ML12314A029: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML12314A029
| number = ML12314A029
| issue date = 11/13/2012
| issue date = 11/13/2012
| title = 11/26/12 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 (TAC No. ME9894
| title = Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2
| author name = Billoch-Colon A T
| author name = Billoch-Colon A
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Quichocho J F
| addressee name = Quichocho J
| addressee affiliation = NRC/NRR/DORL/LPLII-2
| addressee affiliation = NRC/NRR/DORL/LPLII-2
| docket = 05000261
| docket = 05000261
Line 14: Line 14:
| page count = 4
| page count = 4
| project = TAC:ME9894
| project = TAC:ME9894
| stage =  
| stage = Draft Approval
}}
}}


=Text=
=Text=
{{#Wiki_filter:MEMORANDUM TO: FROM: SUBJECT: DATE &TIME: LOCATION: PURPOSE: CATEGORY 1:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 November 13, 2012 MEMORANDUM TO:                  Jessie F. Ouichocho, Acting Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing FROM:                            Araceli T. Billoch Colon, Project Manager ~                        T,   ~      CA'\.
* PARTICIPANTS: UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 November 13, 2012 Jessie F. Ouichocho, Acting Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Araceli T. Billoch Colon, Project Manager T, CA'\. Plant Licensing Branch 11-2 Division of Operating Reactor Licensing FORTHCOMING CONFERENCE CALL WITH DUKE ENERGY, INC., CONCERNING GENERIC LETTER 2004-02 AND NRC STAFF REVIEW OF DRAFT PROPOSED STRAINER FIBER BYPASS TEST PLAN FOR H.B. ROBINSON STEAM ELECTRIC PLANT UNIT NO.2 (TAC NO. ME9894) Monday, November 26,2012 2:00 p.m. -3:00 p.m. U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-8B2 Rockville, Maryland 20852 The purpose of this meeting is for Duke Energy, representing Carolina Power &Light Company, to present its proposed strainer fiber bypass test plan for H.B. Robinson Steam Electric Plant Unit No.2, regarding Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors." This is a Category 1 meeting via conference call. The public may participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR). NRC S. Bailey S. Smith J. Stang F.Saba J.Ouichocho Duke Energy and its conSUltants R. Hightower D. Phillips S. Connelly et al. S. Lingam, et al. 'Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28. 2002.
Plant Licensing Branch 11-2 Division of Operating Reactor Licensing
J. Quichocho -2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail one of the meeting contacts listed below by November 20,2012,2:00 p.m. (Eastern Time) to get the telephone number and the pass code. MEETING CONTACTS: Araceli T. Billoch Colon, NRR 301-415-3302 Araceli. Billoch@nrc.gov Farideh E. Saba, NRR 301-415-1447 Farideh.Saba@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.htm!. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket Nos. 50-400 Enclosure: Agenda cc w/encl: Distribution via Listserv MONDAY, NOVEMBER 26, FORTHCOMING MEETING (VIA A CONFERENCE CALL) DUKE ENERGY GENERIC LETTER 2:00 P.M. -3:00
 
==SUBJECT:==
FORTHCOMING CONFERENCE CALL WITH DUKE ENERGY, INC.,
CONCERNING GENERIC LETTER 2004-02 AND NRC STAFF REVIEW OF DRAFT PROPOSED STRAINER FIBER BYPASS TEST PLAN FOR H.B. ROBINSON STEAM ELECTRIC PLANT UNIT NO.2 (TAC NO. ME9894)
DATE & TIME:                    Monday, November 26,2012 2:00 p.m. - 3:00 p.m.
LOCATION:                        U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-8B2 Rockville, Maryland 20852 PURPOSE:                        The purpose of this meeting is for Duke Energy, representing Carolina Power & Light Company, to present its proposed strainer fiber bypass test plan for H.B. Robinson Steam Electric Plant Unit No.2, regarding Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors."
CATEGORY 1:
* This is a Category 1 meeting via conference call. The public may participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
PARTICIPANTS:                    Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC                                         Duke Energy and its conSUltants S. Bailey                                  R. Hightower S. Smith                                    D. Phillips J. Stang                                    S. Connelly F.Saba                                      et al.
J.Ouichocho S. Lingam, et al.
'Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28. 2002.
 
J. Quichocho                                       -2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail one of the meeting contacts listed below by November 20,2012,2:00 p.m.
(Eastern Time) to get the telephone number and the pass code.
MEETING CONTACTS: Araceli T. Billoch Colon, NRR                        Farideh E. Saba, NRR 301-415-3302                             301-415-1447 Araceli. Billoch@nrc.gov                   Farideh.Saba@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.htm!.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-400
 
==Enclosure:==
 
Agenda cc w/encl: Distribution via Listserv
 
AGENDA MONDAY, NOVEMBER 26, 2012 FORTHCOMING MEETING (VIA A CONFERENCE CALL) WITH DUKE ENERGY REGARDING GENERIC LETTER 2004-02 2:00 P.M. - 3:00 P.M.
* Introductions/Purpose of Conference
* Introductions/Purpose of Conference
* Project Status
* Project Status
Line 28: Line 54:
* Summary of Items Requiring Action
* Summary of Items Requiring Action
* Public Comments
* Public Comments
* Adjourn Enclosure J. -2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail one of the meeting contacts listed below by November 20,2012,2:00 p.m. (Eastern Time) to get the telephone number and the pass code. MEETING Araceli T. Billoch Colon, NRR Farideh E. Saba, NRR 301-415-3302 301-415-1447 Araceli. BilIoch@nrc.gov F arideh. Saba@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print), please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.htm!. Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above. Docket Nos. 50-400 Enclosure: Agenda cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC LPL2-2 Reading RidsAcrsAcnw MailCTR Resource RidsNrrDorl Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMRobinson Resource RidsNrrLABClaytonResource RidsOgcMailCenter Resource RidsOpaMail Resource RidsRgn2MailCenter Resource RidsNrrDssSsib Resource TWertz, NRR SKennedy. EDO RHannah, OPA RII JStang, NRR OWFN Receptionist (paper) TWFN Receptionist (paper) PMNS Resource JLedford,OPA RII SSmith, NRR FSaba, MRR SLingam. NRR ADAMS Accession No'.. ML12314A029 OFFICE NAME DATE DORLlLPL2-2/PM ABillochCol6n 11/9/12 DORLlLPL2-2fLA BClayton 11/9/12 DORLlLPL2-2/BC (A) JQuichocho 11/13112 DORLlLPL2-2/PM ABillochCol6n 11/13/12 OFFICIAL RECORD COpy
* Adjourn Enclosure
}}
 
J. Quichocho                                            -2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail one of the meeting contacts listed below by November 20,2012,2:00 p.m.
(Eastern Time) to get the telephone number and the pass code.
MEETING CONTACTS: Araceli T. Billoch Colon, NRR                                 Farideh E. Saba, NRR 301-415-3302                                     301-415-1447 Araceli. Bi lIoch@nrc.gov                         Farideh. Saba@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.htm!.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket Nos. 50-400
 
==Enclosure:==
 
Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC                             LPL2-2 Reading                     RidsAcrsAcnw MailCTR Resource RidsNrrDorl Resource               RidsNrrDorlLpl2-2 Resource         RidsNrrPMRobinson Resource RidsNrrLABClaytonResource           RidsOgcMailCenter Resource         RidsOpaMail Resource RidsRgn2MailCenter Resource         RidsNrrDssSsib Resource             TWertz, NRR SKennedy. EDO                       RHannah, OPA RII                   JStang, NRR OWFN Receptionist (paper)           TWFN Receptionist (paper)           PMNS Resource JLedford,OPA RII                   SSmith, NRR                         FSaba, MRR SLingam. NRR ADAMS Accession No'   .. ML12314A029 OFFICE     DORLlLPL2-2/PM             DORLlLPL2-2fLA           DORLlLPL2-2/BC (A)         DORLlLPL2-2/PM NAME      ABillochCol6n              BClayton                JQuichocho                ABillochCol6n DATE      11/9/12                    11/9/12                  11/13112                  11/13/12 OFFICIAL RECORD COpy}}

Latest revision as of 17:11, 5 December 2019

Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2
ML12314A029
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/13/2012
From: Billoch-Colon A
Plant Licensing Branch II
To: Jessie Quichocho
Plant Licensing Branch II
Billoch, Araceli
References
TAC ME9894
Download: ML12314A029 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555"()001 November 13, 2012 MEMORANDUM TO: Jessie F. Ouichocho, Acting Chief Plant Licensing Branch 11-2 Division of Operating Reactor Licensing FROM: Araceli T. Billoch Colon, Project Manager ~ T, ~ CA'\.

Plant Licensing Branch 11-2 Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING CONFERENCE CALL WITH DUKE ENERGY, INC.,

CONCERNING GENERIC LETTER 2004-02 AND NRC STAFF REVIEW OF DRAFT PROPOSED STRAINER FIBER BYPASS TEST PLAN FOR H.B. ROBINSON STEAM ELECTRIC PLANT UNIT NO.2 (TAC NO. ME9894)

DATE & TIME: Monday, November 26,2012 2:00 p.m. - 3:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-8B2 Rockville, Maryland 20852 PURPOSE: The purpose of this meeting is for Duke Energy, representing Carolina Power & Light Company, to present its proposed strainer fiber bypass test plan for H.B. Robinson Steam Electric Plant Unit No.2, regarding Generic Letter 2004-02, "Potential Impact of Debris Blockage on Emergency Recirculation during Design Basis Accidents at Pressurized-Water Reactors."

CATEGORY 1:

  • This is a Category 1 meeting via conference call. The public may participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC Duke Energy and its conSUltants S. Bailey R. Hightower S. Smith D. Phillips J. Stang S. Connelly F.Saba et al.

J.Ouichocho S. Lingam, et al.

'Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28. 2002.

J. Quichocho -2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail one of the meeting contacts listed below by November 20,2012,2:00 p.m.

(Eastern Time) to get the telephone number and the pass code.

MEETING CONTACTS: Araceli T. Billoch Colon, NRR Farideh E. Saba, NRR 301-415-3302 301-415-1447 Araceli. Billoch@nrc.gov Farideh.Saba@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.htm!.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-400

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA MONDAY, NOVEMBER 26, 2012 FORTHCOMING MEETING (VIA A CONFERENCE CALL) WITH DUKE ENERGY REGARDING GENERIC LETTER 2004-02 2:00 P.M. - 3:00 P.M.

  • Introductions/Purpose of Conference
  • Project Status
  • Test Configuration and Procedure
  • Test Schedule
  • NRC Staff Questions and Comments
  • Summary of Items Requiring Action
  • Public Comments
  • Adjourn Enclosure

J. Quichocho -2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call or e-mail one of the meeting contacts listed below by November 20,2012,2:00 p.m.

(Eastern Time) to get the telephone number and the pass code.

MEETING CONTACTS: Araceli T. Billoch Colon, NRR Farideh E. Saba, NRR 301-415-3302 301-415-1447 Araceli. Bi lIoch@nrc.gov Farideh. Saba@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.htm!.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket Nos. 50-400

Enclosure:

Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-2 Reading RidsAcrsAcnw MailCTR Resource RidsNrrDorl Resource RidsNrrDorlLpl2-2 Resource RidsNrrPMRobinson Resource RidsNrrLABClaytonResource RidsOgcMailCenter Resource RidsOpaMail Resource RidsRgn2MailCenter Resource RidsNrrDssSsib Resource TWertz, NRR SKennedy. EDO RHannah, OPA RII JStang, NRR OWFN Receptionist (paper) TWFN Receptionist (paper) PMNS Resource JLedford,OPA RII SSmith, NRR FSaba, MRR SLingam. NRR ADAMS Accession No' .. ML12314A029 OFFICE DORLlLPL2-2/PM DORLlLPL2-2fLA DORLlLPL2-2/BC (A) DORLlLPL2-2/PM NAME ABillochCol6n BClayton JQuichocho ABillochCol6n DATE 11/9/12 11/9/12 11/13112 11/13/12 OFFICIAL RECORD COpy