October 25, 2019

SUBJECT:

WOLF CREEK GENERATING STATION - INTEGRATED INSPECTION REPORT 05000482/2019003

Dear Mr. Reasoner:

On September 30, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Wolf Creek Generating Station. On October 8, 2019, the NRC inspectors discussed the results of this inspection with Mr. Jaime McCoy, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Neil F. O'Keefe, Chief Reactor Projects Branch B Division of Reactor Projects

Docket No. 05000482 License No. NPF-42

Enclosure:

As stated

Inspection Report

Docket Number:

05000482

License Number:

NPF-42

Report Number:

05000482/2019003

Enterprise Identifier: I-2019-003-0012

Licensee:

Wolf Creek Nuclear Operating Corp.

Facility:

Wolf Creek Generating Station

Location:

Burlington, Kansas

Inspection Dates:

July 1, 2019 to September 30, 2019

Inspectors:

M. Doyle, Operations Engineer

J. Melfi, Project Engineer

M. Stafford, Acting Senior Resident Inspector

C. Stott, Reactor Inspector

F. Thomas, Resident Inspector

J. Vera, Resident Inspector

Approved By:

Neil F. O'Keefe, Chief

Reactor Projects Branch B

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Wolf Creek Generating Station in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

Wolf Creek Generating Station began the inspection period at rated thermal power. On July 25, 2019, operators reduced power to approximately 80 percent to perform main turbine valve testing. The plant was restored to approximately full power on July 26, 2019. On September 21, 2019, a plant shutdown was completed to begin Refueling Outage 23. The plant remained shutdown for the remainder of the inspection period.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Impending Severe Weather Sample (IP Section 03.03) (1 Sample)

(1) The inspectors evaluated readiness for impending adverse weather conditions for severe thunderstorms on August 7, 2019.

External Flooding Sample (IP Section 03.04) (1 Sample)

(1) The inspectors evaluated readiness to cope with external flooding by reviewing the external flooding procedure on September 27, 2019.

71111.04Q - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Service water on August 15, 2019
(2) Emergency exhaust system and fuel building heating, ventilation, and air conditioning system on September 24, 2019
(3) Emergency diesel generator A lube oil system while emergency diesel generator B was out of service for maintenance on September 26, 2019

71111.05Q - Fire Protection

Quarterly Inspection (IP Section 03.01) (6 Samples)

The inspectors evaluated fire protection program implementation in the following selected areas:

(1) Diesel generator rooms A and B, fire areas D-1 and D-2, on July 15, 2019
(2) Engineered safety features switchgear rooms, control building elevation 2,000 feet, fire areas C-9 and C-10, on August 12, 2019
(3) Circulating water screen house, on August 16, 2019
(4) Battery rooms, control building elevation 2,016 feet, fire areas C-15 and C16, on September 3, 2019
(5) Essential service water pipe chase, control building elevation 1,974 feet, fire area C-1, on September 4, 2019
(6) Auxiliary feed pump piping room (hallway and below auxiliary feed pump area),auxiliary building, elevation 1,988 feet, fire area A-33, on September 9, 2019

71111.07T - Heat Sink Performance Triennial Review (IP Section 02.02)

The inspectors evaluated heat exchanger/sink performance on the following on August 1, 2019:

(1) Component cooling water heat exchanger EEG01B, cooled by essential service water, Section 02.02.b
(2) Containment air cooler SGN01C, cooled by essential service water, Section 02.02.b
(3) Control room air conditioning unit SGK04A, cooled by essential service water, Section 02.02.b
(4) Ultimate heat sink, Section 02.02.d, specifically Sections 02.02.d.2, 02.02.d.5, 02.02.d.6, and 02.02.d.7 were completed

71111.11A - Licensed Operator Requalification Program and Licensed Operator Performance

Requalification Examination Results (IP Section 03.03) (1 Sample)

(1) The inspectors reviewed and evaluated the licensed operator examination failure rates for the requalification annual operating exam administered on July 11, 2019.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the control room during plant shutdown for the refueling outage on September 20, 2019.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated operations crew performance during an emergency preparedness drill on August 21, 2019.

71111.12 - Maintenance Effectiveness

Routine Maintenance Effectiveness Inspection (IP Section 02.01) (3 Samples)

The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:

(1) May 24, 2019, start-up transformer electrical fault, reviewed on July 1, 2019
(2) Radiation monitors exceed maintenance rule performance criteria for unavailability, on August 13, 2019
(3) Emergency diesel generator train A intercooler temperature control valve failure, on September 17, 2019

Quality Control (IP Section 02.02) (1 Sample)

The inspectors evaluated maintenance and quality control activities associated with the following equipment performance activities:

(1) Quality control verifications and inspector qualifications were in accordance with the Quality Assurance Program, on September 25, 2019

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the risk assessments for the following planned and emergent work activities:

(1) Emergent, unplanned limiting condition for operation entry due to trip indication on group A backup heaters hand switch, on July 18, 2019
(2) Emergent work on diesel generator A following intercooler temperature control valve failure on August 20, 2019
(3) Planned work on the turbine driven auxiliary feed water pump and non-safety auxiliary feed water pump during the week of August 26, 2019
(4) Planned weekly risk assessment for work week 0310: September 2-8, 2019
(5) Planned weekly risk assessment for work week 0311: September 9-15, 2019
(6) Draindown of reactor vessel to lowered inventory on September 26, 2019

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 02.02) (3 Samples)

The inspectors evaluated the following operability determinations and functionality assessments:

(1) Change in reactor coolant pump A #1 seal leak-off trend on July 1, 2019
(2) Control room emergency ventilation system instrumentation failure during testing on August 12, 2019
(3) Switchyard functionality following capacitor bank failure on August 20, 2019

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) NG0403 breaker trip setting adjustment issue on July 3, 2019
(2) Modification to OFN BB-005, "RCP [Reactor Coolant Pump] Malfunctions," procedure to increase the maximum allowable reactor coolant pump A seal leakoff flowrate from 6.0 gpm to 7.5 gpm on July 11, 2019.

71111.19 - Post-Maintenance Testing

Post Maintenance Test Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the following post maintenance tests:

(1) Pressurizer backup heater group B testing following emergent maintenance on July 19, 2019
(2) Residual heat removal pump B post maintenance testing following planned maintenance on September 3, 2019
(3) Diesel generator A post maintenance testing following emergent maintenance on September 11, 2019

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Partial)

(1)

(Partial)

The inspectors evaluated Refueling Outage 23 activities from September 20-30, 2019. The inspectors completed inspection procedure Sections 03.01.a, 03.01.b, and portions of 03.01.c.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) STS IC-508A, "Refueling Water Storage Tank Level Transmitter Calibration,"

Revision 6, on July 22, 2019

(2) STS RE-006, "End of Life Moderator Temperature Coefficient Measurement," on August 2, 2019

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated the emergency preparedness drill on August 21,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicator submittals listed below:

MS06: Emergency AC Power Systems (IP Section 02.05)===

(1) July 1, 2018 through June 30, 2019

BI01: Reactor Coolant System (RCS) Specific Activity Sample (IP Section 02.10) (1 Sample)

(1) April 1, 2018 through June 30, 2019

BI02: RCS Leak Rate Sample (IP Section 02.11) (1 Sample)

(1) April 1, 2018 through June 30,

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On August 1, 2019, the inspectors presented the triennial heat sink performance inspection results to Mr. Jaime McCoy, Site Vice President, and other members of the licensee staff.
  • On October 8, 2019, the inspectors presented the integrated inspection results to Mr. Jaime McCoy, Site Vice President, and other members of the licensee staff.

THIRD PARTY REVIEWS

Inspectors reviewed an Institute on Nuclear Power Operations report that was issued during the inspection period.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Corrective Action

Documents

Condition Reports 134524, 134528

Procedures

AI 14-006

Severe Weather

AP 21A-002

Diverse and Flexible Coping Mitigation Strategies (FLEX)

Program

OFN SG-003

Natural Events

OFN SG-048

Flash Flood Warning

4B

71111.04Q Corrective Action

Documents

Condition Reports 136097

Drawings

KD-7496

One Line Diagram

M-126601

Piping and Instrumentation Diagram Fuel Building HVAC

M-12EA01

Piping & Instrumentation Diagram Service Water System

Procedures

CKL EA-120

Service Water System Normal Lineup

CKL GG-120

Normal Fuel Building HVAC Valve, Breaker and Handswitch

Checklist

71111.05Q Corrective Action

Documents

Condition Reports 134633, 134786, 135008, 135009

Miscellaneous

DWG 10466-A-

24

Control, D.G. & Comm. Corridor Floor Plans @ EL. 1974'-0"

& 1984'-0"

E-1F9905

Fire Hazard Analysis

Procedures

AP 10-102

Control of Combustible Materials

AP 10-106

Fire Preplans

18A

AP 12-001

Housekeeping Control

13A

MEC-004

Fire Extinguisher Inspections (Special Scope - ESW &

Power Block)

Work Orders

19-447892-000

71111.07T

Calculations

AN-05-016

Wolf Creek MSLB Containment Pressure and Temperature

Response Analyses with GOTHIC for the MSIV/MFIV

Replacement Project

EF-M-014

UHS Thermal Analysis-Review for Power Rerate

EF-M-076

Hydraulic Analysis for Essential Service Water (ESW)

System following a Loss of Offsite Power (LOOP)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

EF-M-078

Evaluation of Wolf Creek Essential Service Water (ESW)

System Modifications During LOOP/LOCA Conditions

EG-08-W

Minimum Wall Thickness of Tubing in Cooling Water Heat

Exchangers EEG01A & EEG01B

EG-09-W

Tube Plugging for CCW Heat Exchangers

EG-M-032

Component Cooling Water Heat Exchanger Performance

During Normal Operations, Shutdown @ Four Hours (and

hours), and Post-LOCA Recirculation

GK-M-001

Cooling and Heating Load Calculation for Control Room

HVAC System Capabilities During Normal Plant Operation

and Accident Conditions - (SGK04A/B)

GK-M-009

Tube Plugging Criteria for Control Room A/C Unit

SGK04A/B Condensers and ESF Switchgear Rooms A/C

Unit SGK05A/B Condensers

GK-M-010

Tube Pitting Criteria for Control Room SGK04A/B and

Electrical Switch Gear Rooms SGK05A/B Condensing Units

GN-M-011

Containment Air Coolers (SGN01A, SGN01B, SGN01C &

SGN01D) Tube Plugging Criteria

GN-S-006

WCGS AL-6XN Replacement Containment Air Cooler Coils

Evaluations for ASME Section III Subsections ND and NF

M-620B-00003

Coil Performance Topical Report AL-6XN Tube Coil Design

Z065-C-001

Evaluation of Annual UHS Sediment Measurements

Corrective Action

Documents

100760, 108297, 109186, 109235, 110843, 112152,

118078, 124483, 126112, 127356, 128710, 129369,

130538, 132023, 132360

Drawings

C-101

2018 Hydrographic Survey of the Ultimate Heat Sink and

ESWS Intake Channel

07/09/2018

C-K278

Essential Service Water Buried Pipe Replacement Project

Plan & Sections - Discharge Marine Work

M-13EF02

Piping Isometric Essential Service Water Sys. Aux. Bldg. A

Train Supply

M-1HX001, sh.

114

Heat Exchanger Tube Sheet Map Containment Cooler C

Water Box End SGN01C

M-1HX001, sh. 83 Heat Exchanger Tube Sheet Map Component Cooling Water 72

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Heat Exchanger B (South End) EEG01B

M-1HX001, sh. 96 Heat Exchanger Tube Sheet Map Control Room A/C

Condenser A West (Inlet) End SGK04A

Miscellaneous

Zebra Mussel Control Plan Desktop Guide

Strategic Lake Water Chemistry Plan

Final Report Containing the Results of the June 2018

Hydrographic Survey and the Engineering Report

07/17/2018

EF System Life Cycle Management Plan

ET 99-0042

Docket No. 50-482: Updated Response to Generic Letter 89-13

11/17/1999

M-072-016-05

Component Cooling Water Heat Exchanger

M-072-022-01

Component Cooling Water Heat Exchanger Data Sheet

M-620B-00003

Coil Performance Topical Report AL-6XN Tube Coil Design

W02

M-622.1A-VDS-

1.02

SGK04A/B Condenser Vendor Data Sheet

M-622.1A-VDS-

1.03

SGK04A/B DX Cooling Coil and Compressor Vendor Data

Sheet

W03

QH-2017-1591

SOER 07-2 Periodic Review Quick Hit Assessment

2/11/2017

SA-2013-0068

Lake Water Program Formal Self-Assessment

03/30/2015

SA-2019-0141

NRC - Triennial Heat Sink Performance Inspection - Heat

Exchangers/UHS

05/28/2019

STN PE-033

CCW Heat Exchanger Performance Testing

2/09/2013

STN PE-033

CCW Heat Exchanger Performance Testing

09/08/2016

STN PE-038

Containment Cooler Performance Test

04/11/2019

STN PE-038

Containment Cooler Performance Test

10/10/2017

Procedures

AI 28A-100

Condition Report Resolution

AI 28A-101

Non-Condition Adverse to Quality

AP 28A-100

Corrective Action Program

AP 29D-001

UHS Monitoring Program

2A

STN EF-020A

ESW Train A Warming Line Verification

STN EF-020B

ESW Train B Warming Line Verification

STN MT-004

Ultimate Heat Sink Dam Surveillance Vertical Movement

STN MT-005

Ultimate Heat Sink Reservoir and ESW Intake Channel

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Sedimentation Surveillance

SYS EF-205

ESW/Circ Water Cold Weather Operations

2A

TMP 04-016

Dredging the UHS and UHS Channel

Work Orders

11-343487-001, 14-390646-048, 14-390647-048,

15-396718-001, 15-399210-001, 15-399354-000,

15-406448-000, 15-407921-000, 15-407922-000,

15-409921-000, 16-410280-000, 16-413091-000,

16-418509-000, 16-420454-000, 17-425576-000,

17-425576-001, 17-426442-000, 17-430960-000,

18-434807-000, 18-437420-000, 18-440206-000,

18-440384-000, 18-440669-000, 18-441071-000,

18-445830-000

71111.11A

Miscellaneous

2019

Requalification

Examination

Results

71111.11 03.03, Requalification Examination Results,

Table 1: Examination Results

2/14/2018

71111.11Q Corrective Action

Documents

Condition Reports 135751, 135759

Procedures

AP 21-001

Conduct of Operations

83A

GEN 00-004

Power Operation

GEN 00-005

Minimum Load to Hot Standby

GEN 00-006

Hot Standby to Cold Shutdown

2A

STS BG-100A

Centrifugal Charging System "A" Train Inservice Pump Test

STS BG-210

CVCS Inservice Check Valve Test

71111.12

Corrective Action

Documents

Condition Reports 122637, 133314, 134550

Drawings

KD-7496

One Line Diagram

Miscellaneous

Plant Safety Review Committee Meeting 1590 Agenda and

Package

09/17/2019

Maintenance Rule Expert Panel Agenda and Package

07/25/2019

Quality Control Inspection Manual

Maintenance Rule Final Scope Evaluation: Off-Site Power

(Super System) - OF-01

07/22/2019

Maintenance Rule Final Scope Evaluation: Off-Site Power

07/22/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

(Super System) - OF-02

Maintenance Rule Final Scope Evaluation: Off-Site Power

(Super System) - OF-03

07/22/2019

Maintenance Rule Final Scope Evaluation: Off-Site Power

(Super System) - OF-04

07/22/2019

Maintenance Rule Final Scope Evaluation: Startup

Transformer System - MR-01

07/22/2019

Maintenance Rule Final Scope Evaluation: Startup

Transformer System - MR-02

07/22/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-01

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-02

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-03

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-04

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-05

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-06

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-07

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-08

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-09

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-10

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-11

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-12

08/14/2019

Maintenance Rule Final Scope Evaluation: Radiation

08/14/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Monitoring System - SP-13

Maintenance Rule Final Scope Evaluation: Radiation

Monitoring System - SP-14

08/14/2019

Maintenance Rule Final Scope Evaluation: Standby Diesel

Engine System/MSPI Emergency AC Power System - KJ-01

09/05/2019

Maintenance Rule Final Scope Evaluation: Standby Diesel

Engine System/MSPI Emergency AC Power System - KJ-02

09/05/2019

Maintenance Rule Final Scope Evaluation: Standby Diesel

Engine System/MSPI Emergency AC Power System - KJ-03

09/05/2019

Maintenance Rule Final Scope Evaluation: Standby Diesel

Engine System/MSPI Emergency AC Power System - KJ-04

09/05/2019

Maintenance Rule Final Scope Evaluation: Standby Diesel

Engine System/MSPI Emergency AC Power System - KJ-05

09/05/2019

Maintenance Rule Final Scope Evaluation: Standby Diesel

Engine System/MSPI Emergency AC Power System - KJ-06

09/05/2019

Maintenance Rule Final Scope Evaluation: Standby Diesel

Engine System/MSPI Emergency AC Power System - KJ-07

09/05/2019

Maintenance Rule Expert Panel Meeting Minutes

08/13/2019

Maintenance Rule Unavailability Alert List: Last 18 Months

08/13/2019

AIF 28A-100-08

Equipment Performance Evaluation: Leak on Diesel Fire

Pump Intercooler Threaded Connection - FP - CR 133771

AO 19-0020

Wolf Creek - Interoffice Correspondence: PSRC Meeting

Minutes #1589

09/11/2019

APF 23M-001-01

Maintenance Rule (a)(1) Determination: XMR01, CR 132693

07/11/2019

APF 23M-001-01

Maintenance Rule (a)(1) Determination: FP-01 - CR 133771

08/05/2019

Procedures

CNT-MC-630

Erection of Structural and Miscellaneous Steel, and Pipe

Whip Restraints

CNT-MM-400

Field Fabrication and Installation of HVAC Ductwork and

Supports

CWD-1

Control of Welding Documentation

QCP-20-601

Visual Examination of AWS Welds

QCP-30-101

Qualification and Certification of Inspection Personnel

STS NB-005

Breaker Alignment Verification

34A

71111.13

Corrective Action

Condition Reports 135501, 135502, 135503

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

Miscellaneous

Archived Operator Log

09/11/2019

Control Room Deficiency Log

07/18/2019

2019 Work Week 309

2019 Work Week 309

APF 21-001-02

Control Room Turnover Checklist: On-Coming CRS/WC

SRO/RO/BOP Review - Night Shift

09/04/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk Assessment:

Schedule Week 19-0306

08/05/2019

to

08/11/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk Assessment:

Schedule Week 19-0312

09/16/2019

to

09/23/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk Assessment:

Schedule Week 19-0308

08/20/2019

to

08/26/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk Assessment:

Schedule Week 19-0311

09/09/2019

to

09/15/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk Assessment:

Schedule Week 19-0310

09/02/2019

to

09/08/2019

APF 22C-003-01

On-Line Nuclear Safety and Generation Risk Assessment:

Schedule Week 19-0303

07/15/2019

to

07/21/2019

Procedures

AP 22C-003

On-Line Nuclear Safety and Generation Risk Assessment

AP 26C-004

Operability Determination and Functionality Assessment

71111.15

Corrective Action

Documents

Condition Reports 134620, 134853

Drawings

KD-7496

One Line Diagram

M-12GK01

Piping & Instrumentation Diagram Control Building H.V.A.C.

Miscellaneous

APF 21-200-04

ODMI Level 2 Form - Title: "A" RCP #1 Seal Leak Off

08/22/2019

APF 30B-004-01

Wolf Creek Nuclear Operating Corporation - Essential

Required Reading - Subject: A RCP #1 Seal leak Off Limits -

07/11/2019

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

No. 19-0014

APF 30B-004-01

Wolf Creek Nuclear Operating Corporation - Essential

Required Reading - Subject: ODMI - No. 19.0015

07/17/2019

NE 15-0011

Transmittal of Design Information - Alternate Source Term

(AST) Inputs Requested in LTR-CRA-14-196

03/26/2015

WCOP-30

Response Time Test Summary: SR 3.3.7.6

Procedures

STS GK-005A

Control Room Ventilation Isolation Response Time Test -

Train A

71111.18

Drawings

E-11NG01

Low Voltage System Class IE 480 V Single Line Meter &

Relay Diagram

E-11NG02

Low Voltage System Class IE 480 V Single Line Meter &

Relay Diagram

Miscellaneous

19-005-BG

Design Equivalent Change Package - 'A' RCP #1 Seal

Injection Heat Exchanger

o

APF 05-002-05

Engineering Disposition: AKR-30 Battery Charger Supply

Breaker Setting Changes - Change Package #: 014726

APF 05-013-01

E-017-00397 Instruction Manual for Load Center Unit

Substations

W26

APF 15C-004-01

Document Revision Request (DRR) - Document Title: RCP

Malfunctions

APF 16C-006-03

Work Order Revision Sheet - WO No.: 18-438071-001

APF 26A-003-01

Applicability Determination - Activity Title: RCP Malfunctions

APF 26A-003-02

50.59 Screen - Activity Title: RCP Malfunctions

APF-05D-001-02

Calculation Change Notice - Cable Sizing

06/30/2010

GPD-2706

Calculation Sheet: Cable Sizing

07/09/1993

Procedures

MPM M712Q-02

Reactor Coolant Pump Seal Cartridge Inspection/Rebuild

Work Orders

18-438071-001, 19-452399-000

71111.19

Corrective Action

Documents

Condition Reports 135277

Miscellaneous

APF 22C-008-01

Qualitative Risk Screening: EJFCV0611

09/03/2019

APF 29B-003-01

Surveillance Test Routing Sheet: 'B' Train Breaker

Operability and ECCS Pump Recirc

09/03/2019

APF 29B-003-01

Surveillance Test Routing Sheet: RHR System Valve

09/03/2019

Procedures

STN EJ-206

RHR System Valve Test

9A

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.20

Corrective Action

Documents

Condition Reports 135876, 135885

Miscellaneous

RF23 Refuel PowerPoint Presentation

On the Spot Change for GEN 00-005, Minimum Load to Hot

Standby

09/18/2019

Procedures

AI 02-005

Primary and Radwaste Guidelines for Plant Startup and

Shutdown

EMG E-0

Reactor Trip or Safety Injection

EMG ES-02

Reactor Trip Response

GEN 00-005

Minimum Load to Hot Standby

GEN 00-006

Hot Standby to Cold Shutdown

2A

71114.06

Miscellaneous

Wolf Creek Generating Station Emergency Planning Drill

Package: 19-SA-02

EPF 06-007-02

WCGS Immediate Emergency Notification

EPF 06-007-02

WCGS Immediate Emergency Notification

0A

EPF 06-007-03

WCGS Follow-Up Emergency Notification

EPF 06-007-03

WCGS Follow-Up Emergency Notification

0A

Procedures

EPP 06-007

Emergency Notifications

71151

Miscellaneous

MSPI Derivation Report: MSPI Emergency AC Power

System - Unavailability Index (UAI)

07/01/2019

to

07/31/2019

MSPI Derivation Report: MSPI Emergency AC Power

System - Unreliability Index (URI)

07/01/2019

to

07/31/2019

Procedures

AP 26A-007

NRC Performance Indicators

AP 29G-001

RCS Unidentified Leak Rate Monitoring Program

STS BB-004

RCS Water Inventory Balance

STS BB-006

RCS Water Inventory Balance Using the NPIS Computer

20