ML19211C756: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:4., 3[* -J TOLFCO a UDiSDN x.January 8, 1980 L80-016 FILE: RR 2 (NP-33-79-122)
{{#Wiki_filter:,
4 3
[* -     J TOLFCO
                                                    .                x    a UDiSDN January 8, 1980                                           L80-016 FILE: RR 2 (NP-33-79-122)
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois t1137
Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois t1137


==Dear Mr. Keppler:==
==Dear Mr. Keppler:==


Enclosed is a copy of Licensee Event Report 79-107 with a supplemental infor-mation sheet, which has been revised. The revision to the report is indicated by a"1" in the left margin.
Enclosed is a copy of Licensee Event Report 79-107 with a supplemental infor-mation sheet, which has been revised. The revision to the report is indicated by a   "1" in the left margin.
Please destroy your previous copics of this report and replace with the attached, revised copy.
Please destroy your previous copics of this report and replace with the attached, revised copy.
Yours truly, D Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/lj k Enclosure cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Encl: 30 copies LER 79-107, Rev. 1 Mr. Norman Haller, Director Office of Management Program Analysis
Yours truly, D
,., i/4J, 306 Encl: 3 copies.THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8 0 01140 44Q
Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/lj k Enclosure cc:   Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Encl: 30 copies LER 79-107, Rev. 1 Mr. Norman Haller, Director Office of Management Program Analysis i/4J, 306 Encl:   3 copies THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE     TOLEDO, OHIO 43652 8 0 01140 44Q
.}}
                                                                                            .}}

Latest revision as of 03:47, 2 February 2020

Forwards Updated LER 79-107/03L-1
ML19211C756
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1980
From: Murray T
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19211C757 List:
References
NP-33-79-122, NUDOCS 8001140440
Download: ML19211C756 (1)


Text

,

4 3

[* - J TOLFCO

. x a UDiSDN January 8, 1980 L80-016 FILE: RR 2 (NP-33-79-122)

Docket No. 50-346 License No. NPF-3 Mr. James G. Keppler Regional Director, Region III Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois t1137

Dear Mr. Keppler:

Enclosed is a copy of Licensee Event Report 79-107 with a supplemental infor-mation sheet, which has been revised. The revision to the report is indicated by a "1" in the left margin.

Please destroy your previous copics of this report and replace with the attached, revised copy.

Yours truly, D

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/lj k Enclosure cc: Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Encl: 30 copies LER 79-107, Rev. 1 Mr. Norman Haller, Director Office of Management Program Analysis i/4J, 306 Encl: 3 copies THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 8 0 01140 44Q

.