ML17272A585: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/02/1979
| issue date = 08/02/1979
| title = Forwards Deficiency Rept Re Diesel Engine Turbo Charger Thrust Bearing
| title = Forwards Deficiency Rept Re Diesel Engine Turbo Charger Thrust Bearing
| author name = RENBERGER D L
| author name = Renberger D
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name = ENGELKEN R H
| addressee name = Engelken R
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| docket = 05000397
| docket = 05000397
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:ce REGULATORY INFORMATION DISTRIBUTION SY TEM (RIDS)ACCESSION NBR:7908150560 DOC~DATE;79/08/02 NOTARIZED:
{{#Wiki_filter:ce REGULATORY INFORMATION DISTRIBUTION SY TEM                               (RIDS)
NO DOCKET FACIL:50 397 I'IPPSS Nuclear ProJect~Unit, 2>Hashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION RENBERGER<O,L.
ACCESSION NBR:7908150560                       DOC ~ DATE;     79/08/02 NOTARIZED: NO                         DOCKET FACIL:50 BYNAME 397   I'IPPSS   Nuclear ProJect~             Unit, 2> Hashington Public               Powe   05000397 AUTH                       AUTHOR AFFILIATION RENBERGER<O,L.               Washington Public Power Supply System RECIP ~ NAME               RECIPIENT AFFILIATION ENGELKKNtR ~ HE                 Region 5e San Franciscoi Office of the Director
Washington Public Power Supply System RECIP~NAME RECIPIENT AFFILIATION ENGELKKNtR
~HE Region 5e San Franciscoi Office of the Director  


==SUBJECT:==
==SUBJECT:==
Forwards deficiency rept re diesel engine turbo, charger thrust bearing problem, e DISTRIBUTION CODKi B019S COPIES RECEIVED:LTR
Forwards             deficiency rept re diesel engine turbo, charger thrust bearing problem,                                                 e DISTRIBUTION CODKi B019S COPIES RECEIVED:LTR / ENCL g                                             SIZE!
/ENCL g SIZE!TITLE: CONSTRUCTION DEFICIENCY REPORT (10CFR50~55K)~'OT Ee S+wcZ~el~e rorp8eewgeaeeemwAeeeee~qraee~~weeeeeeea~wsq~eee~~w~~ermwweemeeereyeweeem~esmwmwwmaew~weeewmwermrs e'~RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCl ID CODE/NAME'TTR ENCl~CTIO~: iu PM m<@~M 1 1 15 BC L~Re<20 LA 44urf'g 1 1 21 AD 1 1 INTERNAL: 01 EG F I 05 08 MPA 10 QAB 12 JORDANpE/IE 16 AD FOR ENGR 17 AD RKAC SFTY 22 DIR DPM AD/SITE TECH GEOSCIENCKS BR MECH KNG BR STRUCT ENG BR EXTERNAI: 03 LPDR 2u ACRS 1 1 2 2 1 1 1 1 1 1 1 1'1 1 1 1 1 1 1 1 1 1 1 16 16 02 NRC PDR 07 EDO 8 STAFF 09,DEPY DIR DPM 11 STANDRDS OEY 13F,IELD COOR/IE 17 AD PLANT SYS 19 AD SYS/PROJ 23 OELO DIRECTOR DSE MATL ENG BR S HANAUER 00 NSIC 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 1 1 1 1 1 1 1 1 AUG 18 l979 TOTAL NUMBER OF COPIES REQUIRED!LTTR 46 ENCL 96 j IE E ll ff Washington Public Power Supply System A JOINT OPERATING AGENCY P.O, BOX 988 3000 GEO.WACHINC CON WAY IIICHLAND, W*SHINCTON 99352 PHON C (509)375 5000 August 2, 1979 G02-79-137 Nuclear Regulatory Commission Region V Offfice of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 N.California Boulevard Walnut Creek, California 94596 L~~KVlJIIII gt,Kg FQ t Opy Attention:
TITLE:       CONSTRUCTION DEFICIENCY REPORT                       (10CFR50 ~ 55K)     ~
Mr.R.H.Engelken, Director  
                                                                                                              'OT Ee S + wcZ~el~e rorp8eewgeaeeemwAeeeee~qraee~~weeeeeeea~wsq~eee~~w~~ermwweemeeereyeweeem~esmwmwwmaew~weeewmwermrs e   ' ~
RECIPIENT                   COPIES                     RECIPIENT                 COPIES ID CODE/NAME                 LTTR ENCl                 ID CODE/NAME'TTR ENCl
~CTIO~:         iu   PM   m <@~M                 1       1         15 BC   L~Re<
20 LA       44urf'g               1       1         21 AD                           1       1 INTERNAL: 01         EG   F I                   1       1         02 NRC PDR                     1      1 05                                2        2          07 EDO 8 STAFF                 1      1 08 MPA                                      1          09,DEPY DIR DPM                 1      1 10  QAB                          1                  11 STANDRDS OEY                 1 1
12  JORDANpE/IE                  1        1          13F,IELD COOR/IE               1 16  AD FOR ENGR                  1        1          17 AD PLANT SYS                 1      1 17  AD RKAC SFTY                  1        1'        19 AD SYS/PROJ                 1       1 22  DIR DPM                                1         23 OELO                        1       1 AD/SITE TECH                      1       1         DIRECTOR DSE                    1       1 GEOSCIENCKS          BR            1       1         MATL ENG BR                    1       1 MECH KNG BR                        1       1         S HANAUER                      1       1 STRUCT ENG BR                      1       1 EXTERNAI: 03 LPDR                                  1       1         00 NSIC                        1       1 2u ACRS                          16      16 AUG   18 l979 TOTAL NUMBER OF COPIES REQUIRED! LTTR                                 46   ENCL       96
 
IE  ll j   E   ff
 
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O, BOX 988   3000 GEO. WACHINCCON WAY   IIICHLAND, W*SHINCTON 99352 PHON C (509) 375 5000 August 2, 1979 G02-79-137 Nuclear Regulatory Commission                       L~~KVlJIIII gt,Kg FQ Region V Offfice of Inspection       and Enforcement t Opy Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek,     California 94596 Attention:   Mr. R. H. Engelken, Director


==Subject:==
==Subject:==
WPPSS NUCLEAR PROJECT NO.2 DOCKET NO.50-397, CPPR-93 REPORTABLE DEFICIENCY 10CFR50.55 e)
WPPSS NUCLEAR PROJECT NO. 2 DOCKET NO. 50-397, CPPR-93 REPORTABLE DEFICIENCY           10CFR50.55 e)
 
==Dear Mr. Engelken:==


==Dear Mr.Engelken:==
In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on July 17, 1979, of a reportable deficiency involving Electro-Motive Division Diesel Engines in the Diesel Generator onsite emergency power system and the HPCS system. It has been found that under certain repeat start operating modes, there is a possibility that the turbo charger thrust bearing could be damaged. Attached is our report on this deficiency.
In accordance with the provisions of lOCFR50.55(e), your staff was informed by telephone on July 17, 1979, of a reportable deficiency involving Electro-Motive Division Diesel Engines in the Diesel Generator onsite emergency power system and the HPCS system.It has been found that under certain repeat start operating modes, there is a possibility that the turbo charger thrust bearing could be damaged.Attached is our report on this deficiency.
If you require additional information, please feel free to contact us.
If you require additional information, please feel free to contact us.Very truly yours, D.L.RENBERGER Assistant Director Technology DLR:WJH:cph
Very   truly yours, D. L. RENBERGER Assistant Director Technology DLR:WJH:cph


==Attachment:==
==Attachment:==
 
Reportable Deficiency Report cc w/att: 'JJ Verderber -         B8R JJ Byrnes - B8R CR   Bryant - BPA JG   Davis, Director,       NRC, Wash.     D.C.
Reportable Deficiency Report cc w/att: 'JJ Verderber-B8R JJ Byrnes-B8R CR Bryant-BPA JG Davis, Director, NRC, Wash.D.C.WNP-2 Files V 908 15 0~~~Pgl}}
WNP-2     Files Pgl V 908 15         0 ~~~}}

Latest revision as of 09:38, 4 February 2020

Forwards Deficiency Rept Re Diesel Engine Turbo Charger Thrust Bearing
ML17272A585
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/02/1979
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML17272A586 List:
References
GO2-79-137, NUDOCS 7908150560
Download: ML17272A585 (3)


Text

ce REGULATORY INFORMATION DISTRIBUTION SY TEM (RIDS)

ACCESSION NBR:7908150560 DOC ~ DATE; 79/08/02 NOTARIZED: NO DOCKET FACIL:50 BYNAME 397 I'IPPSS Nuclear ProJect~ Unit, 2> Hashington Public Powe 05000397 AUTH AUTHOR AFFILIATION RENBERGER<O,L. Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION ENGELKKNtR ~ HE Region 5e San Franciscoi Office of the Director

SUBJECT:

Forwards deficiency rept re diesel engine turbo, charger thrust bearing problem, e DISTRIBUTION CODKi B019S COPIES RECEIVED:LTR / ENCL g SIZE!

TITLE: CONSTRUCTION DEFICIENCY REPORT (10CFR50 ~ 55K) ~

'OT Ee S + wcZ~el~e rorp8eewgeaeeemwAeeeee~qraee~~weeeeeeea~wsq~eee~~w~~ermwweemeeereyeweeem~esmwmwwmaew~weeewmwermrs e ' ~

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCl ID CODE/NAME'TTR ENCl

~CTIO~: iu PM m <@~M 1 1 15 BC L~Re<

20 LA 44urf'g 1 1 21 AD 1 1 INTERNAL: 01 EG F I 1 1 02 NRC PDR 1 1 05 2 2 07 EDO 8 STAFF 1 1 08 MPA 1 09,DEPY DIR DPM 1 1 10 QAB 1 11 STANDRDS OEY 1 1

12 JORDANpE/IE 1 1 13F,IELD COOR/IE 1 16 AD FOR ENGR 1 1 17 AD PLANT SYS 1 1 17 AD RKAC SFTY 1 1' 19 AD SYS/PROJ 1 1 22 DIR DPM 1 23 OELO 1 1 AD/SITE TECH 1 1 DIRECTOR DSE 1 1 GEOSCIENCKS BR 1 1 MATL ENG BR 1 1 MECH KNG BR 1 1 S HANAUER 1 1 STRUCT ENG BR 1 1 EXTERNAI: 03 LPDR 1 1 00 NSIC 1 1 2u ACRS 16 16 AUG 18 l979 TOTAL NUMBER OF COPIES REQUIRED! LTTR 46 ENCL 96

IE ll j E ff

Washington Public Power Supply System A JOINT OPERATING AGENCY P. O, BOX 988 3000 GEO. WACHINCCON WAY IIICHLAND, W*SHINCTON 99352 PHON C (509) 375 5000 August 2, 1979 G02-79-137 Nuclear Regulatory Commission L~~KVlJIIII gt,Kg FQ Region V Offfice of Inspection and Enforcement t Opy Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 Attention: Mr. R. H. Engelken, Director

Subject:

WPPSS NUCLEAR PROJECT NO. 2 DOCKET NO. 50-397, CPPR-93 REPORTABLE DEFICIENCY 10CFR50.55 e)

Dear Mr. Engelken:

In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on July 17, 1979, of a reportable deficiency involving Electro-Motive Division Diesel Engines in the Diesel Generator onsite emergency power system and the HPCS system. It has been found that under certain repeat start operating modes, there is a possibility that the turbo charger thrust bearing could be damaged. Attached is our report on this deficiency.

If you require additional information, please feel free to contact us.

Very truly yours, D. L. RENBERGER Assistant Director Technology DLR:WJH:cph

Attachment:

Reportable Deficiency Report cc w/att: 'JJ Verderber - B8R JJ Byrnes - B8R CR Bryant - BPA JG Davis, Director, NRC, Wash. D.C.

WNP-2 Files Pgl V 908 15 0 ~~~