MONTHYEARIR 05000261/20240032024-10-30030 October 2024 Integrated Inspection Report 05000261/2024003 ML24297A2182024-10-28028 October 2024 – NRC Operator License IR 05000261/20244022024-10-16016 October 2024 – Security Target Set Baseline Inspection Report 05000261/2024402 IR 05000261/20244012024-09-11011 September 2024 Security Baseline Inspection Report 05000261/2024401 IR 05000261/20240052024-08-22022 August 2024 Updated Inspection Plan for H.B. Robinson Steam Electric Plant - Report 05000261/2024005 ML24169A2712024-08-14014 August 2024 – Issuance of Amendment No. 280 to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification 5.7, High Radiation Area IR 05000261/20240022024-08-0101 August 2024 Integrated Inspection Report 05000261/2024002 ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000261/20240112024-06-0303 June 2024 Focused Engineering Inspection- Commercial Grade Dedication Report 05000261/2024011 ML24114A0152024-06-0303 June 2024 Unit 2 – Issuance of Amendment No. 279 Regarding Application of Leak-Before-Break Methodology for Auxiliary Reactor Coolant System Piping IR 05000261/20240012024-05-0909 May 2024 Integrated Inspection Report 05000261/2024001 IR 05000261/20240102024-04-30030 April 2024 Biennial Problem Identification and Resolution Inspection Report 05000261/2024010 IR 05000261/20230062024-02-28028 February 2024 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 - Report 05000261-2023006 IR 05000261/20243012024-02-0606 February 2024 – Notification of Licensed Operator Initial Examination 05000261/2024301 ML24033A0592024-02-0202 February 2024 Response to Request for Additional Information License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology IR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 – Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 – Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) 05000261/LER-2023-002, Plant Trip During Reactor Protection System Testing2023-08-17017 August 2023 Plant Trip During Reactor Protection System Testing 05000261/LER-2023-001, Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation2023-08-10010 August 2023 Condition Prohibited by Technical Specification Due to Missed Entry Into Limiting Condition for Operation IR 05000261/20230022023-08-0707 August 2023 – Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 – Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 – Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 – Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 2024-09-11
[Table view] Category:Meeting Notice
MONTHYEARPMNS20240596, Public Meeting with Duke Energy Progress, LLC to Discuss Methods to Review Plant-Specific Topical Reports for H.B. Robinson Steam Electric Plant, Unit 22024-04-26026 April 2024 Public Meeting with Duke Energy Progress, LLC to Discuss Methods to Review Plant-Specific Topical Reports for H.B. Robinson Steam Electric Plant, Unit 2 PMNS20240492, Duke Sites Annual Assessment Meeting2024-04-10010 April 2024 Duke Sites Annual Assessment Meeting PMNS20230406, Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications2023-04-13013 April 2023 Meeting with Duke Energy to Discuss License Amendment Request to Add Feedwater Isolation on Steam Generator Level High-High to Technical Specifications PMNS20230333, Annual Assessment Meeting2023-03-29029 March 2023 Annual Assessment Meeting PMNS20220916, Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 22022-09-0909 September 2022 Public Meeting with Duke Energy to Discuss a Planned TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1, License Amendment Request Supplement for H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220536, Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-25025 May 2022 Duke Energy Progress, LLC Discussion Regarding TSTF-577 Request for Additional Information Response Regarding for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220533, Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 22022-05-19019 May 2022 Pre-submittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Technical Specification 3.3.2 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220324, Annual Assessment Meeting2022-03-30030 March 2022 Annual Assessment Meeting PMNS20220260, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No.2022-03-15015 March 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Removal of 4.160 Kv Bus 2 from Surveillance Requirements (SR) 3.8.1.16 for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20220016, Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 22022-01-12012 January 2022 Presubmittal Meeting with Duke Energy Progress, LLC to Discuss a Future Licensing Submittal Regarding Proposed Revision to Technical Specification (TS) 3.5.3, ECCS - Shutdown, for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210775, Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 22021-06-10010 June 2021 Presubmittal Meeting with Duke Energy Progress, Llc., to Discuss a Future Licensing Submittal of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections for the H. B. Robinson Steam Electric Plant, Unit No. 2 PMNS20210460, Annual Assessment Meeting2021-04-15015 April 2021 Annual Assessment Meeting PMNS20210152, Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 22021-02-11011 February 2021 Presubmittal Meeting with Duke Energy Progress, Llc. to Discuss a Future Relief Request Concerning Containment Metallic Liners and Moisture Barriers Inspection Requirements for the H. B. Robinson Steam Electric Plant, Unit No. 2 ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC IR 05000261/20130082013-07-18018 July 2013 Notice of Regulatory Conference to Discuss One Finding and the Associated Apparent Violation for the H. B. Robinson, Unit 2, (Ref Inspection Report 05000261-13-008) ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML13094A3892013-04-0404 April 2013 Meeting Notice with Public to Discuss the NRC Reactor Oversight Process Annual Assessment of Your H. B. Robinson Steam Electric Plant ML13072B2022013-03-19019 March 2013 Meeting Notice with Duke Energy Concerning NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants License Amendment Request for Catawba, McGuire, and H. B. Robinson ML12314A0292012-11-13013 November 2012 Forthcoming Meeting Notice Via Conference Call with Duke Energy Regarding Generic Letter 2004-02 and NRC Staff Review of Draft Proposed Strainer Fiber Bypass Test Plant for H.B. Robinson Steam Electric Plant, Unit 2 ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12284A4612012-10-12012 October 2012 Forthcoming Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-Design-Basis External Events ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12076A1532012-03-16016 March 2012 4/11/2012 - Meeting Announcement - Category 1 Public Meeting - Annual Assessment of H. B. Robinson Steam Electric Plant ML1123601792011-08-24024 August 2011 8/25/2011- Robinson Nuclear Plant Regulatory Performance Meeting Slides ML1122318912011-08-11011 August 2011 Meeting Announcement - Category One - Regulatory Performance Meeting - Robinson Nuclear Plant - Docket No. 50-261 ML11180A0162011-07-0101 July 2011 Notice of Forthcoming Meeting with Carolina Power & Light Company Regarding H. B. Robinson Steam Electric Plant, Unit No. 2, to Introduce the New Management Team and Discuss Strategic Plan ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML1111701612011-04-27027 April 2011 Notice of Category 1 Public Meeting with Robinson Nuclear Plant Performance Improvement Plan ML1108406312011-03-29029 March 2011 Notice of Forthcoming Pre-Application Meeting with Carolina Power & Light Co. and Florida Power Corp., Brunswick Units 1 & 2, Crystal River Unit 3, and H.B. Robinson Unit 2, to Discuss Transition to the Requirements of National Fire.. ML1106305322011-03-0404 March 2011 Confirming Category 1 Public Meeting Scheduled for 03/24/11 Regarding Annual Assessment of H.B Robinson Steam Electric Plant ML1029403832010-10-21021 October 2010 Notice of Category 1 Public Meeting Announcement with H. B. Robinson - Regulatory and Enforcement Conference ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1013805902010-05-18018 May 2010 Meeting Announcement - Public Meeting - AIT Team Exit for H.B. Robinson Steam Electric Plant ML1011900022010-04-28028 April 2010 Notice of Meeting with Carolina Power and Light Company to Discuss H.B. Robinson Steam Electric Plant Fire Event on March 28, 2010 ML1008103012010-03-22022 March 2010 Notice of Meeting with Carolina Power and Light Company to Discuss NRC Reactor Oversight Process Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 ML1001910052010-01-29029 January 2010 Notice of Conference Call with Progress Energy Carolinas, Inc., to Discuss H. B. Robinson Steam Electric Plant, Unit 2, Generic Letter 2004-02 Supplemental Response ML0918004532009-06-29029 June 2009 Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop ML0912708612009-05-0707 May 2009 Notice of Category 1 Public Meeting with Carolina Power & Light and Florida Power Corp., Regarding Brunswick Performance and Organizational Alignment within the Company ML0909605932009-04-0606 April 2009 Notice of Meeting with Carolina Power & Light Company to Discuss the NRC Reactor Oversight Process Annual Assessment of H.B. Robinson Steam Electric Plant Unit 2 ML0825209362008-09-0808 September 2008 Notice of Public Category 1 Meeting with Carolina Power & Light and Florida Power Corporation Organizational Alignment within the Company ML0819600282008-07-11011 July 2008 08/05-06/2008-Notice of Meeting - 2008 Us Nuclear Regulatory Commission Initial Examination Development Workshop ML0810800762008-04-17017 April 2008 Notice of Category 1 Public Meeting with Carolina Power and Light Company Annual Assessment of H. B. Robinson Steam Electric Plant ML0719401962007-07-13013 July 2007 Notice of Public Meeting with H. B. Robinson to Discuss Overall Robinson Unit 2 Status ML0713706072007-05-17017 May 2007 Notice of Meeting for NRC Training Managers' Conference Hosting by Rgn II ML0712202402007-05-0202 May 2007 Notice of Meeting with Carolina Power & Light Co to Discuss NRC Reactor Oversight Process Annual Assessment of H.B. Robinson Unit 2 ML0618700742006-07-0505 July 2006 and 07/20/2006 Meeting Announcement 2006 NRC Initial Exam Development Workshop to Clarify the Exam Development Process and Question Development for Both the Written and Operating Portion of the Initial Examination ML0607604842006-03-17017 March 2006 Meeting Announcement - Public Meeting H. B. Robinson Steam Electric Plant Unit 2 2024-04-26
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 11, 2011 Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Robinson Plant H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY PERFORMANCE MEETING - ROBINSON NUCLEAR PLANT - DOCKET NO.
50-261
Dear Mr. Duncan:
This letter confirms a Category 1 meeting which has been scheduled for August 25, 2011, at 2:00 p.m. The meeting notice, which provides location and additional details, is enclosed. The purpose of this Regulatory Performance Meeting is to discuss corrective actions associated with the Unplanned Scrams per 7000 Critical Hours performance indicator crossing the threshold from Green to White in the third quarter of 2010 and the three White Inspection findings that were documented in NRC Inspection Reports 05000261/2010006 and 05000261/2011008. The findings dealt with the licensees failure to: (1). correct a condition adverse to quality in B Emergency Diesel Generator output breaker 52/27B, (2). adequately design and implement operator training based on learning objectives as required by 10 CFR 55.59(c), and (3).
adequately implement requirements of multiple procedures required by Technical Specification 5.4.1, during an uncontrolled cooldown of the Reactor Coolant System and subsequent safety injection after a reactor trip on March 28, 2010.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
CP&L 2 Should you have any questions concerning this meeting, please contact me at (404) 997-4603.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23
Enclosure:
As stated
CP&L 2 Should you have any questions concerning this meeting, please contact me at (404) 997-4603.
Sincerely,
/RA/
Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-261 License Nos.: DPR-23
Enclosure:
As stated X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:___ML112231891____________ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE /RA/ by email RAM /RA/
NAME JWorosilo RMusser DATE 08/11/2011 08/11/2011 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRPII\RPB4\PROGESS ENERGY MEETINGS\2011\ROBINSON REGULATORY MEETING NOTICE.DOCX
CP&L 3 cc w/encl: Richard Haynes Division of Radiological Health Director, Division of Waste Management TN Dept. of Environment & Conservation Bureau of Land and Waste Management 401 Church Street S.C. Department of Health and Nashville, TN 37243-1532 Environmental Control Electronic Mail Distribution Sandra Threatt, Manager Nuclear Response and Emergency Kelvin Henderson Environmental Surveillance General Manager Bureau of Land and Waste Management Nuclear Fleet Operations Department of Health and Environmental Progress Energy Control Electronic Mail Distribution Electronic Mail Distribution Thomas Cosgrove Robert J. Duncan II Plant General Manager Vice President H.B. Robinson Steam Electric Plant, Unit 2 H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Donna B. Alexander Brian C. McCabe Manager, Nuclear Regulatory Affairs Manager, Nuclear Oversight (interim)
Shearon Harris Nuclear Power Plant Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution Robert P. Gruber Scott D. West Executive Director Superintendent Security Public Staff - NCUC H. B. Robinson Steam Electric Plant 4326 Mail Service Center Progress Energy Raleigh, NC 27699-4326 Electronic Mail Distribution W. Lee Cox, III Joseph W. Donahue Section Chief Vice President Radiation Protection Section Nuclear Oversight N.C. Department of Environmental Progress Energy Commerce & Natural Resources Electronic Mail Distribution Electronic Mail Distribution David T. Conley Greg Kilpatrick Senior Counsel Operations Manager Legal Department H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Progress Energy Electronic Mail Distribution Electronic Mail Distribution John H. O'Neill, Jr. cc w/encl. (continued next page)
Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128
CP&L 4 cc w/encl. (continued) Supervisor, Licensing/Regulatory Programs Mark Yeager (Vacant)
Division of Radioactive Waste Mgmt. H. B. Robinson Steam Electric Plant S.C. Department of Health and 3581 West Entrance Rd.
Environmental Control Hartsville, SC 29550 Electronic Mail Distribution John W. Flitter Public Service Commission Director of Electric & Gas Regulation State of South Carolina South Carolina Office of Regulatory Staff P.O. Box 11649 Electronic Mail Distribution Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550 William R. Gideon Director Site Operations H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Terry D. Hobbs Plant General Manager Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution
CP&L 5 Letter to Robert J. Duncan II from Randall A. Musser dated August 11, 2011
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY PERFORMANCE MEETING - ROBINSON NUCLEAR PLANT - DOCKET NO.
50-261 Distribution w/encl:
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource
SUBJECT:
PUBLIC MEETING WITH CAROLINA POWER AND LIGHT COMPANY FACILITY: Robinson Nuclear Plant DOCKET: 50-261 DATE & TIME: Thursday, August 25, 2011 2:00 p.m. - 3:30 p.m.
LOCATION:
Hartsville Public Library 147 W. College Ave Hartsville, SC 29550 PURPOSE: The purpose of this Regulatory Performance Meeting is to discuss Robinson Nuclear Plants corrective actions associated with the Unplanned Scrams per 7000 Critical Hours performance indicator crossing the threshold from Green to White in the third quarter of 2010 and the three White Inspection findings that were documented in NRC Inspection Reports 05000261/2010006 and 05000261/2011008.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding visitors and security.
CATEGORY: This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact, listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
NRC OFFICE Region II PARTICIPATING:
PARTICIPANTS: NRC L. Wert, Deputy Regional Administrator, Region II R. Musser, Chief, Reactor Projects Branch 4, Region II T. Chandler, Acting Senior Resident Inspector, Robinson, Region II F. Ehrhardt, Senior Reactor Inspector, Region II LICENSEE Robert J. Duncan, Vice-President - Robinson Plant William R. Gideon, Director Site Operations - Robinson Plant Thomas Cosgrove, Plant General Manager - Robinson Plant Enclosure
2 MEETING Randall A. Musser CONTACT: 404-997-4603 Randy.Musser@nrc.gov Interested members of the public can participate in this meeting via a toll-free AUDIO TELE-audio teleconference. For details, please call the NRC meeting contact CONFERENCING listed above by August 24, 2011, or call the NRCs toll-free number, 1-800-368-5642, and ask the operator to be connected to Randy Musser.
VIDEO TELE- Not Available CONFERENCING Enclosure