{{#Wiki_filter:_ - - - - - - - _ _ - - - -
{{#Wiki_filter:_ - - - - - - - _ _ - - - -
_
      -
    .
  .
                          ,
public service company ce conen de
public service company ce conen de
                     .;      -
                     .;      -
Line 28: Line 23:
                   . . . . -  PLATTEVILLE, COLOR ADO 80651 October 14, 1980 Fort St. Vrain i                                              Unit No. 1 P-80366-l Mr. Karl V. Seyfrit, Director
                   . . . . -  PLATTEVILLE, COLOR ADO 80651 October 14, 1980 Fort St. Vrain i                                              Unit No. 1 P-80366-l Mr. Karl V. Seyfrit, Director
!      Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012
!      Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012
,


==Reference:==
==Reference:==
Line 38: Line 32:
Enclosed please find a copy of Reportable Occurrence Report No. 50-267/
Enclosed please find a copy of Reportable Occurrence Report No. 50-267/
80-50, Final, submitted per the requirements of Technical Specificatica AC 7.5.2(b)2 and AC 7.5.2(b)3.
80-50, Final, submitted per the requirements of Technical Specificatica AC 7.5.2(b)2 and AC 7.5.2(b)3.
,
Also, please find enclosed one copy of the Licensee Event Report for
Also, please find enclosed one copy of the Licensee Event Report for
'
         'leportable Occurrence Report No. 50-267/80-50.
         'leportable Occurrence Report No. 50-267/80-50.
Very truly yours,
Very truly yours,
Line 46: Line 38:
8010210- (:;,5 2_                                  y
8010210- (:;,5 2_                                  y


                          .                                        .      ,
                  ,
        ,-.
      ..
I REPORT DATE:              October 14,-1980              REPORTABLE OCCURRENCE-80-50 Determined                    ISSUE 0
I REPORT DATE:              October 14,-1980              REPORTABLE OCCURRENCE-80-50 Determined                    ISSUE 0
:              OCCURRENCE DATE:          Seo temb er 15, 1980          'Page 1 of 3 l
:              OCCURRENCE DATE:          Seo temb er 15, 1980          'Page 1 of 3 l
                                                                     ~
                                                                     ~
i FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 191/2 PLATTEVILLE, COLORADO 80651 l
i FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 191/2 PLATTEVILLE, COLORADO 80651 l
REPORT No. 50-267/80-50/03-L-0
REPORT No. 50-267/80-50/03-L-0 Final i
    -
Final i
I-              IDC'iTIFICI. TION OF OCCURxtstE:
I-              IDC'iTIFICI. TION OF OCCURxtstE:
Two-hydraulic snubbers installed on Class I piping had not been identified L              as Class I, nor included in Table 4.3.10-1 of LCO 4.3.10 and were therefore i              not routinely tested to verify operability per SR 5.3.8.
Two-hydraulic snubbers installed on Class I piping had not been identified L              as Class I, nor included in Table 4.3.10-1 of LCO 4.3.10 and were therefore i              not routinely tested to verify operability per SR 5.3.8.
l Secause compliance with LCO 4.3.10 cannot be verified for previous reactor operation, this is reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)2 and AC 7.5.2(b) 3. Reportability determined September 15, 1980.
l Secause compliance with LCO 4.3.10 cannot be verified for previous reactor operation, this is reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)2 and AC 7.5.2(b) 3. Reportability determined September 15, 1980.
'
EVENT DESCRIPTION:
EVENT DESCRIPTION:
Engineering personnel performing an audit of 21/2" and larger piping identi-
Engineering personnel performing an audit of 21/2" and larger piping identi-
Line 68: Line 53:
l              ability criteria and testing requirements of the Technical Specifications l              had not previously been applied to these snubbers. These two snubbers are l-              the only _ onissions identified to date.
l              ability criteria and testing requirements of the Technical Specifications l              had not previously been applied to these snubbers. These two snubbers are l-              the only _ onissions identified to date.
j              Although the plant was in a shutdown condition for scheduled maintenance and            q
j              Although the plant was in a shutdown condition for scheduled maintenance and            q
                                                                                                        '
~
~
surveillance testing at the time of ~ this discovery, numerous periods of re-
surveillance testing at the time of ~ this discovery, numerous periods of re-
Line 76: Line 60:
3FS-154E and 3FS-166' vere apparently omitted from the list of Class I snub-bers contained :in Table' 4.3.10-1 due to an oversight on the ' part of per-sonnel who performed the initial analysis of. piping supports.
3FS-154E and 3FS-166' vere apparently omitted from the list of Class I snub-bers contained :in Table' 4.3.10-1 due to an oversight on the ' part of per-sonnel who performed the initial analysis of. piping supports.
L
L
                                                                                                      -
                                                                                                          .
            -
                                                                                             -e-    T
                                                                                             -e-    T


        .                            .            -                    .        .
i:    ,
i:    ,
_
,  -
                                                                                                  '
!
!
i-REPORTABLE OCCURRENCE 80-50 ISSUE O Page 2 of 3 CORRECTIVE.
i-REPORTABLE OCCURRENCE 80-50 ISSUE O Page 2 of 3 CORRECTIVE.
ACTION:
ACTION:
,
Th + following corrective actions have been taken with regard to this oc-currenc'-
Th + following corrective actions have been taken with regard to this oc-
: 1) - The snubbers were inspee r.ed per the criteria of SR 5.3.Sa-X ard found:co be acceptab? >      n addition, the snubbers were functionally I                    tested in accordance -ita approved maintenance procedures. This meets the intent of Surveillance Requirement 5.3.8b-R.
'
currenc'-
: 1) - The snubbers were inspee r.ed per the criteria of SR 5.3.Sa-X ard found:co be acceptab? >      n addition, the snubbers were functionally I                    tested in accordance -ita approved maintenance procedures. This
.
meets the intent of Surveillance Requirement 5.3.8b-R.
l' i -            2) A revision _has been made _ to include BFS-154E and BFS-166 in Surveil-
l' i -            2) A revision _has been made _ to include BFS-154E and BFS-166 in Surveil-
!                    lance Test SR 5.3.8a-X.
!                    lance Test SR 5.3.8a-X.
: 3) A evision to LCO 4.3.10, Table 4.3.10-1 to add these two new snub-bers will be submitted per LCO 4.3.10(e) .
: 3) A evision to LCO 4.3.10, Table 4.3.10-1 to add these two new snub-bers will be submitted per LCO 4.3.10(e) .
No further corrective action is anticipated or required.
No further corrective action is anticipated or required.
l
l i
'
i
!
  -
                   -e                  -m- ,                      y      ,g-- 2  -            - m
                   -e                  -m- ,                      y      ,g-- 2  -            - m


            .                                                                  .  .
        -
    .,
,
REPORTABLE OCCURRENCE 80-50 ISSU2 0 Page 3 of 3
REPORTABLE OCCURRENCE 80-50 ISSU2 0 Page 3 of 3
                                              .
                                         ,Cj t
                                         ,Cj
Prepared By:  a    r-  L Tv'n    C c/.
                                        ':        -
t Prepared By:  a    r-  L Tv'n    C c/.
Cathy C, Hirsch Technical Services Technician Review,d By:  h                        _
Cathy C, Hirsch Technical Services Technician Review,d By:  h                        _
                                                         ,    V J.W..jahm                      J' Technical Services Supervisor
                                                         ,    V J.W..jahm                      J' Technical Services Supervisor Reviewed By:  [/VI /N> M        '
,
Reviewed By:  [/VI /N> M        '
dM i
dM i
Frank M. Mathie          f Operations Manager
Frank M. Mathie          f Operations Manager Approved'By:        -    Mes      nw Don Warembourg Manager, Nuclear Pro etion i
,
1
Approved'By:        -    Mes      nw
                                                                  #-
Don Warembourg Manager, Nuclear Pro etion
,
i 1
       ,a  e                      ~,                            -    ~-  ---          .-}}
       ,a  e                      ~,                            -    ~-  ---          .-}}

Revision as of 10:19, 31 January 2020

Forwards LER 80-050/03L-0
ML19340B208
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/14/1980
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19340B209 List:
References
P-80366, NUDOCS 8010210652
Download: ML19340B208 (4)


Text

_ - - - - - - - _ _ - - - -

public service company ce conen de

.; -

16805 ROAD 19%

. . . . - PLATTEVILLE, COLOR ADO 80651 October 14, 1980 Fort St. Vrain i Unit No. 1 P-80366-l Mr. Karl V. Seyfrit, Director

! Nuclear Regulatory Commission Region IV Office of Inspection and Enforcement 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012

Reference:

Facility Operating License No. DPR-34 l

Docket No. 50-267 l

Dear Mr. Seyfrit:

Enclosed please find a copy of Reportable Occurrence Report No. 50-267/

80-50, Final, submitted per the requirements of Technical Specificatica AC 7.5.2(b)2 and AC 7.5.2(b)3.

Also, please find enclosed one copy of the Licensee Event Report for

'leportable Occurrence Report No. 50-267/80-50.

Very truly yours,

'WW Don Warembourg v Manager, Nuclear Production DW/cis Enclosure ec: Director, MIPC Y%\

8010210- (:;,5 2_ y

I REPORT DATE: October 14,-1980 REPORTABLE OCCURRENCE-80-50 Determined ISSUE 0

OCCURRENCE DATE: Seo temb er 15, 1980 'Page 1 of 3 l

~

i FORT ST. VRAIN NUCLEAR GENERATING STATION PUBLIC SERVICE COMPANY OF COLORADO 16805 WELD COUNTY ROAD 191/2 PLATTEVILLE, COLORADO 80651 l

REPORT No. 50-267/80-50/03-L-0 Final i

I- IDC'iTIFICI. TION OF OCCURxtstE:

Two-hydraulic snubbers installed on Class I piping had not been identified L as Class I, nor included in Table 4.3.10-1 of LCO 4.3.10 and were therefore i not routinely tested to verify operability per SR 5.3.8.

l Secause compliance with LCO 4.3.10 cannot be verified for previous reactor operation, this is reportable per Fort St. Vrain Technical Specification AC 7.5.2(b)2 and AC 7.5.2(b) 3. Reportability determined September 15, 1980.

EVENT DESCRIPTION:

Engineering personnel performing an audit of 21/2" and larger piping identi-

i. fled hydraulic snubbers 3FS-154E and 3FS-166 which, although installed on

! Class I piping, were not included in the list of Class I snubbers contained

! in Fort St. Vrain Technical Specification LCO 4.3.10, Table 4.3.10-1. Be-l cause of the omission of 3FS-154E and 3FS-166 f rom Table 4.3.10-1, .the oper- '

l ability criteria and testing requirements of the Technical Specifications l had not previously been applied to these snubbers. These two snubbers are l- the only _ onissions identified to date.

j Although the plant was in a shutdown condition for scheduled maintenance and q

~

surveillance testing at the time of ~ this discovery, numerous periods of re-

actor operation have occurred since these snubbers were initially installed.

l CAUSE- l

! DESCRIPTION:

3FS-154E and 3FS-166' vere apparently omitted from the list of Class I snub-bers contained :in Table' 4.3.10-1 due to an oversight on the ' part of per-sonnel who performed the initial analysis of. piping supports.

L

-e- T

i: ,

i-REPORTABLE OCCURRENCE 80-50 ISSUE O Page 2 of 3 CORRECTIVE.

ACTION:

Th + following corrective actions have been taken with regard to this oc-currenc'-

1) - The snubbers were inspee r.ed per the criteria of SR 5.3.Sa-X ard found:co be acceptab? > n addition, the snubbers were functionally I tested in accordance -ita approved maintenance procedures. This meets the intent of Surveillance Requirement 5.3.8b-R.

l' i - 2) A revision _has been made _ to include BFS-154E and BFS-166 in Surveil-

! lance Test SR 5.3.8a-X.

3) A evision to LCO 4.3.10, Table 4.3.10-1 to add these two new snub-bers will be submitted per LCO 4.3.10(e) .

No further corrective action is anticipated or required.

l i

-e -m- , y ,g-- 2 - - m

REPORTABLE OCCURRENCE 80-50 ISSU2 0 Page 3 of 3

,Cj t

Prepared By: a r- L Tv'n C c/.

Cathy C, Hirsch Technical Services Technician Review,d By: h _

, V J.W..jahm J' Technical Services Supervisor Reviewed By: [/VI /N> M '

dM i

Frank M. Mathie f Operations Manager Approved'By: - Mes nw Don Warembourg Manager, Nuclear Pro etion i

1

,a e ~, - ~- --- .-