Notice of Category 1 Public Meeting Announcement with H. B. Robinson - Regulatory and Enforcement Conference
ML102940383
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/21/2010
From: Hopper G
Reactor Projects Branch 7
To: Duncan R
Progress Energy Carolinas
References
Download: ML102940383 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 21, 2010 Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Robinson Plant H. B. Robinson Steam Electric Plant, Unit 2 3851 West Entrance Road Hartsville, SC 29550

SUBJECT:

PUBLIC MEETING ANNOUNCEMENT

- CATEGORY ONE - REGULATORY AND ENFORCEMENT CONFERENCE MEETING - H. B. ROBINSON STEAM ELECTRIC PLANT DOCKET NO. 50-261

Dear Mr. Duncan:

This letter is to inform you of a Category 1 public meeting which has been scheduled for November 8, 2010, at 1:00 p.m. Eastern Standard Time. The enclosed meeting notice provides additional details. The purpose of this Regulatory/Enforcement Conference, scheduled at your request, is to discuss the safety significance of one preliminary White finding with one associated Apparent Violation (AV) and the severity level of one AV considered for potential Escalated Enforcement that were documented in NRC Inspection Report 05000261/2010006 (ML102810633). These findings dealt with degradation of the B Emergency Diesel Generator (EDG) output breaker.

In accordance with 10 CFR 2.390 of the NRC=s "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4645.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.: 50-261 License Nos.: DPR-23

Enclosure:

As stated

October 21, 2010 Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Robinson Plant H. B. Robinson Steam Electric Plant, Unit 2 3851 West Entrance Road Hartsville, SC 29550

SUBJECT:

PUBLIC MEETING ANNOUNCEMENT

- CATEGORY ONE - REGULATORY AND ENFORCEMENT CONFERENCE MEETING - H. B. ROBINSON STEAM ELECTRIC PLANT DOCKET NO. 50-261

Dear Mr. Duncan:

This letter is to inform you of a Category 1 public meeting which has been scheduled for November 8, 2010, at 1:00

p. m. Eastern Standard Time. The enclosed meeting notice provides additional details. The purpose of this Regulatory/Enforcement Conference, scheduled at your request is to discuss the safety significance of one preliminary White finding with one associated Apparent Violation (AV) and the severity level of one AV considered for potential Escalated Enforcement that were documented in NRC Inspection Report 05000261/2010006 (ML102810633). These findings dealt with degradation of the B Emergency Diesel Generator (EDG) output breaker.

In accordance with 10 CFR 2.390 of the NRC=s "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s Agencywide document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4645.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket Nos.:

50-261 License Nos.:

DPR-23

Enclosure:

As stated X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:_ ML102940383 ___

X SUNSI REVIEW COMPLETE RAM OFFICE RII:DRP RII:DRP RII:DRP SIGNATURE NAME GHopper JWorosilo RMusser DATE 10/20/2010 10/20/2010 10/20/2010 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:

G:\\RPB4\\PROGESS ENERGY MEETINGS\\ROBINSON MEETING NOTICE ENF CONF NOVEMBER 2010.DOCX

CP&L 2

cc w/encl:

R. J. Duncan, II, Vice President H. B. Robinson Steam Electric Plant Unit 2 Carolina Power & Light Company Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.

Electronic Mail Distribution Christos Kamilaris, Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution Curt A. Castell, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Electronic Mail Distribution B. C. White, Manager Support Services - Nuclear Carolina Power & Light Company Electronic Mail Distribution S. D. West Superintendent Security H. B. Robinson Steam Electric Plant Progress Energy Electronic Mail Distribution Joseph W. Donahue Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution David T. Conley Associate General Counsel Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Scott Saunders, Plant General Manager Carolina Power & Light Company Electronic Mail Distribution Robert P. Gruber, Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 W. Lee Cox, III, Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 R. Mike Gandy Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution Chairman North Carolina Utilities Commission Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550

CP&L 3

Letter to Eric McCartney from George T. Hopper dated October 21, 2010

SUBJECT:

PUBLIC MEETING ANNOUNCEMENT

- CATEGORY ONE - REGULATORY AND ENFORCEMENT CONFERENCE MEETING - H. B. ROBINSON STEAM ELECTRIC PLANT DOCKET NO. 50-261 Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS RIDSNRRDIRSIPAB PUBLIC RidsNrrPMRobinson Resource Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS

Enclosure

SUBJECT:

PUBLIC MEETING WITH CAROLINA POWER AND LIGHT COMPANY FACILITY:

H.B. Robinson Steam Electric Plant DOCKET:

50-261 DATE & TIME:

Monday November 8, 2010, at 1:00 p.m.

1:00 p.m. - 4:00 p.m.

LOCATION:

245 Peachtree Center Ave NE, Suite 1200 Room 1486 Atlanta, GA 30303 PURPOSE:

The purpose of this Regulatory/Enforcement Conference is to discuss the safety significance of one preliminary White finding and associated Apparent Violation (AV) and the severity level of one AV considered for potential Escalated Enforcement that were documented in NRC Inspection Report 05000261/2010006 (ML102810633). These findings dealt with degradation of the B Emergency Diesel Generator (EDG) output breaker.

The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings CATEGORY:

This is a Category 1 meeting: Public participation is actively sought for this meeting to fully engage the public in a discussion of regulatory issues.

The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting contact listed below.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

NRC OFFICE Region II PARTICIPATING:

Enclosure

Attachment:

Agenda PARTICIPANTS:

NRC L. Reyes, Regional Administrator, Region II L. Wert, Director, Reactor Projects, Region II J. Bartley, Deputy Director, Reactor Projects(Acting), Region II J. Munday, Director, Reactor Safety, Region II H. Christensen, Deputy Director, Reactor Safety, Region II R. Musser, Chief, Reactor Projects Branch 4, Region II G. Hopper, Chief, Reactor Projects Branch 7, Region II J. Rivera, Senior Reactor Engineer, Region II J. Polickoski, Project Manager, Division of Operating Reactor Licensing G. MacDonald, Senior Reactor Analyst, Region II S. Sparks, Senior Enforcement Specialist, Office of Enforcement and Investigation Coordination, Region II LICENSEE J. Scarola, Senior Vice President and Chief Nuclear Officer R. Duncan, Vice-President - Robinson Plant W. Farmer, Director of Engineering - Robinson Plant C. Morris, Maintenance Manager - Robinson Plant C. Castell, Licensing Supervisor - Robinson Plant B. McCabe, Manager, Regulatory Affairs - Nuclear Generation Group B. Rishel, Manager Probabilistic Safety Assessment - Nuclear Generation Group MEETING CONTACT:

George T. Hopper 404-997-4645 George.Hopper@nrc.gov AUDIO TELE-CONFERENCING:

Interested members of the public can participate in this meeting via a toll-free audio teleconference: 888-790-1646, Pass code: 36051 #

VIDEO TELE-CONFERENCING:

Not Available

Attachment REGULATORY AND ENFORCEMENT CONFERENCE AGENDA CAROLINA POWER AND LIGHT COMPANY NOVEMBER 08, 2010 NRC REGION II OFFICE, ATLANTA, GEORGIA I.

OPENING REMARKS AND INTRODUCTION II.

NRC REGULATORY AND ENFORCEMENT POLICY III.

STATEMENT OF ISSUES AND APPARENT VIOLATIONS IV.

CAROLINA POWER AND LIGHT COMPANY V.

BREAK/NRC CAUCUS VI.

NRC FOLLOW UP QUESTIONS VII.

CLOSING REMARKS