{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 May 14, 2015  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.
 
ARLINGTON, TX 76011-4511 May 14, 2015 Mr. Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
Mr. Adam C. Heflin, President and  
 
Chief Executive Officer  
 
Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839  


==SUBJECT:==
==SUBJECT:==
WOLF CREEK GENERATING STATION
WOLF CREEK GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000482/2015007) AND REQUEST FOR INFORMATION
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000482/2015007) AND REQUEST FOR INFORMATION  


==Dear Mr. Heflin:==
==Dear Mr. Heflin:==


The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Wolf Creek Generating Station during July 6-10, 2015, and July 20-24, 2015. The inspection will consist of three reactor inspectors from the NRC's Region IV office for two weeks. The inspection will be conduc ted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications."
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Wolf Creek Generating Station during July 6-10, 2015, and July 20-24, 2015. The inspection will consist of three reactor inspectors from the NRCs Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications.
Experience has shown that this inspection is resource intens ive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by June 22, 2015. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  
Please note that the documents are requested to be provided by June 22, 2015. Upon review of these documents, the inspectors will select additional documentation for review upon arrival.
 
It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Larry Stevens of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at Jonathan.Braisted@nrc.gov.
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Larry Stevens of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at Jonathan.Braisted@nrc.gov.
 
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
 
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,  /RA/  Thomas R. Farnholtz, Chief Engineering Branch 1
 
Division of Reactor Safety


Docket: 50-482 License: NPF-42
A. Heflin                                        This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                /RA/
Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 50-482 License: NPF-42


==Enclosure:==
==Enclosure:==
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection 
Request for Information
Electronic Distribution to the Wolf Creek Generating Station
Enclosure Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Wolf Creek Generating Station


Inspection Report:  05000482/2015007
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Request for Information Electronic Distribution to the Wolf Creek Generating Station


Inspection Dates: July 6-10, 2015, and July 20-24, 2015  
Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Wolf Creek Generating Station Inspection Report:              05000482/2015007 Inspection Dates:               July 6-10, 2015, and July 20-24, 2015 Inspection Procedure:           IP 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Lead Inspector:                 Jonathan Braisted, Reactor Inspector Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by June 22, 2015, to the attention of Jonathan Braisted. We request that you categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the onsite inspection. Also, the inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible.
 
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications" Lead Inspector: Jonathan Braisted, Reactor Inspector
 
Information Requested for the In-Office Preparation Week
 
The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by June 22, 2015, to the attention of Jonathan Braisted. We request that you categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the onsite inspection. Also, the inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible.
: 1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
: 1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
: 2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.
: 2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.
Line 71: Line 49:
: 7. Procedure(s) for implementing permanent plant modifications.
: 7. Procedure(s) for implementing permanent plant modifications.
: 8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.
: 8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.
Enclosure
: 9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.
: 9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.
: 10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.  
: 10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications Inspector Contact Information:
Jonathan Braisted              Nnaerika Okonkwo                Grant Larkin Reactor Inspector              Reactor Inspector              Emergency Response Coordinator 817-200-1194                  817-200-1114                    817-200-1449 Jonathan.Braisted@nrc.gov      Nnaerika.Okonkwo@nrc.gov Grant.Larkin@nrc.gov Mailing Address:
U.S. NRC, Region IV Attn: Jonathan Braisted 1600 East Lamar Blvd.
Arlington, TX 76011-4125


Note:  Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.
A. Heflin                                        This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
Note:  For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
Inspector Contact Information:
                                                /RA/
 
Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 50-482 License: NPF-42
Jonathan Braisted  Nnaerika Okonkwo  Grant Larkin  Reactor Inspector  Reactor Inspector  Emergency Response Coordinator 817-200-1194  817-200-1114  817-200-1449 Jonathan.Braisted@nrc.gov Nnaerika.Okonkwo@nrc.gov Grant.Larkin@nrc.gov 
 
Mailing Address:
U.S. NRC, Region IV Attn:  Jonathan Braisted 1600 East Lamar Blvd.
Arlington, TX 76011-4125
 
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its  
 
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1  
 
Division of Reactor Safety  
 
Docket: 50-482 License: NPF-42


==Enclosure:==
==Enclosure:==
Evaluations of Changes, Tests, and Experiments  and Permanent Plant Modifications Inspection 


Request for Information  
Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Request for Information Electronic Distribution to the Wolf Creek Generating Station Distribution See next page ML15135A486 SUNSI Review    ADAMS:              Sensitive            Non-Publicly Available          Keyword By: JDB            Yes  No          Non-Sensitive        Publicly Available              NRC-002 OFFICE              DRS/EB1/RI                                                      C:
NAME                JBraisted                                                        TFarnholtz SIGNATURE            /RA/                                                            /RA/
DATE                5/13/15                                                          5/14/15 OFFICIAL RECORD COPY


Electronic Distribution to the Wolf Creek Generating Station
Letter from Adam C. Heflin from Thomas R. Farnholtz dated May 14, 2015
 
Distribution See next page
 
ML15135A486  SUNSI Review By:  JDB ADAMS:    Yes      No  Sensitive    Non-Sensitive  Non-Publicly Available    Publicly Available Keyword NRC-002 OFFICE DRS/EB1/RI  C: NAME JBraisted  TFarnholtz SIGNATURE /RA/  /RA/ DATE 5/13/15  5/14/15 OFFICIAL RECORD COPY
 
Letter from Adam C. Heflin from Thomas R. Farnholtz dated May 14, 2015  


==SUBJECT:==
==SUBJECT:==
WOLF CREEK GENERATING STATION
WOLF CREEK GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000482/2015007) AND REQUEST FOR INFORMATION Distribution Regional Administrator (Marc.Dapas@nrc.gov)
- NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000482/2015007) AND REQUEST FOR INFORMATION  
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
 
Distribution Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov) DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Chris.Speer@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)
 
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Chris.Speer@nrc.gov)
Resident Inspector (Raja.Stroble@nrc.gov)
Resident Inspector (Raja.Stroble@nrc.gov)
WC Administrative Assistant (Carey.Spoon@nrc.gov)
WC Administrative Assistant (Carey.Spoon@nrc.gov)
Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)
 
Project Manager (Fred.Lyon@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Team Leader, DRS/TSS (Don.Allen@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov)  
Team Leader, DRS/TSS (Don.Allen@nrc.gov)
 
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)}}
RIV/ETA: OEDO (Michael.Waters@nrc.gov)}}

Revision as of 12:14, 31 October 2019

Wc 2015007 17T RFI
ML15135A486
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 05/14/2015
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Heflin A
Wolf Creek
J. Braisted
References
IR 2015007
Download: ML15135A486 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD.

ARLINGTON, TX 76011-4511 May 14, 2015 Mr. Adam C. Heflin, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839

SUBJECT:

WOLF CREEK GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000482/2015007) AND REQUEST FOR INFORMATION

Dear Mr. Heflin:

The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of changes, tests, experiments, and permanent plant modifications at your Wolf Creek Generating Station during July 6-10, 2015, and July 20-24, 2015. The inspection will consist of three reactor inspectors from the NRCs Region IV office for two weeks. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications.

Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.

Please note that the documents are requested to be provided by June 22, 2015. Upon review of these documents, the inspectors will select additional documentation for review upon arrival.

It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Larry Stevens of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Jonathan Braisted, by telephone at 817-200-1194 or by e-mail at Jonathan.Braisted@nrc.gov.

A. Heflin This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 50-482 License: NPF-42

Enclosure:

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Request for Information Electronic Distribution to the Wolf Creek Generating Station

Request for Information Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Wolf Creek Generating Station Inspection Report: 05000482/2015007 Inspection Dates: July 6-10, 2015, and July 20-24, 2015 Inspection Procedure: IP 71111.17T, Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Lead Inspector: Jonathan Braisted, Reactor Inspector Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic format (preferred) by June 22, 2015, to the attention of Jonathan Braisted. We request that you categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the onsite inspection. Also, the inspectors will select specific items from the information requested below and request from your staff additional documents needed during the onsite inspection weeks. We ask that the specific items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible.

1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations.
2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) performed since the last triennial modification inspection that did not result in an evaluation.
3. A list with descriptions of all 10 CFR 50.59 evaluations performed the last triennial modification inspection that did not result in an application for license amendment.
4. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial modification inspection.
5. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
6. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates.
7. Procedure(s) for implementing permanent plant modifications.
8. A list with descriptions of all permanent plant modifications since the last triennial modification inspection.

Enclosure

9. A list with descriptions of all corrective action documents related to permanent plant modifications since the last triennial modification inspection.
10. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.

Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can determine the safety and/or risk significance of the screenings, evaluations, and modifications.

Note: For this inspection, permanent plant modifications include permanent plant changes, design changes, set point changes, procedure changes, equivalency evaluations, suitability analyses, calculations, and commercial grade dedications Inspector Contact Information:

Jonathan Braisted Nnaerika Okonkwo Grant Larkin Reactor Inspector Reactor Inspector Emergency Response Coordinator 817-200-1194 817-200-1114 817-200-1449 Jonathan.Braisted@nrc.gov Nnaerika.Okonkwo@nrc.gov Grant.Larkin@nrc.gov Mailing Address:

U.S. NRC, Region IV Attn: Jonathan Braisted 1600 East Lamar Blvd.

Arlington, TX 76011-4125

A. Heflin This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket: 50-482 License: NPF-42

Enclosure:

Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications Inspection Request for Information Electronic Distribution to the Wolf Creek Generating Station Distribution See next page ML15135A486 SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword By: JDB Yes No Non-Sensitive Publicly Available NRC-002 OFFICE DRS/EB1/RI C:

NAME JBraisted TFarnholtz SIGNATURE /RA/ /RA/

DATE 5/13/15 5/14/15 OFFICIAL RECORD COPY

Letter from Adam C. Heflin from Thomas R. Farnholtz dated May 14, 2015

SUBJECT:

WOLF CREEK GENERATING STATION - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS, AND PERMANENT PLANT MODIFICATIONS INSPECTION (05000482/2015007) AND REQUEST FOR INFORMATION Distribution Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Chris.Speer@nrc.gov)

Resident Inspector (Raja.Stroble@nrc.gov)

WC Administrative Assistant (Carey.Spoon@nrc.gov)

Branch Chief, DRP/B (Andrew.Rosebrook@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)

Project Engineer, DRP/B (Steven.Janicki@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Team Leader, DRS/TSS (Don.Allen@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)