Category:Letter
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] Category:Meeting Notice
MONTHYEARPMNS20230406, Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications2023-04-13013 April 2023 Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications PMNS20230333, Annual Assessment Meeting2023-03-29029 March 2023 Annual Assessment Meeting PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 22022-09-0909 September 2022 Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-25025 May 2022 Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-19019 May 2022 Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220324, Annual Assessment Meeting2022-03-30030 March 2022 Annual Assessment Meeting PMNS20220260, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No.2022-03-15015 March 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220016, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 22022-01-12012 January 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210775, Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 22021-06-10010 June 2021 Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210460, Annual Assessment Meeting2021-04-15015 April 2021 Annual Assessment Meeting PMNS20210152, Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 22021-02-11011 February 2021 Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC IR 05000261/20130082013-07-18018 July 2013 Notice of Regulatory Conference to Discuss One Finding and the Associated Apparent Violation for the H. B. Robinson, Unit 2, (Ref Inspection Report 05000261-13-008) ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13094A3892013-04-0404 April 2013 Meeting Notice with Public to Discuss the NRC Reactor Oversight Process Annual Assessment of Your H. B. Robinson Steam Electric Plant ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12076A1532012-03-16016 March 2012 4/11/2012 - Meeting Announcement - Category 1 Public Meeting - Annual Assessment of H. B. Robinson Steam Electric Plant ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1122318912011-08-11011 August 2011 Meeting Announcement - Category One - Regulatory Performance Meeting - Robinson Nuclear Plant - Docket No. 50-261 ML11180A0162011-07-0101 July 2011 Notice of Forthcoming Meeting with Carolina Power & Light Company Regarding H. B. Robinson Steam Electric Plant, Unit No. 2, to Introduce the New Management Team and Discuss Strategic Plan ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML1111701612011-04-27027 April 2011 Notice of Category 1 Public Meeting with Robinson Nuclear Plant Performance Improvement Plan ML1108406312011-03-29029 March 2011 Notice of Forthcoming Pre-Application Meeting with Carolina Power & Light Co. and Florida Power Corp., Brunswick Units 1 & 2, Crystal River Unit 3, and H.B. Robinson Unit 2, to Discuss Transition to the Requirements of National Fire.. ML1106305322011-03-0404 March 2011 Confirming Category 1 Public Meeting Scheduled for 03/24/11 Regarding Annual Assessment of H.B Robinson Steam Electric Plant ML1029403832010-10-21021 October 2010 Notice of Category 1 Public Meeting Announcement with H. B. Robinson - Regulatory and Enforcement Conference ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1013805902010-05-18018 May 2010 Meeting Announcement - Public Meeting - AIT Team Exit for H.B. Robinson Steam Electric Plant ML1011900022010-04-28028 April 2010 Notice of Meeting with Carolina Power and Light Company to Discuss H.B. Robinson Steam Electric Plant Fire Event on March 28, 2010 ML1008103012010-03-22022 March 2010 Notice of Meeting with Carolina Power and Light Company to Discuss NRC Reactor Oversight Process Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 ML1001910052010-01-29029 January 2010 Notice of Conference Call with Progress Energy Carolinas, Inc., to Discuss H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Response ML0918004532009-06-29029 June 2009 Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop ML0912708612009-05-0707 May 2009 Notice of Category 1 Public Meeting with Carolina Power & Light and Florida Power Corp., Regarding Brunswick Performance and Organizational Alignment within the Company ML0909605932009-04-0606 April 2009 Notice of Meeting with Carolina Power & Light Company to Discuss the NRC Reactor Oversight Process Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 ML0825209362008-09-0808 September 2008 Notice of Public Category 1 Meeting with Carolina Power & Light and Florida Power Corporation Organizational Alignment within the Company ML0819600282008-07-11011 July 2008 08/05-06/2008-Notice of Meeting - 2008 Us Nuclear Regulatory Commission Initial Examination Development Workshop ML0810800762008-04-17017 April 2008 Notice of Category 1 Public Meeting with Carolina Power and Light Company Annual Assessment of H. B. Robinson Steam Electric Plant ML0719401962007-07-13013 July 2007 Notice of Public Meeting with H. B. Robinson to Discuss Overall Robinson Unit 2 Status ML0713706072007-05-17017 May 2007 Notice of Meeting for NRC Training Managers' Conference Hosting by Rgn II ML0712202402007-05-0202 May 2007 Notice of Meeting with Carolina Power & Light Co to Discuss NRC Reactor Oversight Process Annual Assessment of H.B. Robinson Unit 2 ML0618700742006-07-0505 July 2006 and 07/20/2006 Meeting Announcement 2006 NRC Initial Exam Development Workshop to Clarify the Exam Development Process and Question Development for Both the Written and Operating Portion of the Initial Examination ML0607604842006-03-17017 March 2006 Meeting Announcement - Public Meeting H. B. Robinson Steam Electric Plant Unit 2 ML0607601762006-03-17017 March 2006 Meeting Announcement - Public Meeting H. B. Robinson Steam Electric Plant Unit 2, Docket No. 50-261 ML0513100272005-05-10010 May 2005 Notice of Meeting with Progress Energy Carolinas, Inc. to Provide Overview of Robinson Dry Fuel Storage Project and Discuss Related Licensing Issues 2023-04-13
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 6, 2009 Carolina Power and Light Company ATTN: Mr. Eric McCartney, Vice President H. B. Robinson Steam Electric Plant Unit 2 3851 West Entrance Road Hartsville, SC 29550
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY 1 PUBLIC MEETING - ANNUAL ASSESSMENT OF H. B. ROBINSON STEAM ELECTRIC PLANT, DOCKET NO.
50-261
Dear Mr. McCartney:
This letter confirms a Category 1 public meeting which has been scheduled for April 29, 2009, at 5:00 p.m. (EDT). The enclosed meeting notice provides additional details. The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of your H. B.
Robinson Steam Electric Plant.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4603.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-261 License Nos.: DPR-23
Enclosure:
As stated cc w/encl.: See page 2
_________________________ X SUNSI REVIEW /RAM/
OFFICE RII:DRP RII:DRP SIGNATURE KME /RA/ RAM /RA/
NAME KEllis RMusser DATE 04/03/2009 04/06/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 2 cc w/encl:
Brian C. McCabe David T. Conley Manager, Nuclear Regulatory Affairs Associate General Counsel Brunswick Steam Electric Plant Legal Dept.
Progress Energy Carolinas, Inc. Progress Energy Service Company, LLC Electronic Mail Distribution Electronic Mail Distribution Eric McCartney S. D. West Vice President Superintendent Security Carolina Power & Light Company H. B. Robinson Steam Electric Plant Electronic Mail Distribution Progress Energy Electronic Mail Distribution R. J. Duncan, II Vice President Susan E. Jenkins Nuclear Operations Director, Division of Waste Management Carolina Power & Light Company Bureau of Land and Waste Management Electronic Mail Distribution S.C. Department of Health and Environmental Control Ernest J. Kapopoulos, Jr. Electronic Mail Distribution Plant General Manager Carolina Power & Light Company R. Mike Gandy Electronic Mail Distribution Division of Radioactive Waste Mgmt.
S.C. Department of Health and Christos Kamilaris Environmental Control Director Electronic Mail Distribution Fleet Support Services Carolina Power & Light Company Beverly O. Hall Electronic Mail Distribution Chief, Radiation Protection Section Department of Environmental Health Curt A. Castell N.C. Department of Environmental Supervisor Commerce & Natural Resources Licensing/Regulatory Programs Electronic Mail Distribution Carolina Power & Light Company H. B. Robinson Steam Electric Plant John H. O'Neill, Jr.
3581 West Entrance Road Shaw, Pittman, Potts & Trowbridge Hartsville, SC 29550 2300 N. Street, NW Washington, DC 20037-1128 C. T. Baucom Manager Chairman Support Services - Nuclear North Carolina Utilities Commission Carolina Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Public Service Commission T. D. Walt State of South Carolina Vice President P.O. Box 11649 Nuclear Oversight Columbia, SC Carolina Power and Light Company cc w/encl. (continued page 3)
Electronic Mail Distribution
CP&L 3 cc w/encl (continued)
Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Carolina Power and Light Company H. B. Robinson Steam Electric Plant U.S. NRC 2112 Old Camden Rd Hartsville, SC 29550
CP&L 4 Letter to E. McCartney from Randall A. Musser dated April 6, 2009
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY 1 PUBLIC MEETING - ANNUAL ASSESSMENT OF H. B. ROBINSON STEAM ELECTRIC PLANT, DOCKET NO.
50-261 Distribution w/encl:
Region II Administrator=s Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Regional Counsel Region II State Liaison Officer Region II Public Affairs Officers Region II Resource Management Branch Chief Region II Receptionist PMNS Headquarters Operations Officer RIDSNRRDIRS RIDSNRRDIRSIPAB OEMAIL PUBLIC M. Vaaler, NRR R. Hagar, RII E. Morris, RII
SUBJECT:
PUBLIC MEETING WITH CAROLINA POWER AND LIGHT COMPANY FACILITY: H.B. Robinson Steam Electric Plant DOCKET: 50-261 DATE & TIME: Wednesday April 29, 2009, at 5:00 p.m.
5:00 p.m. - 6:45 p.m. - Open House and Poster Session 7:00 p.m. - 8:00 p.m. - Public Meeting Presentation, followed by a question and answer session Hartsville Public Library LOCATION:
147 W. College Ave Hartsville, SC 29550 PURPOSE: The purpose of the meeting is to discuss the NRC Reactor Oversight Process Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2.
The Annual Assessment Letter is accessible from the Publicly Available Records (PARS) component of NRC's document system (ADAMS)
(ML090630386) or http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/rob_2008q4.pdf The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact, listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRC OFFICE Region II PARTICIPATING:
PARTICIPANTS: NRC R. Musser, Chief, Reactor Projects Branch 4 E. Morris, Resident Inspector, Robinson J. Ledford, Public Affairs Officer MEETING Randall A. Musser CONTACT: 404-562-4603 Randy.Musser@nrc.gov AUDIO TELE- Not Available CONFERENCING VIDEO TELE- Not Available CONFERENCING Enclosure