Rate                                                      0.9
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration    of Each):
: 25. If Shut Down At End Of Report Period, Estimated Dare    of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                        Forecast            Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77)
VNITSIIUTDOWNS AND POWER REDUCTIONS                        DOCKET NO. 50  335 UNIT NAh(E DATE REPORT hlONTII                0 fV L
                                  - L                        L I cell sec              C O
Cause h. C<>rreclivc iN<).        Date
                                  ~K            c  gee:      Event                                                Action to O                            Report >                  0                    I'reve>>l Recurrence
                                                ~  C/l 80-03-15          387.3                              N/A      RC        FUELXX    Unit was removed from          service for scheduled  refueling, maintenance, and inspections.          (Nuclear and non-nuclear systetns)
F: Forced        Reason:                                              Method:                              Exliibit G - Instructions S: Scheduled      A.E<luipment Failure (Explain)                      I -hlanual                          for Plepafati<ln of Data II hlaintenance or Test                              2-hlanual Scrain.                    Lntry Sheets I'or Licensee C-Refueling                                          3-Autonialic Scrain.                Event Report (LER) File (NUREG.
D.Regulatory Restriction                            4-Other (Explain)                    OI 6 I )
E-Operator Twining k. Liccnsc Examination F.Administrative G Ol)cwlioiial Lfror (Explain)                                                            Exliibit I Saine Source
                                                                                                                            ~
(')/77)                I I.Ollicr (Exlilatt<)}}

Latest revision as of 16:10, 4 February 2020

Monthly Operating Repts for Mar 1980
ML17208A449
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 04/05/1980
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A448 List:
References
NUDOCS 8004180374
Download: ML17208A449 (9)


Text

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

Turkey Point COMPLETED 8Y V. T. C'liason TELEPHONE MONTH MAR H 1 80 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL IMWe.Net) (MWe.Net)

I 668 17 670 18 56'8 19 5 2 20 656 672 21 669 668 23 6 7 '15, 10 664 26 657 665 '>7 12 662 28 662 13 661 '>9 666 14 6 2 30 666 15 31 664 16 672 NOTE: Average daily power level greater than 666 >%le due to cooler condenser cooling water.

INSTRUCTIONS On this format. !ist the average daily onit pi>wer level in MWe Net for each day in the reporting mi>nth. Ci>mpute to rhe nearest whole megawatt.

(o/771

OPERATiiVG DATA REPORT DOCKET NO.

DATE COMPLETED BY V.T. Chilson TELEPHONE ~~3824 OPERATING STATUS I. Unit Name: Turke Point Unit No. 3 Notes - Unit No. 3 operated

'2.

at approximately 100X R.P.,

Reporting Period: except for outage of

3. Licensed Thermal Power (MWt): 2200 March 3-4, 1980.
4. Nameplate Rating (Gross MWe): 760
5. Design Eiectrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (iVet MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWc): NONE
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative I I. Hours In Reporting Period 744. 0 2 184.0 64 185. 6

12. Number Of Hours Reactor Was Critical 742.9 1 379.6 48 649.1
13. Reactor Reserve Shutdown Hours 213- 3
14. Hours Generator On. Line 738.2 1 250.3 46 940.5
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Generated (MWH) 1 612 394 2 645 998 94 114 632
17. Gross Electrical Energy Generated (MWH) 513 485 848 545 29 929 545 Ig. Net Electrical Energy Generated (MWH) 488 351 800 363 28 322 457
19. Unit Service Factor 99.2. 57~ o 73.1
20. Unit Availability Factor 99.2 57.2 73.3 66.8
22. Unit Capacity Factor (Using DER Net) 52.9 '63.7
23. Unit Forced Outage Rate 0.8 2.5 2.6
24. Shutdowns Scheduled Over iVext 6 Months I Type. Date. and Duration of Each):

Steam Generator Tube Insnection Pro ram - Sent. 15 - Oct. 13 1980

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

{'>/77 )

DOCKET NO. 50 250 UNIT SIIUTDO1VNS AND POlVER REDUCTIONS it No. 3 REPORT hIONTII 0 L

rg g Llccltscc Cause Sc Corrective Nii. IA Event Action lo 0j

~Q CA Report ~ Prevent Rccurrcnce

' Unit was removed from service due to 80-03-03 1? 5.8 N/A CB HOTORX low oil level $ .n reactor coolant pump motor No. 3C.'orrective actions included adding oil.

(Nuclear system)

I 3 4 F: Forced Reason: hI ethod: Exhibit G Instruct ions

~

S: Scheduled A.Equipment Failure (Explain) I -hIanual I'or Preparation of Data B hlaintenance or Test ~

2-hlanual Scram. Entry Sltects I'or I.iccnsee C-Refueling 3-Automat ic Sera tn. Event Report (LER) File (NUREG-D Regulatory Restriction 4.Other (Explaut) 016I )

E.Operator Training k. Liccnsc Exantination F.Administrative G Operational Error (Explain) Exhtbtt I - Sante Source I'>/77) II Other (Exl)lain)

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO 50 251 Turkey Point UNIT COMPLETED QY V. T. Chilson MONTH DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe-iVet )

I 664 17 660 IS 542 669 l9 10 21 648 55 23 24 660

'>5 657 Ip 26 651 27 l2 652 28 651 l3 650- 99 l4 30 l5 31 651 l6 62 NOTE: Average daily power level greater, than 666 NWe due to cooler condenser cooling .

INSTRUCTIONS water.

On this format. list the average daily unit p>>wer level in MWe Net for each day in the rept>rtinlt tn>>nth. Ci>n>pute to the nearest whole megawatt.

(9/77 l

OPERATING DATA REPORT DOCKET NO. 50 - 251

~~~1980 OPERATING STATUS DATE COMPLETED BY TELEPHONE ~~

~~hilson3824 I. Unit Name: P int Unit No. 4 Notes - Unit No. 4 operated

2. Reporting Period: March 1980 at approximately 100% R.P.,
3. Licensed Thermal Power (MWt): 2200 ex'cept.for outage
4. Nameplate Rating (Gross MWe}: 760 4-5, and load reduc-of'arch S. Design Electrical Rating (Net MWe):

tion of March 18-19, 1980.

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to.Date Cumulative

11. Hours In Reporting Period 744.0 2 184.0 57 913.0
12. Number Of Hours Reactor Was Critical .9
13. Reactor Reserve Shutdown Hours 12.3 166.5
14. Hours Generator On. Line 9.8 41 178.4
15. Unit Reserve Shutdown Hours 31. 2 4 686 85 529 730
17. Gross Electrical Energy Generated (MWH) 503 170 1 364 755 27 268 233 1 294 788 25 824 784
19. Unit Service Factor .4 91.4 71.1
20. Unit Availability Factor 92.0 71.2 6.5 89.0 67.4
22. Unit Capacity Factor (Using DER Net) 92.8 85.5 "'64.3'.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each}:

Scheduled maintenance and inspections - April 26 June 17, 1980

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION I'>/77 }

DOCKET NO. 50 251 UNIT SIIUTDOWNS AND POIVER REDUCTIONS REPORT h{ONTII MARCII 1980 C$

~ A c Ln:ellscc Cause Ec Correclive No. Dale C$ ~ A Event Action o1 0

Report ~ Prevent Recurrence

~ CA 80-03-04 4.2- B N/A CB >iOTOMC Unit was removed from service due to high oil level in reactor coolant pump motor No. 4B.. Corrective-actions included draining oil to norma]: level.

(Nuclear System) 10 80-03-18 N/A llc HTEXCII Load reduction to repair condenser (D) tube leak. (Non-nuclear system) 3 4 F: Forced l{eason: hiethod: Exhibit G - Instructions S. Scheduled A-Equipmenl Failure (Explain) I-Manual for Preparation ol Data B-Maintenance oi Test- 2-Manual Scram. Entry Sheets I'or Licensee C-Refueling 3-Automatic Secant. Event Report (LER) File {NUREG-D-Regulatocy Reslciction 4-Other (Explain) OI6I )

E-Opeca toe Tcaining 8c License Examinaliun F-Administrative G-Operational Error (Explain) Exhibit I - Same Source

{I)/77) I I-Otlccr (Explaicc)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

St. Lucie COMPLETED BY TELEPHONE MONTH MARCH 19 8 0 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL

{MWe Net) tMWe-Net) 77 17 18 780 19 20 21 22 777 23

-777 77 25 10 6 0 26 77 77 13 14 776 30 IS 578 31 16 NOTE: Average daily power level greater than 777 MNe due to cooler condenser cooling INSTRUCTIONS water.

Qn this format. !ist the average daily unit power level in vIWe Nct for each day in the rePorting tnonth. Cotnputc to the nearest whole megawatt.

{o/77 1

OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY

~il

~watson 5 1980 TELEPHONE Q~~-3824 OPERATING STATUS St. Lucie Unit No. 1 Notes Unit operated at

1. Unit Name: approx~ately 100% R.P.
2. Reporting Period: until March 15, 1980; when
3. Licensed Thermal Power (MWt): the unit was removed from
4. Nameplate Rating (Gross MWe): 8 0 service for scheduled refue'1
5. Design Electrical Rating (Net MWe): 802 ing, maintenance, and inspec
6. Maximum Dependable Capacity (Gross MWe): tions.
7. Maximum Dependable Capacity (Net MWe): 777
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr:to.Date Cumulative

~

11. Hours In Reporting Period 744.0 2 184.0 28 728.0
12. Number Of Hours Reactor Was Critical 356. 7 1 783.1 23 292.9
13. Reactor Reserve Shutdown Hours 12 .5
14. Hours Generator On-Line 356.7 1 780.6 22 610.6
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)

~f10 ..

892 672 269 058 4 487 283 1 368 836 54 746 849 16 696 732

19. Unit Service Factor 47.9 81.5 78.7
20. Unit Availability Factor 47.9 81.5 78.8
22. Unit Capacity Factor (Using DER Net) 45.1 78. 1 '72.5
23. Unit Forced Outage Rate 0.9
24. Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Dare of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77)

VNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 335 UNIT NAh(E DATE REPORT hlONTII 0 fV L

- L L I cell sec C O

Cause h. C<>rreclivc iN<). Date

~K c gee: Event Action to O Report > 0 I'reve>>l Recurrence

~ C/l 80-03-15 387.3 N/A RC FUELXX Unit was removed from service for scheduled refueling, maintenance, and inspections. (Nuclear and non-nuclear systetns)

F: Forced Reason: Method: Exliibit G - Instructions S: Scheduled A.E<luipment Failure (Explain) I -hlanual for Plepafati<ln of Data II hlaintenance or Test 2-hlanual Scrain. Lntry Sheets I'or Licensee C-Refueling 3-Autonialic Scrain. Event Report (LER) File (NUREG.

D.Regulatory Restriction 4-Other (Explain) OI 6 I )

E-Operator Twining k. Liccnsc Examination F.Administrative G Ol)cwlioiial Lfror (Explain) Exliibit I Saine Source

~

(')/77) I I.Ollicr (Exlilatt<)