IR 05000382/2015401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15244B213
| number = ML15244B213
| issue date = 09/01/2015
| issue date = 09/01/2015
| title = Non-Public Security Inspection Plan For Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2015401)
| title = Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2015401)
| author name = Haire M S
| author name = Haire M
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Chisum M R
| addressee name = Chisum M
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| docket = 05000382
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:" " September 1, 2015 Mr. Michael Site Vice President Entergy Operations, Inc. 17265 River Road Killona, LA 70057-0751
{{#Wiki_filter:ber 1, 2015


SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000382/2015401)
==SUBJECT:==
NON-PUBLIC SECURITY INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000382/2015401)


==Dear Mr. Chisum:==
==Dear Mr. Chisum:==
On August 13, 2015, the NRC completed its mid-cycle performance review of Waterford Steam Electric Station, Unit 3. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.
On August 13, 2015, the NRC completed its mid-cycle performance review of Waterford Steam Electric Station, Unit 3. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.


The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility. While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country. Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.
The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.


Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.


===Enclosure:===
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
Inspection Plan cc w/encl: Mr. André James Manager, Security Entergy Operations, Inc. 17265 River Road Killona, LA 70057-0751 cc w/o encl: Electronic Distribution for Waterford Steam Electric Station
 
Please contact me at (817) 200-1527 with any questions you have regarding this letter.
 
Sincerely,
/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38 Enclosure:
Inspection Plan cc w/encl:
Mr. André James Manager, Security Entergy Operations, Inc.
 
17265 River Road Killona, LA 70057-0751 cc w/o encl:
Electronic Distribution for Waterford Steam Electric Station
}}
}}

Latest revision as of 07:05, 31 October 2019

Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (NRC Physical Security Inspection Report Number 05000382/2015401)
ML15244B213
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/01/2015
From: Mark Haire
Plant Support Branch-1
To: Chisum M
Entergy Operations
References
IR 2015401
Download: ML15244B213 (4)


Text

ber 1, 2015

SUBJECT:

NON-PUBLIC SECURITY INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000382/2015401)

Dear Mr. Chisum:

On August 13, 2015, the NRC completed its mid-cycle performance review of Waterford Steam Electric Station, Unit 3. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRCs plans for future security-related inspections at your facility.

The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. Routine force-on-force inspections are conducted approximately every 3 years. You will be notified by separate correspondence 8 to 10 weeks in advance of any force-on-force inspections scheduled for your facility.

While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.

Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38 Enclosure:

Inspection Plan cc w/encl:

Mr. André James Manager, Security Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751 cc w/o encl:

Electronic Distribution for Waterford Steam Electric Station