ML17347B027: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 27: Line 27:
R  I  ENCL  / SIZE:      /
R  I  ENCL  / SIZE:      /
NOTES:
NOTES:
RECIPIENT            COPIES              RECIPIENT          COPIES ID CODE/NAME          LTTR ENCL        ID  CODE/NAME      LTTR ENCL PD2-2 LA                  1    0      PD2-2 PD                5    5 EDISONgG                  1    0      NORRISgJ                1    0 INTERNAL: ACRS                        10    10      AEOD/DOA                1    1 AEOD/DSP/TPAB            1    1      ARM TECH ADV            2    2 NRR/DLPQ/PEB 11          1    1      NRR/DOEA/EAB 11        1    1 NRR ~REPj'        0      1    1      NUDOCS-ABSTRACT        1    1 EG  FILE                1    1      RGN2                    1    1 EXTERNAL'G&G SIMPSON g F              1    1      EG&G WILLIAMSgS        1    1
RECIPIENT            COPIES              RECIPIENT          COPIES ID CODE/NAME          LTTR ENCL        ID  CODE/NAME      LTTR ENCL PD2-2 LA                  1    0      PD2-2 PD                5    5 EDISONgG                  1    0      NORRISgJ                1    0 INTERNAL: ACRS                        10    10      AEOD/DOA                1    1 AEOD/DSP/TPAB            1    1      ARM TECH ADV            2    2 NRR/DLPQ/PEB 11          1    1      NRR/DOEA/EAB 11        1    1 NRR ~REPj'        0      1    1      NUDOCS-ABSTRACT        1    1 EG  FILE                1    1      RGN2                    1    1 EXTERNAL'G&G SIMPSON g F              1    1      EG&G WILLIAMSgS        1    1 LPDR                      2            NRC PDR                1    1 NSIC                      1    1 S
                                          '
NOXE 'LO ALL 'KIDS" PICIPIENTS:
LPDR                      2            NRC PDR                1    1 NSIC                      1    1
                                                                                                  '
S NOXE 'LO ALL 'KIDS" PICIPIENTS:
PIEASE HELP US 1Q REDUCE HASTE) CXRZACT 'IHE DOCUMl&Z CXÃI'ROL DESK HXN Pl-37 (EXT. 20079)    m EIZKQCGR WAR MME PKH DZBIRUHlTIQN LIST8 FOR DOCUMEÃIS YOU  DCRPT NEED)
PIEASE HELP US 1Q REDUCE HASTE) CXRZACT 'IHE DOCUMl&Z CXÃI'ROL DESK HXN Pl-37 (EXT. 20079)    m EIZKQCGR WAR MME PKH DZBIRUHlTIQN LIST8 FOR DOCUMEÃIS YOU  DCRPT NEED)
TOTAL NUMBER OF COPIES REQUIRED: LTTR                34  ENCL    31
TOTAL NUMBER OF COPIES REQUIRED: LTTR                34  ENCL    31
Line 59: Line 56:
0 II h
0 II h
f i;
f i;
            '
J
J


Line 85: Line 81:
SINCE LAST REPORT ~ GIVE REASONS+
SINCE LAST REPORT ~ GIVE REASONS+
: 9. PQWER LEVEL TO WHICH RESTRICTED'F              AHY (HET MWE) 18'EASOHS FOR RESTRICTIONS'F ANY+
: 9. PQWER LEVEL TO WHICH RESTRICTED'F              AHY (HET MWE) 18'EASOHS FOR RESTRICTIONS'F ANY+
MONTHLY  - YTD-  CUMULATIVE 11+              1H I"EPORT PERXOD:                              672      1416        136861+8 12+ NUMBER OF HOURS REACTOR WAS CRITXCAL                          8+8        8,8      98236+.6 l3t REACTOR RESERVE Sl-IUTDOWN HOURS
MONTHLY  - YTD-  CUMULATIVE 11+              1H I"EPORT PERXOD:                              672      1416        136861+8 12+ NUMBER OF HOURS REACTOR WAS CRITXCAL                          8+8        8,8      98236+.6 l3t REACTOR RESERVE Sl-IUTDOWN HOURS 8,8        8+8        166+6
,
8,8        8+8        166+6
: 14.        HOURS GENERATOR ON-LINE                                8,0        8i8      87194ol l5      4  UN1T RESERVE SHUTDOWN HOURS                            8,8        8o8          32+1 16i        GROSS TI.IERMAL ENERGY GENERATED (MWH)                    8          0    184882420 l7 t      GROSS ELECTRXCAL ENERGY GENERATED (MWH)                  0          0    58748882 HET ELECTRICAL EHERGY GENERATED (MWH)                -1292      -2281    55581858 UNIT SERVICE FACTOR
: 14.        HOURS GENERATOR ON-LINE                                8,0        8i8      87194ol l5      4  UN1T RESERVE SHUTDOWN HOURS                            8,8        8o8          32+1 16i        GROSS TI.IERMAL ENERGY GENERATED (MWH)                    8          0    184882420 l7 t      GROSS ELECTRXCAL ENERGY GENERATED (MWH)                  0          0    58748882 HET ELECTRICAL EHERGY GENERATED (MWH)                -1292      -2281    55581858 UNIT SERVICE FACTOR
   ,22'23'4'OURS                                                      0.8        F 8          64+1 18'8'21 UNIT *VA'Il ABX LIT Y F ACTOR                          8+8        8+8          64ii t CAPACXTY FACTOR (USING MDC NET)                          0.0        F 8          62+6 CAPACITY FACTOR (USING DER NET)                        8,8        8i8          58+9 UNXT FORCED OUTAGL RATE SHUTDOWHS SCI-IEDULED OVER NEXT 6 MONTHS 8,8        8,8          ili4 25        1F SHUT  DOWN AT END OF REPORT      PERIOD ~ ESTIMATED DATE OF STARTUP:  04/08/89
   ,22'23'4'OURS                                                      0.8        F 8          64+1 18'8'21 UNIT *VA'Il ABX LIT Y F ACTOR                          8+8        8+8          64ii t CAPACXTY FACTOR (USING MDC NET)                          0.0        F 8          62+6 CAPACITY FACTOR (USING DER NET)                        8,8        8i8          58+9 UNXT FORCED OUTAGL RATE SHUTDOWHS SCI-IEDULED OVER NEXT 6 MONTHS 8,8        8,8          ili4 25        1F SHUT  DOWN AT END OF REPORT      PERIOD ~ ESTIMATED DATE OF STARTUP:  04/08/89
Line 105: Line 99:
DOCKET NP.          50-335 UNIT          St. Lucie Pl DATE CONPLETED            D- N. Bonett 694-4432 BY'ELEPHONE 407 NNTH    Februar      1989 DAY AVERAGE DAILY POMER LEVEL (s ve-sec) 2/ 1/89                870 2/ 2/89                868 2/ 3/89                869 2/'/89                869 2/ 5/89                871 2/ 6/89                870 2/ 7/89                869 2/ 8/89                87 2/ 9/89                  1'71 2/10/89                872 2/ii/89                873 2/12/89                873 2/13/89                873 2/14/89                871 2/15/89                869 2/16/89                867 2/17/89                745 2/18/89                761 2/1'9/89              870 2/20/89                871 2/21/89                871 2/22/89                869 2/23/89                871 2/24/89                874 2/25/89                876 2/26/89                876 2/27/S9                875 2/28/89                874
DOCKET NP.          50-335 UNIT          St. Lucie Pl DATE CONPLETED            D- N. Bonett 694-4432 BY'ELEPHONE 407 NNTH    Februar      1989 DAY AVERAGE DAILY POMER LEVEL (s ve-sec) 2/ 1/89                870 2/ 2/89                868 2/ 3/89                869 2/'/89                869 2/ 5/89                871 2/ 6/89                870 2/ 7/89                869 2/ 8/89                87 2/ 9/89                  1'71 2/10/89                872 2/ii/89                873 2/12/89                873 2/13/89                873 2/14/89                871 2/15/89                869 2/16/89                867 2/17/89                745 2/18/89                761 2/1'9/89              870 2/20/89                871 2/21/89                871 2/22/89                869 2/23/89                871 2/24/89                874 2/25/89                876 2/26/89                876 2/27/S9                875 2/28/89                874


OPERATIHG DATA REI='ORT DOCKET HO            50  335 DATE                  3/  9/89 COMPL'ETED BY D+ Mi BOHETT TELEFHONE        407/694/4432 OPERATING STATUS
OPERATIHG DATA REI='ORT DOCKET HO            50  335 DATE                  3/  9/89 COMPL'ETED BY D+ Mi BOHETT TELEFHONE        407/694/4432 OPERATING STATUS 1+ UNXT NAME+    STi LUCXE            UNXT Z. REPORTING PERIOD: FLBr"UARY 1989 3+ LXCEHSED THERMAL POHER <MAT)i                    2700 4, NAMEPLATE RATING <GROSS MME>:                      858 5i DESXGH ELECTRXCAL RATIHG (NET MME)+                838 6+ MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE)+          872 7o MAXIMUM DEPFNDABLE CAPACITY (NET MME>i            839 8 XF CHANGES OCCUR IH CAPACITY R*TXHGS (ITEMS NUMBER 3 THROUGH            7)
"
1+ UNXT NAME+    STi LUCXE            UNXT Z. REPORTING PERIOD: FLBr"UARY 1989 3+ LXCEHSED THERMAL POHER <MAT)i                    2700 4, NAMEPLATE RATING <GROSS MME>:                      858 5i DESXGH ELECTRXCAL RATIHG (NET MME)+                838 6+ MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE)+          872 7o MAXIMUM DEPFNDABLE CAPACITY (NET MME>i            839 8 XF CHANGES OCCUR IH CAPACITY R*TXHGS (ITEMS NUMBER 3 THROUGH            7)
SIHCE LAST REPORT r GIVE  REASONS'+
SIHCE LAST REPORT r GIVE  REASONS'+
POWER LEVEL TO HHXCH RESTRXCTEDr XF AHY <NET MME) 18 i REASOHS FOR 'RESTRICTIONS r IF ANY'+
POWER LEVEL TO HHXCH RESTRXCTEDr XF AHY <NET MME) 18 i REASOHS FOR 'RESTRICTIONS r IF ANY'+
Line 135: Line 127:
  '5i DFSXGH ELECTRICAL RATXNG (NET MWE)e                                        830 6+ MAXXMUM DEF'ENDABI E CAPACITY (GROSS MWE):                                  882 7 i MA'XIMUM DEPENDABLE CAPACXT Y ( NET MWE):                                  839 8+ XF CHAHGES OCCUR IH CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH                                  7)
  '5i DFSXGH ELECTRICAL RATXNG (NET MWE)e                                        830 6+ MAXXMUM DEF'ENDABI E CAPACITY (GROSS MWE):                                  882 7 i MA'XIMUM DEPENDABLE CAPACXT Y ( NET MWE):                                  839 8+ XF CHAHGES OCCUR IH CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH                                  7)
SIHCE LAST REPORT. GIVE REASONS+
SIHCE LAST REPORT. GIVE REASONS+
                                                        '.
POWER  LEVEL To WHICH RESTRICTED>                          IF ANY <NET MWE) ie,  r'EAsoNs Far RESTRICTIONS. xF ANY:
POWER  LEVEL To WHICH RESTRICTED>                          IF ANY <NET MWE) ie,  r'EAsoNs Far RESTRICTIONS. xF ANY:
MOHTHLY    - YTD-    CUMULATIVE 1'1+  HOURS XH REPORT PERIOD:                                                    672        1416          48769 i 8 12'UMBER      QF HOURS REACTOR WAS                                                  eie      742+4      422S4.4 RESERVE SHUTDOWN'OURS CRITXCAL'3'EACTOR eie        8 i8        ~
MOHTHLY    - YTD-    CUMULATIVE 1'1+  HOURS XH REPORT PERIOD:                                                    672        1416          48769 i 8 12'UMBER      QF HOURS REACTOR WAS                                                  eie      742+4      422S4.4 RESERVE SHUTDOWN'OURS CRITXCAL'3'EACTOR eie        8 i8        ~

Latest revision as of 23:01, 3 February 2020

Monthly Operating Repts for Feb 1989 for Turkey Point Units 3 & 4 & St Lucie Units 1 & 2.W/890314 Ltr
ML17347B027
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 02/28/1989
From: Bonnett D, Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-97, NUDOCS 8903240172
Download: ML17347B027 (33)


Text

RATED D~TRIkUTION DE M ON STPXTI ON SYSTEM REGULATOR~ INFORMATION DISTRIBUTION~STEM (RIDS)

P ACCESSION NBR:8903240172 DOC.DATE: 89/02/28 NOTARIZED: NO DOCKET FACIL:50-000 Generic Docket 05000000

$ 0-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BONNETT,D.M. Florida Power & Light Co.

CONWAY,W.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for M89-Ggr Turkey Point Units 3 & 4 & St Lucie Units 1 & .W/890314 lt DISTRIBUTION CODE: IE24D COPIES RECEIVED:

TITLE: Monthly Operating Report (per Tech Specs)

R I ENCL / SIZE: /

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 5 5 EDISONgG 1 0 NORRISgJ 1 0 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 ARM TECH ADV 2 2 NRR/DLPQ/PEB 11 1 1 NRR/DOEA/EAB 11 1 1 NRR ~REPj' 0 1 1 NUDOCS-ABSTRACT 1 1 EG FILE 1 1 RGN2 1 1 EXTERNAL'G&G SIMPSON g F 1 1 EG&G WILLIAMSgS 1 1 LPDR 2 NRC PDR 1 1 NSIC 1 1 S

NOXE 'LO ALL 'KIDS" PICIPIENTS:

PIEASE HELP US 1Q REDUCE HASTE) CXRZACT 'IHE DOCUMl&Z CXÃI'ROL DESK HXN Pl-37 (EXT. 20079) m EIZKQCGR WAR MME PKH DZBIRUHlTIQN LIST8 FOR DOCUMEÃIS YOU DCRPT NEED)

TOTAL NUMBER OF COPIES REQUIRED: LTTR 34 ENCL 31

ii 4l I s

y l jl

0 P.O. Box 14000, Juno Beach, FL 33408-0420 APL MARCH 1 4 198S L-89-97 10'FR 50.36 U. S'. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the February 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4, and St. Lucie Units 1 and 2.

Very truly yours, W. F. o way Senior ice President Nuclear WFC/DMB Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant Senior Resident Inspector, USNRC, St. Lucie Plant an FPL Group company

0 'a J

~, ~

J f~ ~

J

AVERAGE DAILY UNIT POMER LEVEL DOCKET NQ. 50-250 UNIT Turkey Point f3 DATE March 15 1989 COMPLETED 'BY D. H. Bonett TELEPHONE 407 694-4432 NNTH Februar 1989 DAY (N ~t)

AVERAGE DAILY POMER LEVEL 2/ 1/89 -22 2/ 2/89 -23 2/ 3/89 25 2/ 4/89 261 2/ 5/89 529 2/ 6/89 655 2/ 7/89 667 2/ 8/89 668 2/ 9/89 402 2/10/89 -19 2/11/89 -17 2/12/89 -17 2/13/89 .17 2/14/89 -17 2/15/89 78 2/16/89 445 2/17/89 673 2/18/89 687 2/19/S9 682 2/20/89 682 2/21/89 684 2/22/89 685 2/Z3/89 693 2/24/89 785 2/25/89 712 2/26/89 708 2/27'/89 706 2/28/S9 708 PDR 4017 s9om8 R

ADOCK 05000250 PNUp

4l OPERATING DATA REF'ORT DOCKET NO 50 250 DATE 3/ 9/89 COHPLETED BY D,. M, BQHETT TELEPHONE 487/694/4432 OPERATING ST*TUB ii UHXT HARE+ TURKEY POINT UHXT 3 2o REPQRTXHG PERIOD+ FEBRUARY 1989 3+ LICENSED THERHAL POWER (HWT>+ 2200 HAHLF,'LATE RATIHG ( GROSS MWE ) 7 768

5. DESIGN ELECTRICAL RATING (NET VWE>; . 693 6+ HAXXMUN DEF'ENDABLE CAPACITY (GROSS HWE)i 699 7i'AXXNUH DEPENDABLE CAPACITY (HET MWE)+ . . 666 8+ XF'HANGES OCCUR 1H CAI"ACXTY RATXHGS (ITEMS HUHBER 3 THROUGH 7)

SINCE LAST REPORT r GIVE REASONS+

9. POWER I FVEL TQ WHICH RESTRICTED. XF AHY <NET XWE) 18+ REASONS FQR RESTRICTIONS< XF ANY'ONTI-ILY YTD- CUMULATIVE HOURS XN REF'ORT PERIODS 672 1416 142329oh 12 i NUBBER OF HOURS RE*CTOR WAS CRXTICAL 538+7 538' 93922+3 1'3 REACTOR RESERVE SHUTDOWH HOURS Oo8. 8i8 844i4 14+ HOURS GENERATOR QH-LINE 462ii 462+1 92619o4 15'HXT RESERVE SHUTDOWN HOURS 8i8 8i8 121+8 ihi GROSS THERMAL EHERGY GENERATED (HWH) 932196 932196 192125945 17+ GROSS FLECTR1CAL ENERGY GENFRATED (HWH) 303830 303838 61566356 18'ET ELECTRICAL'NERGY GENERATED (HWH) 2845'91 273064 58283608 19+ UHXT SLRVXCE FACTOR 68oB 32+6 65+1 28 i UNIT AVAILABILITYFACTOR 68o8 32ih 65i2 21+ CAPACITY FACTOR (US1NG HDC HET) 63ih 29' 0 62+7 22'APACITY FACTOR (USIHG DER NET) 61 i 1 27+8 59+.8 23'NIT FORCED OUTAGL RATE 3I t2 64+8 13'
24. SHUTDOWHS SCHEDULED OVER NEXT,h MONTHS REFUELXHG~ 9/17/89 FQR 185 DAYS 25 1F SHUT DOWN AT EHD QF REPORT PERIOD r ESTXI'IATED D*TE OF STARTUF':

0 II h

f i;

J

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNlTNAMF Turkey Point 83 DATE COMPLETED BY 0- M. Bonett REPORT MONTH February, 1989 TELEPHONE Method of Shutting Ucensee Cause & Corrective Duration Down Event System Component Actionto No. Date Type (Hours) Reason~ Reactor Report¹ Code 4 Codes PreventRecurrence 12 881230 71. 2 MA PIPEXX The outage was further'extended for repairs of thimble tubes. Unit returned to service 2/3/89.

Full power operation was delayed after returning to service for secondary chemistry, waterbox cleaning, rod position indication adjustment and repairs to main turbine front standard.

01 890209 138.7 A HH PIPEXX Unit was shutdown to repair feed-water heater steamline. Full power operation delayed for secondary chemistry. Unit returned to service 2/15/89.

F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsUcensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUBE$ 4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

0 I

'I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50- 5 UNIT Turkey Point 83 DATE Narch 15, 1989 COMPLETED D. H. Bonett BY'ELEPHONE

'407 694-REPORT MONTH Februar 1989 See the "Unit Shutdowns and Power Reductions" sheet for Unit P3.

VERAGE DAlLY ONIT POMER. LEVEL DOCKET NO. 50-251

'UNIT Turkey Point f4 DATE March 15 198 COMPLETED BY ~ D M Bonett TELEPHONE 4O7 S94-4432 NNTH Februar 1989 DAY (N ~t)

AVERAGE DAILY POMER LEVEL 2/ 1/89 2/ 2/89 2/ 3/89 2/ 4/89 2/ 5/89 2/ 6/89 2/ 7/89 2/ 8/89 2/ 9/89 2/10/89 2/1'1/89

'2/12/89 2/13/89 2/14/89 2/15/89 2/16/89 2/17/89 2/18/89 2/19/89 2/20/89 2/21/89 2/22/S9 2/23/89 2/24/89 2/25/89'/26/89 2/27/89 2/28/89

QF'ERATING DATA REPORT DOCKET HO 50 251 DATE 3/ 9/89 COMPLETED BY Di M+ BOHETT TELEPHONE 407/694/4432 OPER*TXHG STATUS ii UNIT 2i NAME+ TURKEY POINT REPORTXHG PERIOD+ FEBRUARY 1989 UHXT 3+ LICENSED THERM*l F'OWER (MWT)i 2280 4+ H*MEPLATE RATXHG (GROSS MWE)t 760 5, DESIGN ELECTRICAL RATING (HET MWE): . 693 6+ MAXIMUM'DEF'EHDABLE CAPACITY (GROSS MWE)+ 699 7 MAX1MUM DEPEHDABLE CAF'ACXTY (HET MWE): 666 8 IF CHANGES OCCUR IN CAI".ACITY R*TXNGS (XTEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT ~ GIVE REASONS+

9. PQWER LEVEL TO WHICH RESTRICTED'F AHY (HET MWE) 18'EASOHS FOR RESTRICTIONS'F ANY+

MONTHLY - YTD- CUMULATIVE 11+ 1H I"EPORT PERXOD: 672 1416 136861+8 12+ NUMBER OF HOURS REACTOR WAS CRITXCAL 8+8 8,8 98236+.6 l3t REACTOR RESERVE Sl-IUTDOWN HOURS 8,8 8+8 166+6

14. HOURS GENERATOR ON-LINE 8,0 8i8 87194ol l5 4 UN1T RESERVE SHUTDOWN HOURS 8,8 8o8 32+1 16i GROSS TI.IERMAL ENERGY GENERATED (MWH) 8 0 184882420 l7 t GROSS ELECTRXCAL ENERGY GENERATED (MWH) 0 0 58748882 HET ELECTRICAL EHERGY GENERATED (MWH) -1292 -2281 55581858 UNIT SERVICE FACTOR

,22'23'4'OURS 0.8 F 8 64+1 18'8'21 UNIT *VA'Il ABX LIT Y F ACTOR 8+8 8+8 64ii t CAPACXTY FACTOR (USING MDC NET) 0.0 F 8 62+6 CAPACITY FACTOR (USING DER NET) 8,8 8i8 58+9 UNXT FORCED OUTAGL RATE SHUTDOWHS SCI-IEDULED OVER NEXT 6 MONTHS 8,8 8,8 ili4 25 1F SHUT DOWN AT END OF REPORT PERIOD ~ ESTIMATED DATE OF STARTUP: 04/08/89

il UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME Turke Point f4 DATF March 15 1989 COMPLETED BY D tt REPORT MONTH Fe uar 1989 TELEPHONE Method of Shutting Ucensee Cause &Corrective Duration Down Event System Component Actlonto Date Type (Hours) Reason~ Reactor Report¹ Code4 Codes PreventRecurrence 880920 S 672 RC FUELXX Unit 84 remained shutdotNn for refueling and scheduled maintenance.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2- ManualScram EntryScheetsUcensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training &License Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - OperationalError(Explain) Exhibit1-Same Source H - Other(Explain)

t

SUMMARY

OF OPERATING EXPERIENCE t

DOCKET NO. 50-251 UNIT Turkey Point g4 DATE Harch 15, 1989 COMPLETED BY TELEPHONE 407 694-443 REPORT MONTH February, 1989 Unit 84 remained shutdown for refueling and scheduled maintenance.

Il AVERAGE DAILY UNIT PURER LEVEL +

DOCKET NP. 50-335 UNIT St. Lucie Pl DATE CONPLETED D- N. Bonett 694-4432 BY'ELEPHONE 407 NNTH Februar 1989 DAY AVERAGE DAILY POMER LEVEL (s ve-sec) 2/ 1/89 870 2/ 2/89 868 2/ 3/89 869 2/'/89 869 2/ 5/89 871 2/ 6/89 870 2/ 7/89 869 2/ 8/89 87 2/ 9/89 1'71 2/10/89 872 2/ii/89 873 2/12/89 873 2/13/89 873 2/14/89 871 2/15/89 869 2/16/89 867 2/17/89 745 2/18/89 761 2/1'9/89 870 2/20/89 871 2/21/89 871 2/22/89 869 2/23/89 871 2/24/89 874 2/25/89 876 2/26/89 876 2/27/S9 875 2/28/89 874

OPERATIHG DATA REI='ORT DOCKET HO 50 335 DATE 3/ 9/89 COMPL'ETED BY D+ Mi BOHETT TELEFHONE 407/694/4432 OPERATING STATUS 1+ UNXT NAME+ STi LUCXE UNXT Z. REPORTING PERIOD: FLBr"UARY 1989 3+ LXCEHSED THERMAL POHER <MAT)i 2700 4, NAMEPLATE RATING <GROSS MME>: 858 5i DESXGH ELECTRXCAL RATIHG (NET MME)+ 838 6+ MAXIMUM DEPENDABLE CAPACXTY (GROSS MHE)+ 872 7o MAXIMUM DEPFNDABLE CAPACITY (NET MME>i 839 8 XF CHANGES OCCUR IH CAPACITY R*TXHGS (ITEMS NUMBER 3 THROUGH 7)

SIHCE LAST REPORT r GIVE REASONS'+

POWER LEVEL TO HHXCH RESTRXCTEDr XF AHY <NET MME) 18 i REASOHS FOR 'RESTRICTIONS r IF ANY'+

MONTI-ILY - YTD- CUMULATIVE 11, HOURS IH REPORT FERIOD; 672 1416 186872i8 12, NUMBER OF HOURS REACTOR WAS CRITICAL 672+8 1416i8 88514i6

13. REACTOR RESERVE SHUTDOHH HOURS 8i8 8i8 285i3 I-IOURS GENERATOR OH-LINE 672' 14'l6+8 79795+3 15 i UNIT RESERVE SHUTDOWN HOURS 8,8 8i8 39+3 16+ GROSS THERMAL ENERGY GEHERATED (MHH) 1800643 3777971 204799158 17'ROSS ELECTRICAL ENERGY GENERATED (MWI.I) 689848 l277660 67396255 18'ET ELECTRICAL ENERGY GEHERATED (MMH) 579803 1214386 63665916 19+ UNIT SERVICE FACTOR 188+8 188.8 74.7 28+ UNIT AVAXLABXLXTYFACTOR 188+8 188+8 74+7 Zii CAPACTTY FACTOR <USING MDC HET) 182i8 182 i 2 74+1 22+ CAPACITY FACTOR (USING DER NET) 184 i 8 183' 72+9 23'NIT FORCED OUTAGE RATE 8i8 8,8 317 24'HUTDOWNS SCHEDULED OVER NEXT 6 MOHTHS +

25, XF SHUT DOHH AT END OF REPORT PERIOD r ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAMF St. Lucie f1 DATF March 15, 1989 COMPLETED BY D. M. Bonett REPORT MONTH Februar 1 8 4-Method of Shutting Ucensee Cause 8 Corrective Down Event System Component Actionto No. Date Type'uration (Hours) Reason~ Reactor Report¹ Code4 Codes Prevent Recurrence Unit 4'1 operated at essentia1ly fu11 power and had no shutdowns or significant power reductions.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 -. Manual for Preparation of Data B - Maintenance or Test 2- ManualScram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

il 0 I

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie 41 DATE ttarch 15. 1989

'COMPLETED BY D. H. Bonett TELEPHONE (407) 694-4432 REPORT MONTH February. 1989 St. Lucie Unit $ 1 operated at essentia11y fu11 power .and had no shutdowns or significant power reductions.

In accordance with requirements of Technica1 Specification 6.9. 1.6, there were no cha11enges to PORV or safety va1ves during the report period.

!f

~ ERAGE DAILY UNIT PNER LEVEL DOCKET NO. 50-389 UNIT St. Lucie 42 DATE CONPLETED BY D. H. Bonett TELEPHONE 432 NNTH DAY AVERh6E DAILY POMER LEVEL (s ve-see) 2/ 1/89 -27 2/ 2/S9 -20 2/ 3/89 -11 2/ 4/89 2 2/ 5/89 0 2/ 6/89 -3 2/ 7/89 2 2/ 8/89 2 2/ 9/89 -2 2/10/89 -2 2/ii/89 -2 2/12/89 -2 2/13/89 -2

'7 2/14/S9 2/15/89 -2 2/16/89 2 2/17/89 P 2/18/89 2 2/19/89 -2 2/20/89 2/Zl/89 -1 2/22/89 -1 2/23/89 -1 2/24/89 2/25/89 -1 2/26/89 2/27/89 -1 2/28/89 1

!P I~

OF'ERA TXHG DATA REF'ORT DOCVET HO 58 389 DATE 3/ 9/89 COMPLET'ED BY Di Mi BQNETT TELEPHONE 487/694/4432 OPERATING STATUS 1+ UNIT NAME+ ST+ LUCIE UNIT 2 2o REPORTXHG PERXOD+ FEBRUARY 1989 3, I xcEHsED THEr'MAL POWER <MwT): 2700 NAMEPLATE RATING ('ROSS MWE)i 850

'5i DFSXGH ELECTRICAL RATXNG (NET MWE)e 830 6+ MAXXMUM DEF'ENDABI E CAPACITY (GROSS MWE): 882 7 i MA'XIMUM DEPENDABLE CAPACXT Y ( NET MWE): 839 8+ XF CHAHGES OCCUR IH CAF'ACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SIHCE LAST REPORT. GIVE REASONS+

POWER LEVEL To WHICH RESTRICTED> IF ANY <NET MWE) ie, r'EAsoNs Far RESTRICTIONS. xF ANY:

MOHTHLY - YTD- CUMULATIVE 1'1+ HOURS XH REPORT PERIOD: 672 1416 48769 i 8 12'UMBER QF HOURS REACTOR WAS eie 742+4 422S4.4 RESERVE SHUTDOWN'OURS CRITXCAL'3'EACTOR eie 8 i8 ~

eie

14. HOURS GEHERATOR OH-LINE eie 742+1 41563i7 15'NIT RESERVE Sl-IUTDOWH HOURS '0 i 0 eie eie ihi GROSS THERMAL ENERGY GEHERATED (MWH) 8 1999393 108483863 17+ GROSS ELECTRICAL ENERGY. GENFRATED (MWH) e 664180 36161820 18+ HET ELECTRICAL ENERGY GEHERATED (MWH)'9'+

-3075 626641 34201534 UNXT SERVICE FACTOR Oie 52o4 85.i.2 20, UHXT AVAILABILITYFACTOR eie 52+4 85' 2ia 'CAPACITY FACTOR (USING MDC NET) e e 52+7 85ih 22'CAPACITY FACTOR, (USIHG DER NET) 8,+0 5343 85'+ 5 23 i UNIT FORCED 'OUTAGE RATE eie eie 5+7 24+ SHUTDOWNS SCISEDULEDOVER NEXT 6 MONTHS 25 IF SHUT DOWN *T EHD OF REr-ORT PERXOD ESTII'IATED DATE OF'TARTUP'4/24/89

II t

1,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNlT NAME St. Lucie 82 DATF March 15. 1989 COMPLETED BY REPORT MONTH Februar 1989 TELEPHONE Method of Shutting Ucensee Cause & Corrective Down Event System Component Actionto No. Date Type'uration (Kours) Reasons Reactor Report¹ Code4 Codes Prevent Recurrence, 01 890131 672 RC FUELXX Unit II2 remained shutdown for refueling and scheduled maintenance.

F Forced Reason Method Exhibit G-Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Regulatory Restriction 4 - Continued (NUREG<161)

E - Operator Training &License Examination 5 - Load Reduction F - Administrative 9 - Other (Exphin)

G - Operational Error (Explain) Exhibit1-Same Source H - Other (Explain)

I

~

~

~'

4

~ ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

UNIT St. Lucie $2 DATE l1arch 15 1989 COMPLETED BY D. f1. Bonett TELEPHONE 407 694-4432 REPORT MONTH - February, 1989 St. Lucie Unit 82 remained shutdown for refue1ing and schedu1ed maintenance.

In accordance with requirements of Technica1 Specification 6.9.1.6, there were no cha11enges to PORV or safety va1ves during the report period.