{{#Wiki_filter:rch 5, 2012
{{#Wiki_filter:UNITED STATES rch 5, 2012


==SUBJECT:==
==SUBJECT:==
Line 24: Line 24:


==Dear Mr. Colomb:==
==Dear Mr. Colomb:==
On February 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not  
On February 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.


include security information. A separate letter will include the NRC's assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, FitzPatrick operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The NRC determined that overall, FitzPatrick opera ted in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, Temporary Instruction (TI)-182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, and TI-177, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be
On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulfulness. Therefore, the NRC plans to conduct IP 92702, Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order.


revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, "Post-Approval Site Inspection for License Renewal," Temporary Instruction (TI)-182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks," and TI-177, "Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulfulness. Therefore, the NRC plans to conduct IP 92702, "Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
 
enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.
Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.


Sincerely,
Sincerely,
/RA/ Mel Gray, Chief Projects Branch 2 Division of Reactor Projects  
/RA/
 
Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59 Enclosure: James A. FitzPatrick Inspection/Activity Plan cc w/encl: Distribution via ListServ
Docket No. 50-333 License No. DPR-59  
 
Enclosure: James A. FitzPatrick Inspection/Activity Plan  
 
cc w/encl: Distribution via ListServ  


ML12061A061 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME MJennerich/SMc for BBickett/SMc for MGray DATE 02/27/12 02/27/12 03/01/12  
ML12061A061 Non-Sensitive   Publicly Available SUNSI Review Sensitive  Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME MJennerich/SMc for BBickett/SMc for MGray DATE 02/27/12 02/27/12 03/01/12


Page 1 of 3 03/01/2012 09:38:49 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 01/01/2012-06/30/2013 2/27EXAM-FITZPATRICK INITIAL EXAM 3 1 FY12-FITZ INITIAL OPERATOR LICENSING EXAM U01843 01/23/2012 01/27/2012 1 FY12-FITZ INITIAL OPERATOR LICENSING EXAM U01843 02/27/2012 03/02/2012 71152B-PI&R 4 1 IP Problem Identification and Resolution 71152B 02/27/2012 03/02/2012 1 IP Problem Identification and Resolution 71152B 03/12/2012 03/16/2012 7111111B-FITZ ON-SITE REQUAL INSP W/ P/F RESULTS 2 1 IP Licensed Operator Requalification Program 7111111B 04/23/2012 04/27/2012 TI 182-DEGRADATION OF UNDERGROUND PIPING 1 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 03/12/2012 03/16/2012 9/10 EXM-FITZPATRICK 2ND INITIAL EXAM 3 1 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)
Page 1 of 3     FitzPatrick 03/01/2012 09:38:49   Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site 2/27EXAM - FITZPATRICK INITIAL EXAM       3 1 01/23/2012 01/27/2012 U01843 FY12-FITZ INITIAL OPERATOR LICENSING EXAM 1 02/27/2012 03/02/2012 U01843 FY12-FITZ INITIAL OPERATOR LICENSING EXAM 71152B - PI&R       4 1 02/27/2012 03/02/2012 IP 71152B Problem Identification and Resolution 1 03/12/2012 03/16/2012 IP 71152B Problem Identification and Resolution 7111111B - FITZ ON-SITE REQUAL INSP W/ P/F RESULTS     2 1 04/23/2012 04/27/2012 IP 7111111B Licensed Operator Requalification Program TI 182 - DEGRADATION OF UNDERGROUND PIPING     1 1 03/12/2012 03/16/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 9/10 EXM - FITZPATRICK 2ND INITIAL EXAM       3 1 08/06/2012 08/10/2012 U01879 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)
U01879 08/06/2012 08/10/2012 1 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)
1 09/10/2012 09/14/2012 U01879 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)
U01879 09/10/2012 09/14/2012 ISFSI-ISFSI LOADING 1 1 IP Operation Of An ISFSI 60855 04/01/2012 09/30/2012 MODS-PERMANENT PLANT MODIFICATIONS 3 1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/16/2012 04/20/2012 1 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 04/30/2012 05/04/2012 EP PROGR-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing 7111402 05/07/2012 05/11/2012 1 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/07/2012 05/11/2012 1 IP Emergency Action Level and Emergency Plan Changes 7111404 05/07/2012 05/11/2012 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/07/2012 05/11/2012 71124-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 04/30/2012 05/04/2012 7111107T-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance 7111107T 05/14/2012 05/18/2012 TI-177-MANAGING GAS ACCUMULATION IN ECCS 3 1 IP Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 2515/177 05/21/2012 05/25/2012 71124-HP-ACCESS CONTROL 1 1 IP Operation Of An ISFSI 60855 06/04/2012 06/08/2012 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 06/04/2012 06/08/2012 1 IP Occupational ALARA Planning and Controls 71124.02 06/04/2012 06/08/2012 This report does not include INPO and OUTAGE activities.
ISFSI - ISFSI LOADING       1 1 04/01/2012 09/30/2012 IP 60855  Operation Of An ISFSI MODS - PERMANENT PLANT MODIFICATIONS     3 1 04/16/2012 04/20/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 04/30/2012 05/04/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EP PROGR - EP PROGRAM INSPECTION       1 1 05/07/2012 05/11/2012 IP 7111402 Alert and Notification System Testing 1 05/07/2012 05/11/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/07/2012 05/11/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/07/2012 05/11/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - RADWASTE        1 1 04/30/2012 05/04/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 7111107T - TRIENNIAL HEAT SINK       1 1 05/14/2012 05/18/2012 IP 7111107T Heat Sink Performance TI-177 - MANAGING GAS ACCUMULATION IN ECCS     3 1 05/21/2012 05/25/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 71124 - HP-ACCESS CONTROL       1 1 06/04/2012 06/08/2012 IP 60855  Operation Of An ISFSI 1 06/04/2012 06/08/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 06/04/2012 06/08/2012 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 2 of 3 03/01/2012 09:38:49 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 01/01/2012-06/30/2013 71124-HP-ACCESS CONTROL 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 06/04/2012 06/08/2012 1 IP Occupational Dose Assessment 71124.04 06/04/2012 06/08/2012 71124.05-RAD INSTRUMENTS INSPECTION 1 1 IP Radiation Monitoring Instrumentation 71124.05 07/09/2012 07/13/2012 71124.06-RETS INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 08/06/2012 08/10/2012 TI-185-VOLUNTARY GROUND WATER INITIATIVE FOLLOW 1 1 IP Follow-up on the Industry's Ground Water Protection Initiative 2515/185 08/06/2012 08/10/2012 71003-LR COMMITMENTS INSP - PHASE I 2 1 IP Post-Approval Site Inspection for License Renewal 71003 09/24/2012 09/28/2012 7111108G-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - BWR 7111108G 09/24/2012 09/28/2012 71124-HP-EXPOSURE CONTROLS & DOSE ASSESSMENT 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 09/24/2012 09/28/2012 1 IP Occupational ALARA Planning and Controls 71124.02 09/24/2012 09/28/2012 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 09/24/2012 09/28/2012 1 IP Occupational Dose Assessment 71124.04 09/24/2012 09/28/2012 1 IP Occupational Exposure Control Effectiveness 71151-OR01 09/24/2012 09/28/2012 1 IP RETS/ODCM Radiological Effluent 71151-PR01 09/24/2012 09/28/2012 92702-CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC 1 1 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 92702-CONF. ORDER FOLLOWUP FITZ ADR ACTION A-D 1 1 IP Followup On Corrective Actions For Violations And Deviations 92702 10/01/2012 12/31/2012 92702-CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F 1 1 IP Followup On Corrective Actions For Violations And Deviations 92702 01/01/2013 03/31/2013 ISFSI-ISFSI LOADING 1 1 IP Operation Of An ISFSI 60855 03/01/2013 06/30/2013 71124-RADIATION SAFETY INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/25/2013 03/29/2013 1 IP Occupational ALARA Planning and Controls 71124.02 03/25/2013 03/29/2013 1 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/25/2013 03/29/2013 1 IP Occupational Dose Assessment 71124.04 03/25/2013 03/29/2013 This report does not include INPO and OUTAGE activities.
Page 2 of 3     FitzPatrick 03/01/2012 09:38:49   Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site 71124 - HP-ACCESS CONTROL     1 1 06/04/2012 06/08/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 06/04/2012 06/08/2012 IP 71124.04 Occupational Dose Assessment 71124.05 - RAD INSTRUMENTS INSPECTION   1 1 07/09/2012 07/13/2012 IP 71124.05 Radiation Monitoring Instrumentation 71124.06 - RETS INSPECTION     1 1 08/06/2012 08/10/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment TI-185 - VOLUNTARY GROUND WATER INITIATIVE FOLLOW   1 1 08/06/2012 08/10/2012 IP 2515/185 Follow-up on the Industry's Ground Water Protection Initiative 71003 - LR COMMITMENTS INSP - PHASE I   2 1 09/24/2012 09/28/2012 IP 71003  Post-Approval Site Inspection for License Renewal 7111108G - INSERVICE INSPECTION     1 1 09/24/2012 09/28/2012 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP-EXPOSURE CONTROLS & DOSE ASSESSMENT   1 1 09/24/2012 09/28/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/24/2012 09/28/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 09/24/2012 09/28/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/24/2012 09/28/2012 IP 71124.04 Occupational Dose Assessment 1 09/24/2012 09/28/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 09/24/2012 09/28/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent 92702 - CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC   1 1 10/01/2012 12/31/2012 IP 92702  Followup On Corrective Actions For Violations And Deviations 92702 - CONF. ORDER FOLLOWUP FITZ ADR ACTION A-D   1 1 10/01/2012 12/31/2012 IP 92702  Followup On Corrective Actions For Violations And Deviations 92702 - CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F   1 1 01/01/2013 03/31/2013 IP 92702  Followup On Corrective Actions For Violations And Deviations ISFSI - ISFSI LOADING     1 1 03/01/2013 06/30/2013 IP 60855  Operation Of An ISFSI 71124 - RADIATION SAFETY INSPECTION   1 1 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 03/25/2013 03/29/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/25/2013 03/29/2013 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Page 3 of 3 03/01/2012 09:38:49 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site FitzPatrick Inspection / Activity Plan 01/01/2012-06/30/2013 7111121-CDBI 6 1 IP Component Design Bases Inspection 7111121 06/10/2013 06/14/2013 1 IP Component Design Bases Inspection 7111121 06/24/2013 06/28/2013 71124-RADIATION SAFETY INSPECTION 1 1 IP Radiological Environmental Monitoring Program 71124.07 06/03/2013 06/07/2013 1 IP Performance Indicator Verification 71151 06/03/2013 06/07/2013 This report does not include INPO and OUTAGE activities.
Page 3 of 3     FitzPatrick 03/01/2012 09:38:49   Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates      No. of Staff Number Start End Inspection Activity    Title on Site 7111121 - CDBI     6 1 06/10/2013 06/14/2013 IP 7111121 Component Design Bases Inspection 1 06/24/2013 06/28/2013 IP 7111121 Component Design Bases Inspection 71124 - RADIATION SAFETY INSPECTION   1 1 06/03/2013 06/07/2013 IP 71124.07 Radiological Environmental Monitoring Program 1 06/03/2013 06/07/2013 IP 71151  Performance Indicator Verification This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 08:22, 12 November 2019

Annual Assessment Letter (Report 05000333/2011001)
ML12061A061
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/05/2012
From: Mel Gray
Reactor Projects Branch 2
To: Michael Colomb
Entergy Nuclear Northeast
References
IR-11-001
Download: ML12061A061 (6)


Text

UNITED STATES rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (REPORT 05000333/2011001)

Dear Mr. Colomb:

On February 14, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of the James A. FitzPatrick Nuclear Power Plant (FitzPatrick). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, FitzPatrick operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at FitzPatrick during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 71003, Post-Approval Site Inspection for License Renewal, Temporary Instruction (TI)-182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks, and TI-177, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

On January 25, 2012, the NRC issued a Confirmatory Order which included a severity level III traditional enforcement violation associated with willfulfulness. Therefore, the NRC plans to conduct IP 92702, Follow-up on Traditional Enforcement Actions including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders and Alternate Dispute Resolution Confirmatory Orders" to follow-up on actions as documented in the Confirmatory Order.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5209 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Mel Gray, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-333 License No. DPR-59 Enclosure: James A. FitzPatrick Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML12061A061 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME MJennerich/SMc for BBickett/SMc for MGray DATE 02/27/12 02/27/12 03/01/12

Page 1 of 3 FitzPatrick 03/01/2012 09:38:49 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 2/27EXAM - FITZPATRICK INITIAL EXAM 3 1 01/23/2012 01/27/2012 U01843 FY12-FITZ INITIAL OPERATOR LICENSING EXAM 1 02/27/2012 03/02/2012 U01843 FY12-FITZ INITIAL OPERATOR LICENSING EXAM 71152B - PI&R 4 1 02/27/2012 03/02/2012 IP 71152B Problem Identification and Resolution 1 03/12/2012 03/16/2012 IP 71152B Problem Identification and Resolution 7111111B - FITZ ON-SITE REQUAL INSP W/ P/F RESULTS 2 1 04/23/2012 04/27/2012 IP 7111111B Licensed Operator Requalification Program TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 1 03/12/2012 03/16/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 9/10 EXM - FITZPATRICK 2ND INITIAL EXAM 3 1 08/06/2012 08/10/2012 U01879 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)

1 09/10/2012 09/14/2012 U01879 FY12- FITZ INITIAL OPERATOR LICENSING EXAM (2ND)

ISFSI - ISFSI LOADING 1 1 04/01/2012 09/30/2012 IP 60855 Operation Of An ISFSI MODS - PERMANENT PLANT MODIFICATIONS 3 1 04/16/2012 04/20/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 04/30/2012 05/04/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications EP PROGR - EP PROGRAM INSPECTION 1 1 05/07/2012 05/11/2012 IP 7111402 Alert and Notification System Testing 1 05/07/2012 05/11/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 05/07/2012 05/11/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1 05/07/2012 05/11/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - RADWASTE 1 1 04/30/2012 05/04/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 7111107T - TRIENNIAL HEAT SINK 1 1 05/14/2012 05/18/2012 IP 7111107T Heat Sink Performance TI-177 - MANAGING GAS ACCUMULATION IN ECCS 3 1 05/21/2012 05/25/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System 71124 - HP-ACCESS CONTROL 1 1 06/04/2012 06/08/2012 IP 60855 Operation Of An ISFSI 1 06/04/2012 06/08/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 06/04/2012 06/08/2012 IP 71124.02 Occupational ALARA Planning and Controls This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 FitzPatrick 03/01/2012 09:38:49 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - HP-ACCESS CONTROL 1 1 06/04/2012 06/08/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 06/04/2012 06/08/2012 IP 71124.04 Occupational Dose Assessment 71124.05 - RAD INSTRUMENTS INSPECTION 1 1 07/09/2012 07/13/2012 IP 71124.05 Radiation Monitoring Instrumentation 71124.06 - RETS INSPECTION 1 1 08/06/2012 08/10/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment TI-185 - VOLUNTARY GROUND WATER INITIATIVE FOLLOW 1 1 08/06/2012 08/10/2012 IP 2515/185 Follow-up on the Industry's Ground Water Protection Initiative 71003 - LR COMMITMENTS INSP - PHASE I 2 1 09/24/2012 09/28/2012 IP 71003 Post-Approval Site Inspection for License Renewal 7111108G - INSERVICE INSPECTION 1 1 09/24/2012 09/28/2012 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP-EXPOSURE CONTROLS & DOSE ASSESSMENT 1 1 09/24/2012 09/28/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 09/24/2012 09/28/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 09/24/2012 09/28/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 09/24/2012 09/28/2012 IP 71124.04 Occupational Dose Assessment 1 09/24/2012 09/28/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 09/24/2012 09/28/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent 92702 - CONF. ORDER FOLLOWUP RIVERBEND ADR QA/QC 1 1 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 92702 - CONF. ORDER FOLLOWUP FITZ ADR ACTION A-D 1 1 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 92702 - CONF. ORDER FOLLOWUP FITZ ADR ACTION E-F 1 1 01/01/2013 03/31/2013 IP 92702 Followup On Corrective Actions For Violations And Deviations ISFSI - ISFSI LOADING 1 1 03/01/2013 06/30/2013 IP 60855 Operation Of An ISFSI 71124 - RADIATION SAFETY INSPECTION 1 1 03/25/2013 03/29/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/25/2013 03/29/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 03/25/2013 03/29/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/25/2013 03/29/2013 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 FitzPatrick 03/01/2012 09:38:49 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111121 - CDBI 6 1 06/10/2013 06/14/2013 IP 7111121 Component Design Bases Inspection 1 06/24/2013 06/28/2013 IP 7111121 Component Design Bases Inspection 71124 - RADIATION SAFETY INSPECTION 1 1 06/03/2013 06/07/2013 IP 71124.07 Radiological Environmental Monitoring Program 1 06/03/2013 06/07/2013 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.