{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO:               File FROM:                         Steven D. Rose, Chief       /RA/
-1257 May 3, 2016 MEMORANDUM TO:
Reactor Projects Branch 5 Division of Reactor Projects
File FROM:   Steven D. Rose, Chief       /RA/ Reactor Projects Branch 5 Division of Reactor Projects


==SUBJECT:==
==SUBJECT:==
Line 23: Line 22:


==SUMMARY==
==SUMMARY==
 
- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout.
- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO.
50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA.
The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2 , with the public for the period of January 1, 201 5 - December 31, 201
: 5. Enclosed is a list of attendees and the meeting handout.
The following NRC staff attended the public meeting:
The following NRC staff attended the public meeting:
Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hanna h , RI I Senior Public Affairs Officer Gregory Croon , RII Senior Resident Inspector, North Anna Gwynne R. Eatmon , RII Resident Inspector, North Anna Estaline Hayes , RII Office Assistant, North Anna Docket No s.: 50-338/50-339 License No s.: NPF-4/NPF-7
Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Meeting Handout  
: 2. Meeting Handout
 
North Anna Power Station, Units 1 and 2 Annual Assessment Meeting 2015 Reactor Oversight Process Nuclear Regulatory Commission Region 2
 
NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials
 
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection                    Performance Indicator Results                                Results Significance                    Significance Threshold                      Threshold Action Matrix Regulatory Response
 
Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas (Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution)
 
Significance Threshold Performance Indicators Green  Baseline Inspection White  Requires additional NRC oversight Yellow  Requires more NRC oversight Red    Requires most NRC oversight Inspection Findings Green  Very low safety issue White  Low to moderate safety issue Yellow  Substantial safety issue Red    High safety issue
 
Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response                Degraded      Performance Increasing
* Safety Significance
* Inspection
* Management Involvement
* Regulatory Action
 
NRC Annual Assessment Summary North Anna Power Station, Units 1 and 2 VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix for all of 2015.
 
NRC Inspection Activities North Anna Power Station, Units 1 and 2 for 2015 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection Inspection
 
North Anna Power Station, Units 1 and 2 PIs and Findings Performance Indicators were all Green 9 Green NCV inspection findings No greater than Green inspection findings
 
NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.
 
National Summary of Plant Performance Status as of 02/22/2016 Licensee Response                    90 Regulatory Response                    7 Degraded Cornerstone                  0 Multiple/Repetitive Deg. Cornerstone  3 Unacceptable                          0 IMC 0350 Oversight                    0 Total                                100
 
Actions in Response to the Japan Nuclear Accident
* Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html
* Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
* Office of Public Affairs Point of
 
==Contact:==
OPA.resource@nrc.gov or 301-415-8200
 
Open to the Public
* The NRC places a high priority on keeping the public and stakeholders informed of its activities.
* At www.nrc.gov, you can:
  - Find public meeting dates and transcripts;
  - Read NRC testimony, speeches, press releases, and policy decisions; and
  - Access the agencys Electronic Reading Room to find NRC publications and documents.


North Anna Power Station, Units 1 and 2Annual Assessment Meeting 2015 Reactor Oversight ProcessNuclear Regulatory Commission Region 2 NRC Strategic Plan Goals Safety-Ensure adequate protection of public health and safety and the environment Security-Ensure adequate protection in the secure use and management of radioactive materials Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas Regulatory FrameworkNRC's Safety Mission Strategic Performance AreasCornerstonesCross-Cutting Areas(Human Performance
Contacting the NRC
--Safety Conscious Work Environment
* Report an emergency
--Problem Identification & Resolution)
  - (301) 816-5100 (call collect)
Significance Threshold GreenBaseline Inspection WhiteRequires additional NRC oversight YellowRequires more NRC oversight RedRequires most NRC oversightPerformance IndicatorsInspection Findings GreenVery low safety issue WhiteLow to moderate safety issue YellowSubstantial safety issue RedHigh safety issue Action Matrix ColumnsIncreasingSafety SignificanceInspection Management InvolvementRegulatory ActionLicensee ResponseRegulatoryResponseDegradedMultiple/RepetitiveDegradedUnacceptable Performance NRC Annual Assessment Summary VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
* Report a safety concern
North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix for all of 2015.North Anna Power Station, Units 1 and 2 NRC Inspection Activities Two Resident Inspectors on Site Implemented baseline inspection program Inspected in
  - (800) 695-7403
-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection InspectionNorth Anna Power Station, Units 1 and 2 for 2015 North Anna Power Station, Units 1 and 2  PIs and Findings Performance Indicators were all Green 9 GreenNCV inspection findings No greater than Green inspection findings NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.
  - Allegation@nrc.gov
National Summary of Plant PerformanceStatus as of 02/22/2016Licensee Response 90Regulatory Response 7Degraded Cornerstone 0Multiple/Repetitive Deg. Cornerstone 3Unacceptable 0IMC 0350 Oversight 0Total 100 Actions in Response to the Japan Nuclear AccidentActions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan
* General information or questions
-info.htmlMailbox for comments on staff actions: JLD_Public.Resource@nrc.govOffice of Public Affairs Point of Contact: OPA.resource@nrc.gov or 301-415-8200 Open to the PublicThe NRC places a high priority on keeping the public and stakeholders informed of its activities. At www.nrc.gov, you can:
  - www.nrc.gov
-Find public meeting dates and transcripts;
  - Select What We Do for Public Affairs
-Read NRC testimony, speeches, press releases, and policy decisions; and
-Access the agency's Electronic Reading Room to find


NRC publications and documents.
NRC Social Media Tools
Contacting the NRCReport an emergency
* NRC Blog http://public-blog.nrc-gateway.gov/
-(301) 816-5100 (call collect)Report a safety concern   
* NRC Twitter https://twitter.com/#!/NRCgov
-(800) 695-7403  -Allegation@nrc.govGeneral information or questions
* NRC Chat http://chat.nrc-gateway.gov/
-www.nrc.gov
* NRC YouTube http://www.youtube.com/user/NRCgov
-Select "What We Do" for Public Affairs NRC Social Media ToolsNRC Blog http://public
* NRC Flickr Gallery http://www.flickr.com/people/NRCgov
-blog.nrc-gateway.gov
* NRC RSS Feeds http://www.nrc.gov/public- involve/listserver.html#rss NRC GovDelivery -
/NRC Twitter https://twitter.com/#!/NRCgovNRC Chat http://chat.nrc
https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC
-gateway.gov/NRC YouTube http://www.youtube.com/user/NRCgovNRC Flickr Gallery http://www.flickr.com/people/NRCgovNRC RSS Feeds http://www.nrc.gov/public
 
-involve/listserver.html#rssNRC GovDelivery
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO:               File FROM:                         Steven D. Rose, Chief       /RA/
-https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303
Reactor Projects Branch 5 Division of Reactor Projects
-1257 May 3, 2016 MEMORANDUM TO:
File FROM:   Steven D. Rose, Chief       /RA/ Reactor Projects Branch 5 Division of Reactor Projects


==SUBJECT:==
==SUBJECT:==
Line 65: Line 99:


==SUMMARY==
==SUMMARY==
 
- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout.
- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO.
50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA.
The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2 , with the public for the period of January 1, 201 5 - December 31, 201
: 5. Enclosed is a list of attendees and the meeting handout.
The following NRC staff attended the public meeting:
The following NRC staff attended the public meeting:
Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hanna h , RI I Senior Public Affairs Officer Gregory Croon , RII Senior Resident Inspector, North Anna Gwynne R. Eatmon , RII Resident Inspector, North Anna Estaline Hayes , RII Office Assistant, North Anna Docket No s.: 50-338/50-339 License No s.: NPF-4/NPF-7
Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Meeting Handout  
: 2. Meeting Handout
 
North Anna Power Station, Units 1 and 2 Annual Assessment Meeting 2015 Reactor Oversight Process Nuclear Regulatory Commission Region 2
 
NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials
 
Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection                    Performance Indicator Results                                Results Significance                    Significance Threshold                      Threshold Action Matrix Regulatory Response
 
Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas (Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution)
 
Significance Threshold Performance Indicators Green  Baseline Inspection White  Requires additional NRC oversight Yellow  Requires more NRC oversight Red    Requires most NRC oversight Inspection Findings Green  Very low safety issue White  Low to moderate safety issue Yellow  Substantial safety issue Red    High safety issue
 
Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response                Degraded      Performance Increasing
* Safety Significance
* Inspection
* Management Involvement
* Regulatory Action
 
NRC Annual Assessment Summary North Anna Power Station, Units 1 and 2 VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix for all of 2015.
 
NRC Inspection Activities North Anna Power Station, Units 1 and 2 for 2015 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection Inspection
 
North Anna Power Station, Units 1 and 2 PIs and Findings Performance Indicators were all Green 9 Green NCV inspection findings No greater than Green inspection findings
 
NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.
 
National Summary of Plant Performance Status as of 02/22/2016 Licensee Response                    90 Regulatory Response                    7 Degraded Cornerstone                  0 Multiple/Repetitive Deg. Cornerstone  3 Unacceptable                          0 IMC 0350 Oversight                    0 Total                                100
 
Actions in Response to the Japan Nuclear Accident
* Actions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan-info.html
* Mailbox for comments on staff actions:
JLD_Public.Resource@nrc.gov
* Office of Public Affairs Point of
 
==Contact:==
OPA.resource@nrc.gov or 301-415-8200
 
Open to the Public
* The NRC places a high priority on keeping the public and stakeholders informed of its activities.
* At www.nrc.gov, you can:
  - Find public meeting dates and transcripts;
  - Read NRC testimony, speeches, press releases, and policy decisions; and
  - Access the agencys Electronic Reading Room to find NRC publications and documents.


North Anna Power Station, Units 1 and 2Annual Assessment Meeting 2015 Reactor Oversight ProcessNuclear Regulatory Commission Region 2 NRC Strategic Plan Goals Safety-Ensure adequate protection of public health and safety and the environment Security-Ensure adequate protection in the secure use and management of radioactive materials Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas Regulatory FrameworkNRC's Safety Mission Strategic Performance AreasCornerstonesCross-Cutting Areas(Human Performance
Contacting the NRC
--Safety Conscious Work Environment
* Report an emergency
--Problem Identification & Resolution)
  - (301) 816-5100 (call collect)
Significance Threshold GreenBaseline Inspection WhiteRequires additional NRC oversight YellowRequires more NRC oversight RedRequires most NRC oversightPerformance IndicatorsInspection Findings GreenVery low safety issue WhiteLow to moderate safety issue YellowSubstantial safety issue RedHigh safety issue Action Matrix ColumnsIncreasingSafety SignificanceInspection Management InvolvementRegulatory ActionLicensee ResponseRegulatoryResponseDegradedMultiple/RepetitiveDegradedUnacceptable Performance NRC Annual Assessment Summary VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.
* Report a safety concern
North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix for all of 2015.North Anna Power Station, Units 1 and 2 NRC Inspection Activities Two Resident Inspectors on Site Implemented baseline inspection program Inspected in
  - (800) 695-7403
-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection InspectionNorth Anna Power Station, Units 1 and 2 for 2015 North Anna Power Station, Units 1 and 2  PIs and Findings Performance Indicators were all Green 9 GreenNCV inspection findings No greater than Green inspection findings NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.
  - Allegation@nrc.gov
National Summary of Plant PerformanceStatus as of 02/22/2016Licensee Response 90Regulatory Response 7Degraded Cornerstone 0Multiple/Repetitive Deg. Cornerstone 3Unacceptable 0IMC 0350 Oversight 0Total 100 Actions in Response to the Japan Nuclear AccidentActions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan
* General information or questions
-info.htmlMailbox for comments on staff actions: JLD_Public.Resource@nrc.govOffice of Public Affairs Point of Contact: OPA.resource@nrc.gov or 301-415-8200 Open to the PublicThe NRC places a high priority on keeping the public and stakeholders informed of its activities. At www.nrc.gov, you can:
  - www.nrc.gov
-Find public meeting dates and transcripts;
  - Select What We Do for Public Affairs
-Read NRC testimony, speeches, press releases, and policy decisions; and
-Access the agency's Electronic Reading Room to find


NRC publications and documents.
NRC Social Media Tools
Contacting the NRCReport an emergency
* NRC Blog http://public-blog.nrc-gateway.gov/
-(301) 816-5100 (call collect)Report a safety concern   
* NRC Twitter https://twitter.com/#!/NRCgov
-(800) 695-7403  -Allegation@nrc.govGeneral information or questions
* NRC Chat http://chat.nrc-gateway.gov/
-www.nrc.gov
* NRC YouTube http://www.youtube.com/user/NRCgov
-Select "What We Do" for Public Affairs NRC Social Media ToolsNRC Blog http://public
* NRC Flickr Gallery http://www.flickr.com/people/NRCgov
-blog.nrc-gateway.gov
* NRC RSS Feeds http://www.nrc.gov/public- involve/listserver.html#rss NRC GovDelivery -
/NRC Twitter https://twitter.com/#!/NRCgovNRC Chat http://chat.nrc
https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC}}
-gateway.gov/NRC YouTube http://www.youtube.com/user/NRCgovNRC Flickr Gallery http://www.flickr.com/people/NRCgovNRC RSS Feeds http://www.nrc.gov/public
-involve/listserver.html#rssNRC GovDelivery
-https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC}}

Latest revision as of 16:19, 4 December 2019

April 14, 2016, Summary of Public Meeting - North Anna Power Station, Units 1 and 2
ML16124A763
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 05/03/2016
From: Steven Rose
NRC/RGN-II/DRP/RPB5
To:
NRC/RGN-II/DRP/RPB5
References
Download: ML16124A763 (18)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO: File FROM: Steven D. Rose, Chief /RA/

Reactor Projects Branch 5 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout.

The following NRC staff attended the public meeting:

Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7

Enclosures:

1. List of Attendees
2. Meeting Handout

North Anna Power Station, Units 1 and 2 Annual Assessment Meeting 2015 Reactor Oversight Process Nuclear Regulatory Commission Region 2

NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas (Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution)

Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue

Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing

  • Safety Significance
  • Inspection
  • Management Involvement
  • Regulatory Action

NRC Annual Assessment Summary North Anna Power Station, Units 1 and 2 VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix for all of 2015.

NRC Inspection Activities North Anna Power Station, Units 1 and 2 for 2015 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection Inspection

North Anna Power Station, Units 1 and 2 PIs and Findings Performance Indicators were all Green 9 Green NCV inspection findings No greater than Green inspection findings

NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.

National Summary of Plant Performance Status as of 02/22/2016 Licensee Response 90 Regulatory Response 7 Degraded Cornerstone 0 Multiple/Repetitive Deg. Cornerstone 3 Unacceptable 0 IMC 0350 Oversight 0 Total 100

Actions in Response to the Japan Nuclear Accident

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of

Contact:

OPA.resource@nrc.gov or 301-415-8200

Open to the Public

  • The NRC places a high priority on keeping the public and stakeholders informed of its activities.
  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access the agencys Electronic Reading Room to find NRC publications and documents.

Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

NRC Social Media Tools

https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 3, 2016 MEMORANDUM TO: File FROM: Steven D. Rose, Chief /RA/

Reactor Projects Branch 5 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET NO. 50-338, 50-339 On April 14, 2016, the Nuclear Regulatory Commission (NRC) staff met with members of the public concerning the annual assessment of North Anna Power Station, Units 1 and 2, in Mineral, VA. The purpose of the meeting/open house session was to provide an opportunity to discuss the annual assessment of North Anna Power Station, Units 1 and 2, with the public for the period of January 1, 2015 - December 31, 2015. Enclosed is a list of attendees and the meeting handout.

The following NRC staff attended the public meeting:

Steven D. Rose, Chief, Region II (RII) Reactor Projects Branch 5, Division of Reactor Projects Roger Hannah, RII Senior Public Affairs Officer Gregory Croon, RII Senior Resident Inspector, North Anna Gwynne R. Eatmon, RII Resident Inspector, North Anna Estaline Hayes, RII Office Assistant, North Anna Docket Nos.: 50-338/50-339 License Nos.: NPF-4/NPF-7

Enclosures:

1. List of Attendees
2. Meeting Handout

North Anna Power Station, Units 1 and 2 Annual Assessment Meeting 2015 Reactor Oversight Process Nuclear Regulatory Commission Region 2

NRC Strategic Plan Goals Safety - Ensure adequate protection of public health and safety and the environment Security - Ensure adequate protection in the secure use and management of radioactive materials

Reactor Oversight Process Strategic Performance Areas Safety Cornerstones Baseline Inspection Performance Indicator Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response

Regulatory Framework NRCs Safety Mission Strategic Performance Areas Cornerstones Cross-Cutting Areas (Human Performance--Safety Conscious Work Environment--Problem Identification & Resolution)

Significance Threshold Performance Indicators Green Baseline Inspection White Requires additional NRC oversight Yellow Requires more NRC oversight Red Requires most NRC oversight Inspection Findings Green Very low safety issue White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue

Action Matrix Columns Licensee Regulatory Degraded Multiple/Repetitive Unacceptable Response Response Degraded Performance Increasing

  • Safety Significance
  • Inspection
  • Management Involvement
  • Regulatory Action

NRC Annual Assessment Summary North Anna Power Station, Units 1 and 2 VEPCO operated the plant safely and in a manner that preserved the public health and safety and protected the environment.

North Anna Power Station, Units 1 and 2 were in the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix for all of 2015.

NRC Inspection Activities North Anna Power Station, Units 1 and 2 for 2015 Two Resident Inspectors on Site Implemented baseline inspection program Inspected in-plant evolutions and activities Compiled and submitted quarterly inspection reports Three Major Team Inspections Problem Identification and Resolution Inspection Component Design Bases Inspection Triennial Fire Protection Inspection

North Anna Power Station, Units 1 and 2 PIs and Findings Performance Indicators were all Green 9 Green NCV inspection findings No greater than Green inspection findings

NRC Plans for 2016 NRC plans baseline inspections at North Anna Power Station, Units 1 and 2 for the remainder of 2016.

National Summary of Plant Performance Status as of 02/22/2016 Licensee Response 90 Regulatory Response 7 Degraded Cornerstone 0 Multiple/Repetitive Deg. Cornerstone 3 Unacceptable 0 IMC 0350 Oversight 0 Total 100

Actions in Response to the Japan Nuclear Accident

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of

Contact:

OPA.resource@nrc.gov or 301-415-8200

Open to the Public

  • The NRC places a high priority on keeping the public and stakeholders informed of its activities.
  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access the agencys Electronic Reading Room to find NRC publications and documents.

Contacting the NRC

  • Report an emergency

- (301) 816-5100 (call collect)

  • Report a safety concern

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions

- www.nrc.gov

- Select What We Do for Public Affairs

NRC Social Media Tools

https://service.govdelivery.com/service/multi_subscribe.html?code=USNRC