| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 27, 2010 LICENSEE: Northern States Power Company, Minnesota | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 27, 2010 LICENSEE: Northern States Power Company, Minnesota FACILITY: Prairie Island Nuclear Generating Plant |
| | |
| FACILITY: Prairie Island Nuclear Generating Plant | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT | | OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT On May 20, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Twin Bluff Middle School Auditorium in Red Wing, Minnesota. The meeting was between NRC Region III management and Northern States Power Company Minnesota representatives to discuss the NRCs assessment of the safety performance of Prairie Island Nuclear Generating Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML1010040602 and ML101260419, respectively. Before the meeting the NRC performed an open house and NRC representatives were available to answer questions. |
| | | The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610286). |
| On May 20, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Twin Bluff Middle School Auditorium in Red Wing, Minnesota. The meeting was between NRC Region III management and Northern States Power Company Minnesota representatives | | The licensee then provided a response to the NRCs assessment. In addition, the licensee discussed the actions that they have undertaken to address the human performance substantive cross-cutting issue and the NRC officials asked a number of questions about the discussed actions. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure. |
| | | /RA/ |
| to discuss the NRC's assessment of the safe ty performance of Prairie Island Nuclear Generating Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML1010040602 and ML101260419, respectively. Before the meeting the NRC performed an open house and NRC representatives were available to answer questions. | | John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos: 50-282; 50-306; 72-010 License Nos: DPR-42; DPR-60; SNM-2506 |
| | |
| The NRC began the meeting with an overview of the NRC's Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610286). | |
| | |
| The licensee then provided a response to the NRC's assessment. In addition, the licensee discussed the actions that they have undertaken to address the human performance substantive cross-cutting issue and the NRC officials asked a number of questions about the discussed actions. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure. | |
| | |
| /RA/
| |
| John B. Giessner, Chief Branch 4 Division of Reactor Projects | |
| | |
| Docket Nos: 50-282; 50-306; 72-010 License Nos: DPR-42; DPR-60; SNM-2506 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As Stated | | As Stated cc w/encl: Distribution via ListServ |
| | |
| cc w/encl: Distribution via ListServ PUBLIC MEETING PRINCIPAL ATTENDEES May 20, 2010 | |
| | |
| Nuclear Regulatory Commission
| |
| | |
| S. West, Director, Division of Reactor Projects, RIII J. Giessner, Branch Chief, Division of Reactor Projects, RIII K. Stoedter, Senior Resident Inspector, Prairie Island P. Zurawski, Resident Inspector, Prairie Island M. Phalen, Health Physicist, Division of Reactor Safety, RIII A. Barker, Government Liaison Officer, RIII H, Logaras, Government Liaison Officer, RIII D. Betancourt-Roldan, Reactor Engineer, Division of Reactor Projects, RIII T. Wengert, Project Manager, Office of Nuclear Reactor Regulation S. Brusehaver, Resident Office Assistant, Prairie Island
| |
| | |
| Northern States Power Company, Minnesota
| |
| | |
| M. Schimmel, Site Vice President B. Sawatzke, Site Operations Director K. Ryan, Plant Manager D. Kettering, Engineering Director S. Northard, Recovery Manager
| |
| | |
| Other Attendees
| |
| | |
| E. Ludy, Republican Eagle D. Buttler, Public J. Howe, Mayor of Red Wing S. Howlett, City of Red Wing
| |
| | |
| J. Stine, Minnesota Department of Health P. Mahowald, Prairie Island Indian Community M. T. Murphy, MN AFL-CIO H. Westra, Prairie Island Indian Community M. Schultz, City of Red Wing
| |
|
| |
|
| UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 27, 2010 LICENSEE: Northern States Power Company, Minnesota
| | PUBLIC MEETING PRINCIPAL ATTENDEES May 20, 2010 Nuclear Regulatory Commission S. West, Director, Division of Reactor Projects, RIII J. Giessner, Branch Chief, Division of Reactor Projects, RIII K. Stoedter, Senior Resident Inspector, Prairie Island P. Zurawski, Resident Inspector, Prairie Island M. Phalen, Health Physicist, Division of Reactor Safety, RIII A. Barker, Government Liaison Officer, RIII H, Logaras, Government Liaison Officer, RIII D. Betancourt-Roldan, Reactor Engineer, Division of Reactor Projects, RIII T. Wengert, Project Manager, Office of Nuclear Reactor Regulation S. Brusehaver, Resident Office Assistant, Prairie Island Northern States Power Company, Minnesota M. Schimmel, Site Vice President B. Sawatzke, Site Operations Director K. Ryan, Plant Manager D. Kettering, Engineering Director S. Northard, Recovery Manager Other Attendees E. Ludy, Republican Eagle D. Buttler, Public J. Howe, Mayor of Red Wing S. Howlett, City of Red Wing J. Stine, Minnesota Department of Health P. Mahowald, Prairie Island Indian Community M. T. Murphy, MN AFL-CIO H. Westra, Prairie Island Indian Community M. Schultz, City of Red Wing |
|
| |
|
| FACILITY: Prairie Island Nuclear Generating Plant | | UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 27, 2010 LICENSEE: Northern States Power Company, Minnesota FACILITY: Prairie Island Nuclear Generating Plant |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT | | OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT On May 20, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Twin Bluff Middle School Auditorium in Red Wing, Minnesota. The meeting was between NRC Region III management and Northern States Power Company Minnesota representatives to discuss the NRCs assessment of the safety performance of Prairie Island Nuclear Generating Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML1010040602 and ML101260419, respectively. Before the meeting the NRC performed an open house and NRC representatives were available to answer questions. |
| | | The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610286). |
| On May 20, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Twin Bluff Middle School Auditorium in Red Wing, Minnesota. The meeting was between NRC Region III management and Northern States Power Company Minnesota representatives | | The licensee then provided a response to the NRCs assessment. In addition, the licensee discussed the actions that they have undertaken to address the human performance substantive cross-cutting issue and the NRC officials asked a number of questions about the discussed actions. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure. |
| | | /RA/ |
| to discuss the NRC's assessment of the safe ty performance of Prairie Island Nuclear Generating Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML1010040602 and ML101260419, respectively. Before the meeting the NRC performed an open house and NRC representatives were available to answer questions. | | John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos: 50-282; 50-306; 72-010 License Nos: DPR-42; DPR-60; SNM-2506 |
| | |
| The NRC began the meeting with an overview of the NRC's Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRC's assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610286). | |
| | |
| The licensee then provided a response to the NRC's assessment. In addition, the licensee discussed the actions that they have undertaken to address the human performance substantive cross-cutting issue and the NRC officials asked a number of questions about the discussed actions. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure. | |
| /RA/ John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos: 50-282; 50-306; 72-010 License Nos: DPR-42; DPR-60; SNM-2506
| |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As Stated cc w/encl: Distribution via ListServ | | As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC letters\EOC Meeting Summaries\Prairie Island EOC 09 Public meeting summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt- JGiessner Roldan:dtp DATE 05/27/10 05/27/10 OFFICIAL RECORD COPY |
|
| |
|
| DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC letters\EOC Meeting Summaries\Prairie Island EOC 09 Public meeting summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt-Roldan:dtp JGiessner DATE 05/27/10 05/27/10 OFFICIAL RECORD COPY Letter to Northern States Power Company, Minnesota from J. Giessner dated May 27, 2010.
| | Letter to Northern States Power Company, Minnesota from J. Giessner dated May 27, 2010. |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT | | OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION: |
| | | Susan Bagley RidsNrrPMPrairieIsland RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}} |
| DISTRIBUTION: | |
| Susan Bagley RidsNrrPMPrairieIsland RidsNrrDorlLpl3-1 Resource | |
| | |
| RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker | |
| | |
| Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource}} | |
|
---|
Category:Letter
MONTHYEARML24298A0552024-10-30030 October 2024 Response to Alternative RR-10, Auxiliary Feedwater Valve Testing IR 05000282/20244032024-10-25025 October 2024 – Security Baseline Inspection Report 05000282/2024403 and 05000306/2024403 05000282/LER-2024-001-01, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-10-22022 October 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies L-PI-24-044, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-10-21021 October 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML24277A1012024-10-0303 October 2024 Closure of Interim Report of a Potential Deviation or Failure to Comply Associated with Bentley Systems Incorporated Autopipe Software ML24221A3622024-09-27027 September 2024 Issuance of Amendment Nos. 245 and 233 Revise Technical Specification 3.8.1, AC Sources-Operating, Surveillance Requirement 3.8.1.2, Note 3 ML24241A1682024-09-23023 September 2024 Transmittal Letter Amendment No. 13 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation 05000282/LER-2024-001, Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies2024-09-16016 September 2024 Auxiliary Building Special Ventilation System Inoperable During Movement of Irradiated Fuel Assemblies IR 05000282/20243012024-09-13013 September 2024 NRC Initial License Examination Report 05000282/2024301 and 05000306/2024301 IR 05000282/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2024005 and 05000306/2024005) L-PI-24-040, Post-Submittal Package Letter2024-08-23023 August 2024 Post-Submittal Package Letter IR 05000282/20245012024-08-0505 August 2024 Emergency Preparedness Inspection Report 05000282/2024501 and 05000306/2024501 ML24213A1592024-07-31031 July 2024 Operator Licensing Examination Approval - Prairie Island Nuclear Generating Plant IR 05000282/20240022024-07-30030 July 2024 Integrated Inspection Report 05000282/2024002 and 05000306/2024002 ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 IR 05000282/20240102024-06-28028 June 2024 Comprehensive Engineering Team Inspection Report 05000282/2024010 and 05000306/2024010 L-PI-24-036, – Preparation and Scheduling of Operator Licensing Examinations2024-06-28028 June 2024 – Preparation and Scheduling of Operator Licensing Examinations ML24158A5912024-06-0606 June 2024 CFR 50.46 LOCA Annual Report L-PI-24-031, Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-06-0505 June 2024 Independent Spent Fuel Storage Installation, Supplement to License Amendment Request to Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) L-PI-24-014, License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption2024-06-0303 June 2024 License Amendment Request to Revise the Technical Specification Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumption 05000306/LER-2024-001-01, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-05-31031 May 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24155A1922024-05-31031 May 2024 Refueling Outage Unit 2 R33 Owners Activity Report for Class 1, 2, 3 and Mc Inservice Inspections ML24262A1992024-05-29029 May 2024 L-PI-24-018 PINGP 75 Day Letter ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection L-PI-24-030, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.12024-05-22022 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.8.1 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24128A2572024-05-16016 May 2024 ISFSI A13 Acceptance Letter IR 05000282/20240012024-05-15015 May 2024 Integrated Inspection Report 05000282/2024001 and 05000306/2024001 ML24130A2362024-05-0909 May 2024 Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Monitoring Program Report ML24130A2392024-05-0909 May 2024 2023 Annual Radioactive Effluent Report ML24071A1162024-05-0101 May 2024 Issuance of Amendment Nos. 244 and 232 Revise TS 3.7.8, Cooling Water (Cl) System ML24128A0882024-04-30030 April 2024 Submittal of Updated Safety Analysis Report (Usar), Revision 38 05000306/LER-2024-001, Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump2024-04-29029 April 2024 Reactor Trip and Auto-Start Actuation of Auxiliary Feedwater Due to Loss of Suction to the 22 Main Feedwater Pump ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000282/20244012024-04-25025 April 2024 – Security Baseline Inspection Report 05000282/2024401 and 05000306/2024401 ML24100A8042024-04-24024 April 2024 – Alternative Request RR-09 for Safety Injection and Volume Control System Category C Check Valve Inservice Testing ML24114A0882024-04-23023 April 2024 Annual Report of Individual Monitoring for the Prairie Island Nuclear Generating Plant (PINGP) ML24113A1182024-04-12012 April 2024 NRC Letter Re NRC Office of Investigations Report No. 3-2023-004 ML24100A1212024-04-0909 April 2024 Submittal of Revised Pressure and Temperature Limits Report ML24093A2832024-04-0202 April 2024 Nuclear Material Transaction Report L-PI-24-012, Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2)2024-04-0202 April 2024 Independent Spent Fuel Storage Installation - License Amendment Request: Revise Independent Spent Fuel Storage Installation (ISFSI) License Conditions 23(a), 24(A)(2), and 24(B)(2) ML24089A2402024-03-29029 March 2024 Guarantee of Payment of Deferred Premiums ML24060A1232024-03-27027 March 2024 To Request 1-RR-5-10 and 2-RR-5-10 Regarding Reactor Pressure Vessel Welds and Nozzle Welds 05000282/LER-2023-001-01, Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables2024-03-21021 March 2024 Reactor Trip, Auxiliary Feedwater and Emergency Service Water System Actuation Due to Electrical Transient in DC Control Power Cables ML24262A1512024-03-15015 March 2024 L-PI-24-011 150 Day Letter 2024 PINGP ILT NRC Exam ML24010A0582024-03-0505 March 2024 Amendment No. 12 to Materials License No. Special Nuclear Material-2506 for the Prairie Island Independent Spent Fuel Storage Installation L-PI-24-004, Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 20232024-02-29029 February 2024 Independent Spent Fuel Storage Installation - Annual Effluent Report, January Through December 2023 IR 05000282/20230062024-02-28028 February 2024 Annual Assessment Letter for Prairie Island Nuclear Generating Plant, Units 1 and 2 (Report 05000282/2023006 and 05000306/2023006) 2024-09-27
[Table view] Category:Meeting Summary
MONTHYEARML24149A1632024-05-29029 May 2024 Summary of the May 8, 2024 Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating Plant, Units 1 and 2 ML24088A1012024-03-29029 March 2024 Summary of March 6, 2024, Public Meeting with NSPM Regarding Planned LAR to Modify Technical Specifications Definitions and Incorporate Plant-Specific Methods for Response Time Testing for Prairie Island Nuclear Plant, Units 1 & 2 ML24043A0952024-02-21021 February 2024 Summary of January 31, 2024, Public Meeting with Xcel Energy to Discuss Amendment Application for Prairie Island Independent Spent Fuel Storage Installation ML23184A0862023-07-11011 July 2023 6/23/2023 Summary of Pre Application Public Meeting with Xcel Energy on Prairie Island ISFSI Amendment Application ML23179A2102023-06-28028 June 2023 Summary of June 5, 2023, Public Meeting with Northern States Power Company Regarding Neutron Fluence Values for Reactor Pressure Vessel Welds ML23157A0232023-06-0606 June 2023 Summary of the May 24, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Prairie Island Nuclear Generating Plant, Units 1 and 2 ML23123A3942023-05-15015 May 2023 Summary of Public Meeting with Northern States Power Company Regarding Planned License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water System ML22130A7172022-05-10010 May 2022 Summary of the May 3, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21294A0442021-11-0808 November 2021 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a License Amendment to Extended the Allowed Outage Time for the Vertical Motor Driven Cooling Water System Pump ML21229A1692021-08-23023 August 2021 Summary of August 11, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment Allow Bypass Testing of the Power Range Nuclear Instrumentation System Channels ML21167A1842021-06-16016 June 2021 Summary of the June 9, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21137A1042021-05-20020 May 2021 Summary of May 6, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Transition to a 24 Month Operating Cycle ML21040A4612021-02-11011 February 2021 Summary of February 3, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Combine the Emergency Plans and Create a Common Emergency Operations Facility ML20296A2382020-11-0303 November 2020 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the License Amendment to Adopt TSTF-505 Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20274A2442020-10-16016 October 2020 Summary of 9/23/2020 Meeting with Northern States Power Co., Doing Business as Xcel Energy, on Potential License Exemption Request Related to Biennal Emergency Preparedness Exercise for Prairie Island Nuclear Generating Plant, Units 1 & 2 ML20216A6452020-08-0303 August 2020 Summary of the July 16, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Prairie Island Generating Plant ML20114E2302020-04-23023 April 2020 Meeting Summary from Call with S. Beimers Mnshpo and NRC January 2020 Prairie Island ISFSI EA ML20111A1322020-04-21021 April 2020 April 9, 2020, Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Adopt TSTF-569 at Prairie Island Nuclear Generating Plant, Unit 1 and 2 ML20057D3912020-03-0909 March 2020 Summary of February 18, 2020, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Ament Request Related to Low Temperature Overpressurization Protection ML19347D1592020-01-0707 January 2020 Summary of December 12, 2019, Meeting with Northern States Power Co., Doing Business as Xcel Energy, and Tennessee Valley Authority Planned License Amendment Requests for Prairie Island, Units 2 and 2, and Watts Bar, Units 1 and 2 ML19289A5322019-10-28028 October 2019 Summary of September 26, 2019, Teleconference with Northern States Power Company on Potential License Amendment Request to Adopt TSTF-505, Revision 2 ML19210D5432019-08-20020 August 2019 Summary of Teleconference with Northern States Power Company on Potential License Amendment Request to Adopt Probabilistic Risk Assessment Model ML19136A0272019-05-15015 May 2019 Memorandum to C. Regan Summary of March 28, 2019, Public Meeting with Xcel Energy to Discuss Seismic Consideration for a Proposed License Amendment Increasing the Amount of Special Nuclear Material Authorized for Storage at Prairie Island I ML19058A4672019-03-11011 March 2019 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Amendment Request to Modify Renewed Facility Operating License Paragraph 2.C(4)(c) ML18065A5582018-03-12012 March 2018 Summary of February 20, 2018, Teleconference with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request to Adopt TSTF-425 ML17341A1292017-12-11011 December 2017 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Changes to the Security Plans at the Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML17261B0362017-09-25025 September 2017 Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Digital Feedwater Modifications at Prairie Island Nuclear Generating Plant, Units 1 and 2 ML17235B1802017-08-23023 August 2017 Summary of Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Prairie Island ML17209A1192017-07-17017 July 2017 Summary of July 17, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Heavy Lifting Devices L-PI-17-014, Summary of Public Meeting and Plan for NRC Request for Additional Information Regarding License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121...2017-04-19019 April 2017 Summary of Public Meeting and Plan for NRC Request for Additional Information Regarding License Amendment Request for Spent Fuel Pool Criticality Technical Specification Changes (CAC Nos. MF7121... ML17093A6012017-04-0606 April 2017 March 9, 2017, Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Spent Fuel Pool Criticality License Amendment Request ML17034A1202017-02-0909 February 2017 Summary of January 24, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Revision to the Emergency Action Level ML16111B1912016-04-28028 April 2016 Summary of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy, on National Fire Protection Association (NFPA) 805 License Amendment Request ML15271A2072015-10-0202 October 2015 July 9, 2015 Summary of Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S, Nuclear Regulatory Commission and Northern States Power Company- Minnesota to Discuss Flood Analysis Associated with Monticello Nuclear ML15141A5092015-05-21021 May 2015 Meeting Summary with Public to Discuss the Results of the 2014 Problem Identification and Resolution Inspection for Prairie Island Nuclear Generating Plant ML15107A0592015-05-15015 May 2015 Summary of the April 14, 2015, Public Meeting with Xcel Energy and Westinghouse to Discuss a Future License Amendment Request Regarding the Use of Ifba Rods in Nuclear Fuel at the Prairie Island Nuclear Generating Plant ML15131A4482015-05-0707 May 2015 Reactor Oversight Process Task Force FAQ Log - April 16, 2015 ML14220A2832014-09-0808 September 2014 Summary of August 5, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, NRC, and Northern States Power Company - Minnesota to Discuss Flooding Analysis Associated with Monticello and Prairie Island Nuclear Gen ML14223A8012014-08-11011 August 2014 Public Meeting Summary to Discuss the 2013 Performance of Prairie Island Nuclear Generating Plant Units 1 and 2 ML14227A8852014-07-0202 July 2014 E-mail P Longmire, NRC, Re e-mail Fr Samuel Chesnutt, Xcel Energy, Re Meeting Summary for the June 16, 2014 Prairie Island ISFSI License Renewal Application RAI Discussion ML14153A0252014-06-20020 June 2014 Meeting Summary - Public Meeting on May 16, 2014, to Discuss Xcel Energy'S Flood Hazard Reevaluation Extension Request for the Monticello and Prairie Island Nuclear Generating Plants ML14168A0182014-05-16016 May 2014 Xcel Energy Responses to NRC Questions Regarding Flood Hazard Reevaluation Report Extension Requests ML14056A4942014-03-10010 March 2014 Summary of the February 19, 2014, Pre-Application Meeting to Discuss the Diesel Generator Voltage and Frequency Limits License Request ML13210A3022013-07-29029 July 2013 Summary of Public Meeting with Northern States Power Company to Discuss the 2012 Prairie Island Nuclear Generating Plant End-of-Cycle Performance Assessment ML13171A2472013-06-20020 June 2013 7/11/2013 - Notice of Public Meeting to Discuss 2012 End-Of-Cycle Performance Assessment for Prairie Island Nuclear Generating Plant, Units 1 and 2 ML13004A3722013-01-11011 January 2013 December 6, 2012, Summary of Meeting to Discuss the Licensee'S Proposed FLEX Strategy in Response to NRC Order EA-12-049 ML12326A9702012-11-21021 November 2012 Summary of October 24, 2012, Meeting with the Northern States Power Company, D/B/A Excel Energy Regarding Security Requirements and Changes Pertaining to Prairie Island TAC L24689 W/ Encl 1 (Attendees) and Encl 2 (Agenda) ML12292A4202012-11-0707 November 2012 September 27, 2012 - Summary of Pre-Application Meeting to Discuss the Diesel Generator Voltage and Frequency Limits License Amendment Request ML12214A2332012-07-31031 July 2012 July 17, 2012 Summary of Public Meeting to Discuss the Prairie Island Nuclear Generating Plant, Units 1 and 2, End-of-Cycle Plant Performance Assessment ML12121A5842012-05-17017 May 2012 Meeting Summary with Northern States Power Co, to Discuss the National Fire Protection Association Standard 805 (NFPA 805) License Amendment Request 2024-05-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 27, 2010 LICENSEE: Northern States Power Company, Minnesota FACILITY: Prairie Island Nuclear Generating Plant
SUBJECT:
SUMMARY
OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT On May 20, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Twin Bluff Middle School Auditorium in Red Wing, Minnesota. The meeting was between NRC Region III management and Northern States Power Company Minnesota representatives to discuss the NRCs assessment of the safety performance of Prairie Island Nuclear Generating Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML1010040602 and ML101260419, respectively. Before the meeting the NRC performed an open house and NRC representatives were available to answer questions.
The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610286).
The licensee then provided a response to the NRCs assessment. In addition, the licensee discussed the actions that they have undertaken to address the human performance substantive cross-cutting issue and the NRC officials asked a number of questions about the discussed actions. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
/RA/
John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos: 50-282; 50-306;72-010 License Nos: DPR-42; DPR-60; SNM-2506
Enclosure:
As Stated cc w/encl: Distribution via ListServ
PUBLIC MEETING PRINCIPAL ATTENDEES May 20, 2010 Nuclear Regulatory Commission S. West, Director, Division of Reactor Projects, RIII J. Giessner, Branch Chief, Division of Reactor Projects, RIII K. Stoedter, Senior Resident Inspector, Prairie Island P. Zurawski, Resident Inspector, Prairie Island M. Phalen, Health Physicist, Division of Reactor Safety, RIII A. Barker, Government Liaison Officer, RIII H, Logaras, Government Liaison Officer, RIII D. Betancourt-Roldan, Reactor Engineer, Division of Reactor Projects, RIII T. Wengert, Project Manager, Office of Nuclear Reactor Regulation S. Brusehaver, Resident Office Assistant, Prairie Island Northern States Power Company, Minnesota M. Schimmel, Site Vice President B. Sawatzke, Site Operations Director K. Ryan, Plant Manager D. Kettering, Engineering Director S. Northard, Recovery Manager Other Attendees E. Ludy, Republican Eagle D. Buttler, Public J. Howe, Mayor of Red Wing S. Howlett, City of Red Wing J. Stine, Minnesota Department of Health P. Mahowald, Prairie Island Indian Community M. T. Murphy, MN AFL-CIO H. Westra, Prairie Island Indian Community M. Schultz, City of Red Wing
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 27, 2010 LICENSEE: Northern States Power Company, Minnesota FACILITY: Prairie Island Nuclear Generating Plant
SUBJECT:
SUMMARY
OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT On May 20, 2010, the Nuclear Regulatory Commission (NRC) held a public meeting at the Twin Bluff Middle School Auditorium in Red Wing, Minnesota. The meeting was between NRC Region III management and Northern States Power Company Minnesota representatives to discuss the NRCs assessment of the safety performance of Prairie Island Nuclear Generating Plant for the period from January 1, 2009, through December 31, 2009. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML1010040602 and ML101260419, respectively. Before the meeting the NRC performed an open house and NRC representatives were available to answer questions.
The NRC began the meeting with an overview of the NRCs Mission, the Reactor Oversight Process (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Palisades performance in 2009, which was documented in the March 3, 2010, End-Of-Cycle assessment letter (ML100610286).
The licensee then provided a response to the NRCs assessment. In addition, the licensee discussed the actions that they have undertaken to address the human performance substantive cross-cutting issue and the NRC officials asked a number of questions about the discussed actions. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials. A list of principal meeting attendees can be found in the attached enclosure.
/RA/
John B. Giessner, Chief Branch 4 Division of Reactor Projects Docket Nos: 50-282; 50-306;72-010 License Nos: DPR-42; DPR-60; SNM-2506
Enclosure:
As Stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\Branch TSS\ALL EOC\EOC CY 2009\EOC letters\EOC Meeting Summaries\Prairie Island EOC 09 Public meeting summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DBetancourt- JGiessner Roldan:dtp DATE 05/27/10 05/27/10 OFFICIAL RECORD COPY
Letter to Northern States Power Company, Minnesota from J. Giessner dated May 27, 2010.
SUBJECT:
SUMMARY
OF THE MAY 20, 2010, PUBLIC MEETING TO DISCUSS THE 2010 PRAIRIE ISLAND END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:
Susan Bagley RidsNrrPMPrairieIsland RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource