UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 11, 2011 Carolina Power and Light Company ATTN: Mr. Robert J. Duncan, II Vice President - Robinson Plant H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY PERFORMANCE MEETING - ROBINSON NUCLEAR PLANT - DOCKET NO.

50-261

Dear Mr. Duncan:

This letter confirms a Category 1 meeting which has been scheduled for August 25, 2011, at 2:00 p.m. The meeting notice, which provides location and additional details, is enclosed. The purpose of this Regulatory Performance Meeting is to discuss corrective actions associated with the Unplanned Scrams per 7000 Critical Hours performance indicator crossing the threshold from Green to White in the third quarter of 2010 and the three White Inspection findings that were documented in NRC Inspection Reports 05000261/2010006 and 05000261/2011008. The findings dealt with the licensees failure to: (1). correct a condition adverse to quality in B Emergency Diesel Generator output breaker 52/27B, (2). adequately design and implement operator training based on learning objectives as required by 10 CFR 55.59(c), and (3).

adequately implement requirements of multiple procedures required by Technical Specification 5.4.1, during an uncontrolled cooldown of the Reactor Coolant System and subsequent safety injection after a reactor trip on March 28, 2010.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

CP&L 2

Should you have any questions concerning this meeting, please contact me at (404) 997-4603.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.:

50-261 License No.: DPR-23

Enclosure:

As stated

CP&L 2

Should you have any questions concerning this meeting, please contact me at (404) 997-4603.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-261 License Nos.: DPR-23

Enclosure:

As stated X PUBLICLY AVAILABLE G NON-PUBLICLY AVAILABLE G SENSITIVE X NON-SENSITIVE ADAMS: X Yes ACCESSION NUMBER:___ML112231891____________

X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE

/RA/ by email RAM /RA/

NAME JWorosilo RMusser DATE 08/11/2011 08/11/2011 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME:

G:\\DRPII\\RPB4\\PROGESS ENERGY MEETINGS\\2011\\ROBINSON REGULATORY MEETING NOTICE.DOCX

CP&L 3

cc w/encl:

Division of Radiological Health TN Dept. of Environment & Conservation 401 Church Street Nashville, TN 37243-1532 Sandra Threatt, Manager Nuclear Response and Emergency Environmental Surveillance Bureau of Land and Waste Management Department of Health and Environmental Control Electronic Mail Distribution Robert J. Duncan II Vice President H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution Scott D. West Superintendent Security H. B. Robinson Steam Electric Plant Progress Energy Electronic Mail Distribution Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Richard Haynes Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution Thomas Cosgrove Plant General Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim)

Progress Energy Electronic Mail Distribution Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Greg Kilpatrick Operations Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution cc w/encl. (continued next page)

CP&L 4

cc w/encl. (continued)

Mark Yeager Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution Henry Curry Training Manager H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Senior Resident Inspector U.S. Nuclear Regulatory Commission H. B. Robinson Steam Electric Plant 2112 Old Camden Rd Hartsville, SC 29550 William R. Gideon Director Site Operations H. B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Christos Kamilaris Manager, Support Services H.B. Robinson Steam Electric Plant, Unit 2 Progress Energy Electronic Mail Distribution Terry D. Hobbs Plant General Manager Brunswick Steam Electric Plant Carolina Power & Light Company Electronic Mail Distribution Supervisor, Licensing/Regulatory Programs (Vacant)

H. B. Robinson Steam Electric Plant 3581 West Entrance Rd.

Hartsville, SC 29550 John W. Flitter Director of Electric & Gas Regulation South Carolina Office of Regulatory Staff Electronic Mail Distribution

CP&L 5

Letter to Robert J. Duncan II from Randall A. Musser dated August 11, 2011

SUBJECT:

MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY PERFORMANCE MEETING - ROBINSON NUCLEAR PLANT - DOCKET NO.

50-261 Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource

Enclosure

SUBJECT:

PUBLIC MEETING WITH CAROLINA POWER AND LIGHT COMPANY FACILITY:

Robinson Nuclear Plant DOCKET:

50-261 DATE & TIME:

Thursday, August 25, 2011 2:00 p.m. - 3:30 p.m.

LOCATION:

Hartsville Public Library 147 W. College Ave Hartsville, SC 29550 PURPOSE:

The purpose of this Regulatory Performance Meeting is to discuss Robinson Nuclear Plants corrective actions associated with the Unplanned Scrams per 7000 Critical Hours performance indicator crossing the threshold from Green to White in the third quarter of 2010 and the three White Inspection findings that were documented in NRC Inspection Reports 05000261/2010006 and 05000261/2011008.

The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding visitors and security.

CATEGORY:

This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact, listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

NRC OFFICE PARTICIPATING:

Region II PARTICIPANTS:

NRC L. Wert, Deputy Regional Administrator, Region II R. Musser, Chief, Reactor Projects Branch 4, Region II T. Chandler, Acting Senior Resident Inspector, Robinson, Region II F. Ehrhardt, Senior Reactor Inspector, Region II LICENSEE Robert J. Duncan, Vice-President - Robinson Plant William R. Gideon, Director Site Operations - Robinson Plant Thomas Cosgrove, Plant General Manager - Robinson Plant

2 Enclosure MEETING CONTACT:

Randall A. Musser 404-997-4603 Randy.Musser@nrc.gov AUDIO TELE-CONFERENCING Interested members of the public can participate in this meeting via a toll-free audio teleconference. For details, please call the NRC meeting contact listed above by August 24, 2011, or call the NRCs toll-free number, 1-800-368-5642, and ask the operator to be connected to Randy Musser.

VIDEO TELE-CONFERENCING Not Available