ML17272A585
| ML17272A585 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 08/02/1979 |
| From: | Renberger D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML17272A586 | List: |
| References | |
| GO2-79-137, NUDOCS 7908150560 | |
| Download: ML17272A585 (3) | |
Text
ce REGULATORY INFORMATION DISTRIBUTION SY TEM (RIDS)
ACCESSION NBR:7908150560 DOC ~ DATE; 79/08/02 NOTARIZED:
NO DOCKET FACIL:50 397 I'IPPSS Nuclear ProJect~
Unit, 2> Hashington Public Powe 05000397 AUTH BYNAME AUTHOR AFFILIATION RENBERGER<O,L.
Washington Public Power Supply System RECIP ~ NAME RECIPIENT AFFILIATION ENGELKKNtR ~ HE Region 5e San Franciscoi Office of the Director
SUBJECT:
Forwards deficiency rept re diesel engine turbo,charger thrust bearing
- problem, e
DISTRIBUTION CODKi B019S COPIES RECEIVED:LTR
/
ENCL g SIZE!
TITLE: CONSTRUCTION DEFICIENCY REPORT (10CFR50
~ 55K) ~
'OT Ee S + wcZ~el~e rorp8eewgeaeeemwAeeeee~qraee~~weeeeeeea~wsq~eee~~w~~ermwweemeeereyeweeem~esmwmwwmaew~weeewmwermrs e
~
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCl ID CODE/NAME'TTR ENCl
~CTIO~:
iu PM m
<@~M 1
1 15 BC L~Re<
20 LA 44urf'g 1
1 21 AD 1
1 INTERNAL: 01 EG F I 05 08 MPA 10 QAB 12 JORDANpE/IE 16 AD FOR ENGR 17 AD RKAC SFTY 22 DIR DPM AD/SITE TECH GEOSCIENCKS BR MECH KNG BR STRUCT ENG BR EXTERNAI: 03 LPDR 2u ACRS 1
1 2
2 1
1 1
1 1
1 1
1' 1
1 1
1 1
1 1
1 1
1 1
STAFF 09,DEPY DIR DPM 11 STANDRDS OEY 13F,IELD COOR/IE 17 AD PLANT SYS 19 AD SYS/PROJ 23 OELO DIRECTOR DSE MATL ENG BR S
HANAUER 00 NSIC 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
AUG 18 l979 TOTAL NUMBER OF COPIES REQUIRED!
LTTR 46 ENCL 96
j IE E
ll ff
Washington Public Power Supply System A JOINT OPERATING AGENCY P. O, BOX 988 3000 GEO. WACHINCCON WAY IIICHLAND,W*SHINCTON 99352 PHON C (509) 375 5000 August 2, 1979 G02-79-137 Nuclear Regulatory Commission Region V
Offfice of Inspection and Enforcement Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596 L~~KVlJIIIIgt,Kg FQ t Opy Attention:
Mr.
R.
H. Engelken, Director
Subject:
WPPSS NUCLEAR PROJECT NO.
2 DOCKET NO. 50-397, CPPR-93 REPORTABLE DEFICIENCY 10CFR50.55 e)
Dear Mr. Engelken:
In accordance with the provisions of 10CFR50.55(e),
your staff was informed by telephone on July 17, 1979, of a reportable deficiency involving Electro-Motive Division Diesel Engines in the Diesel Generator onsite emergency power system and the HPCS system.
It has been found that under certain repeat start operating
- modes, there is a possibility that the turbo charger thrust bearing could be damaged.
Attached is our report on this deficiency.
If you require additional information, please feel free to contact us.
Very truly yours, D. L.
RENBERGER Assistant Director Technology DLR:WJH:cph
Attachment:
Reportable Deficiency Report cc w/att: 'JJ Verderber - B8R JJ Byrnes - B8R CR Bryant - BPA JG Davis, Director, NRC, Wash.
D.C.
WNP-2 Files V 908 15 0 ~~~
Pgl